[Solomon Westerman] [PM]

Slides:



Advertisements
Similar presentations
Terminal velocity Weight Falling Air resistance Terminal velocity Questions.
Advertisements

AAE450 Spring 2009 Reliability Analysis Solomon Westerman, PM Week 5, 2/12/09 [Solomon Westerman] [PM] 1.
SPIN
Lesson: Measurement. Science Differentiation in action Important measurements include: Length -Distance between two points Area -Amount of surface Volume.
AAE450 Spring 2009 Time to Complete 50m/s ΔV & 100g Payload System Overview Brittany Waletzko 100g Payload Integration Manager Translunar/OTV Phase Week.
AAE450 Spring 2009 Hopper Trajectory February 26, 2009 [Alex Whiteman] [Mission Ops] [Lunar Descent] Page 1.
The Lander is at a 25 km Lunar altitude and an orbital period of approximately 110 minutes. After separation occurs the Lander is completely self sufficient.
AAE450 Spring 2009 Slide 1 of 8 Orbital Transfer Vehicle (OTV) Masses and Costs Ian Meginnis March 12, 2009 Group Leader - Power Systems Phase Leader -
AAE450 Spring 2009 Week 9 [Solomon Westerman] [PM] Design Freeze on Thursday night!
AAE450 Spring Spinning Descent and Compressed Gas Hopper Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis.
AAE450 Spring 2009 OTV 3-D GEOMETRY & INTEGRATION Korey LeMond STRC/THM/INTEG GL, OTV Phase [Korey LeMond] [STRC/THM/INTEG/CAD GL, OTV Phase] 1.
AAE450 Spring 2009 Lunar Descent Final Numbers Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 03/12/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Week 6 [Solomon Westerman] [PM] PDR Complete! Check the website if you have any mission requirement questions!
AAE450 Spring 2009 Cost Analysis, Redux Solomon Westerman Week9: 3/12/09 [Solomon Westerman][PM]Page 1/3.
AAE450 Spring 2009 Lunar Lander Preliminary propulsion system selection and design analysis Thursday, January 22, 2009 Thaddaeus Halsmer, Propulsion.
AAE450 Spring 2009 Lunar Capture Altitude Mass to LLO for Arbitrary Time to Rotate Lander During Descent Camera/Dust Removal [Kara Akgulian] [Mission Ops]
AAE450 Spring 2009 Hopper Design Alternative Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 02/26/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Presentation Notes 1.Good Q&A Becoming ‘experts’ on your system! 2.Give background information / assumptions [Solomon Westerman] [PM]
AAE450 Spring 2009 Week 4 Project Timeline [Solomon Westerman] [PM]
Measuring Matter.
Инвестиционный паспорт Муниципального образования «Целинский район»
Force of Gravity Pre-Lab Are the forces of gravity acting on the two students different? What is another term that means the force of gravity? Weight –
Formative Assessment. 1. A 130. gram uniform meter stick has a 22.0 g clamp on the 23.0 cm mark, where would you clamp a 35.0 g clamp to make the meter.
(x – 8) (x + 8) = 0 x – 8 = 0 x + 8 = x = 8 x = (x + 5) (x + 2) = 0 x + 5 = 0 x + 2 = x = - 5 x = - 2.
The Apollo 11 Moon Landing
CG CM Center of Mass The Center of Mass (CM) of an object or objects is the point that moves as if all of the mass were concentrated there and all the.
AAE450 Spring 2009 Kelly Leffel 2/5/09 Structures and Thermal Lunar Descent Phase Kelly Leffel Structures and Thermal 1.
AAE450 Spring 2009 Final Lander Volume and Mass 10kg, 100g, Arbitrary March 12, 2009 Lunar Descent Phase Group [Ryan Nelson] [STRC] 1.
Balance and Motion. Investigation 1: Balance arch A curved shape.
照片档案整理 一、照片档案的含义 二、照片档案的归档范围 三、 卷内照片的分类、组卷、排序与编号 四、填写照片档案说明 五、照片档案编目及封面、备考填写 六、数码照片整理方法 七、照片档案的保管与保护.
공무원연금관리공단 광주지부 공무원대부등 공적연금 연계제도 공무원연금관리공단 광주지부. 공적연금 연계제도 국민연금과 직역연금 ( 공무원 / 사학 / 군인 / 별정우체국 ) 간의 연계가 이루어지지 않고 있 어 공적연금의 사각지대가 발생해 노후생활안정 달성 미흡 연계제도 시행전.
CubeSat-Class Spinning Landers for Mars Rex Ridenoure Ecliptic Enterprises Corporation Mars CubeSat/NanoSat Workshop JPL 2014 Nov
Measurement and Geometry 36 1 g 1 kg kilogram hectogram decagram gram ÷ 10 ÷ 10 ÷ 10 x 10 x 10 x 10.
Жюль Верн ( ). Я мальчиком мечтал, читая Жюля Верна, Что тени вымысла плоть обретут для нас; Что поплывет судно громадней «Грейт Истерна»; Что.
AAE450 Spring 2009 Lander Sizing and Launch Vibrations Feb. 12, 2009 Earth Launch/Lunar Descent Phase Group 1 [Ryan Nelson] [STRC]
Week 3 Bell Works Political Science. Political Science Monday’s Bell Work Today’s bell work: Write down at least two pieces of information you learned.
PLANETS DEONTYE D. DEANS. Radius: 1,516 mi Mass: * 10^23 kg (0.055 Mo) Length of Day: 58d 15h 30m Orbital period: 88 days Gravity: 3.7 m/s Surface.
New World Thinking For Tomorrow’s Challenges
K-W’s Kindergarten Calendar Week of Oct. 31st- Nov. 4th
How to calculate the torque due to the balance stick
The UK Tier 1 Entrepreneur Visa and the UK Representative of Overseas Business Visa - SmartMove2UK
[Cory Alban] [Mission Ops] [Locomotion]
Sprint 5 Schedule (15 – 2 days)
Lab Equipment.
Attitude, Lunar Transfer Phase
Architecture Selection Logic
Ian Meginnis January 29, 2009 Group Leader - Power Systems
Lunar Descent Slide Suggestions & Questions
Lunar Descent Trajectory
Lunar Descent Analysis
Mass Mass refers to the amount of matter in an object.
Solomon Westerman, PM “Polished” Final Slide Layout Week 13.
Final Presentation Slides
[Solomon Westerman] [PM]
Easter training camp – swim/ skills camp
Solomon Westerman Week3 1/29/09
John Dixon Communications Group Lead Locomotion Phase Lead
Conservation of Mass Problem
[Solomon Westerman] [PM]
Year 2 Spring Term Week 12 Lesson 3
Earth’s Atmosphere.
ONLY 16 DAYS of SCHOOL LEFT!
Final Slides Attitude Control System (ACS) – Lunar Transfer
Year 2 Spring Term Week 5 Lesson 1
© T Madas.
Bell Work: weight Define weight What are the units for weight?
Monday 8/15 Free Day Inference: a conclusion you come to based off of reasoning.
Week of January 30 – February 3, 2017
Bell Schedule for First Two Weeks of School
Ian Meginnis January 29, 2009 Group Leader - Power Systems
Presentation transcript:

[Solomon Westerman] [PM] If you have a broomstick with a lead weight attached to one end and cut the stick at it’s balancing point, which side is heavier? [Solomon Westerman] [PM]

[Solomon Westerman] [PM] To Do X1 Progress Should have firm numbers on mass / power / volume today Further iterate on these numbers to match well between groups (X2 analysis will help with this) X2 Timeline Today 4:00 – TLI Monday 4:00 – Lunar Descent Tuesday 4:00 – Locomotion Those not actively involved in X2 design (priority) should be performing work in X3,X4 designs Attendance [Solomon Westerman] [PM]

[Solomon Westerman] [PM] Design (Week) X0 (2) X1 (3,4) X2 (4) X3 (4) X4 (4) Main Purpose Initial design Refined GLXP design Scalability analysis Effect of firm landing Effect of spin stabilization Landing Soft (<10g’s) Firm (<100g’s) TBD Locomotion Rover TLI Hohmann (cryo) Spiral (EP) Stabilization 3-axis Spin OTV or lander Mass to Lunar surface ~250 kg ~ 150 kg? As large as X1 will allow [Solomon Westerman] [PM]