Engineering Process Improvement

Slides:



Advertisements
Similar presentations
Raising the Standard for Improved Flood Risk Management in the Midwest Raising the Standard for Improved Flood Risk Management in the Midwest Interagency.
Advertisements

Advances in Modeling and Simulation for US Nuclear Stockpile Stewardship February 2, 2009 James S. Peery Director Computers, Computation, Informatics and.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
Parts Standardization and Management Committee (PSMC)
INFORMATION SYSTEMS & GLOBAL SERVICES Craig Solem, CISSP Lockheed Martin Information Systems and Global Services Program Manager, Joint Medical information.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
Capability Maturity Model Integration (CMMI). CMMI Enterprise-wide process improvement framework Focuses on processes for improved product Process areas:
M I S S I O N The Army SBIR program is designed to provide small, high-tech businesses the opportunity to propose innovative research and development solutions.
Pg. 1 Intranets and Extranets in Business Internet and Business - strategic business applications. Internet and Business - strategic business applications.
Strategic Project Alignment With Team Expert Choice
MECHANICAL ENGINEERING & ELECTRICAL ENGINEERING RAUL REYES 1 ST PERIOD.
Capability Maturity Model Integration (CMMI) COMP Group Assignment #1 Ario Nejad, Davit Stepanyan, Ian Jackman, Sebastian Henneberg, Wan Chi Chio.
Department of Engineering Management, Information & Systems Systems Engineering Program Executive MS SE Degree Program A fast-track two-year program offering.
US Corporate Research Center (USCRC). © ABB USCRC 2 Strengthening Research in U.S. US Corporate Research - A branch of ABB’s Global R&D Labs  Raleigh.
© 2014 The MITRE Corporation. All rights reserved. Greg Nelson June 23, 2014 Aviation Safety Information Analysis and Sharing (ASIAS) Overview.
Transportation in the U.S. Critical Infrastructure The Development of a Methodology and Mathematical Model for Assessing the Impacts of K Links Disconnects.
1 South Limestone Street | Springfield, Ohio | | ren-services.com Renaissance Services: Capabilities, Experience, and Solutions November.
CMS 00_ Copyright 2002 Raytheon Company All Rights Reserved CMMI – What a Difference a Sponsor Makes! Ann Turner Raytheon Company
Pb-Free Electronics Risk Management (PERM). What PERM is: A Consortium sponsored by the Aerospace Industries Association (AIA) Includes industry and government.
Homeland Security UNCLASSIFIED United States Coast Guard Office of Port and Facility Compliance (CG-FAC) Cyber Security and the Marine Transportation System.
1 Shahrukh R. Tarapore Research Scientist Mnemosyne: Program Analysis Tools for HPC Code Optimization Lockheed Martin Advanced Technology Laboratories.
EngMat/JWS.PPT 10/17/ CMMI ® Today – The Current State CMMI ® Technology Conference 2003 November 18, 2003 Ron Paulson Vice President, Engineering.
1 The Millennia Contract By Anthony Guerra Team Leader, Federal Computer Acquisition Center.
Workforce Development Program
2008 PSMC Conference MyParts Part selection/management.
 Management ◦ The activities and tasks undertaken by one or more persons for the purpose of planning and controlling the activities of other in order.
Collaborate 2009 Projects SIG Suhail Maqsood Vice President.
2006 West Virginia GIS Forum. Objectives 1) Centralize all infrastructure responsibilities. 2) Select common (standard) hardware, software and service.
Design integrated, customized e-Learning solutions Expand core capabilities through acquisitions Thoughtfully integrate business units Implement best.
Defense Nuclear Facilities Safety Board September 26, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office of Quality Assurance.
Microsoft And Partners Driving Global Integration Solutions With BizTalk Server 2004 Ted Kummert Vice President Microsoft Corporation Business Process.
Industry Day DoD Parts Management Reengineering LMI McLean, VA May 8, 2007 Parts Standardization and Management Committee (PSMC )
UNCLASSIFIED 1 Industry Opportunity for Participation in AMCOM’s Army Working Capital Fund (AWCF) Investment Projects Process Overview Lorenzo Thomas AMCOM.
Summer – Fall 2006 Internship Nick DiBuono Intern Presentation.
INCOSE IW 2012 MBSE Workshop Systems Modeling
1 Copyright © 2014 by Lockheed Martin Corporation SE Use Cases SysML Roadmap Activity John Watson Lockheed Martin 6/17/2014.
International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA INCOSE IW 2012 MBSE Workshop INCOSE MBSE Initiative Methods and Metrics Activity John C. Watson.
A Program of Training for CMMI®-based Process Improvement
Learning Management System
Project Execution Planning for Building Information Modeling
DMSMS Management at NAVICP
John C. Watson Principal Member of Engineering Staff
FINAL (Living Charter)
PMRIPT Portal Team.
Army Working Capital Fund (AWCF) Investments Process and Opportunities
Noel Evans IERWG meeting Budapest, 13th April, 2016
Raytheon Parts Management
Scenario Scoping Process
Future Look of DOD Parts Management
ارائه كننده: شاهين انتصاري
MATHCOUNTS Founding Sponsors
Army Working Capital Fund (AWCF) Investments Process and Opportunities
By Jeff Burklo, Director
Jeff Kao President, North America Acute Care
Cascading Failure Working Group of
AM Business Model Wargame Working Team Documentation
AM Business Model Wargame Working Team Documentation
DMSMS Management at NAVICP
A Case Study of Transitioning: The CMMI Rosetta Stone
DRAFT America Makes Parts Family Classification Working Group Charter
Scenario Scoping Process
POLICY, CONTRACTING, SYSTEMS ENGINEERING, and EDUCATION SUBCOMMITTEE SUMMARY PSMC Meeting April 20 – 23, 2010 LMI, McLean, VA.
DoD MAINTENANCE CONTRACTORS
Define Your IT Strategy
Future Airborne Capability Environment (FACE™) Support
Metrics Organizational Guidelines [1]
Status of SysML v2 Planning & Requirements
Capability Maturity Model
Presentation transcript:

Engineering Process Improvement Component Technical Issues Working Group Aegis Production Program Office MS2 – Moorestown NJ April 29, 2008 @ LMI for PSMC

Engineering Process Improvement (EPI) Engineering Process Improvement Center (EPIC) Corporate Funded and Supported Located in Camden NJ Coordination of Engineering Improvement activities across all Lockheed Martin Businesses Monthly Newsletter Email Forums Systems, Software, Electrical, Mechanical, Project Management, and other Focus/Working & Process Groups PWB/CCA, Design for Six Sigma, Supportability, & Component Technology Issues The EPIC is corp. funded and supported. Providing the needed support to all business unit across the company.

Engineering Process Improvement (EPI) Component Technology Issues – Working Group (CTI-WG) Formed under the Electric Subcouncil (2001) EPI Facilitator – Bill Dreisbach, Cherry Hill NJ Leader – Ron Watson, MS2 Baltimore, MD Focus and prioritize component issues Parts Management Obsolescence Risk Management Technology Refresh Prediction Technology Roadmapping Tools & Services Evaluation

Lockheed Martin EPI Developed Plans LM EPI Developed Plans Parts Management Plan Guideline Complies with EIA 4899 and others Obsolescence Management Plan Guideline Supporting Lockheed Martian business needs Defense MicroElectronic Activity (DMEA) Contractual Requirements EIA – Bulletin GEB1 DMSMS Management Practices Entry Level Management Practices Parts Management Plan is compliant with requirements of Electronic Industries Alliance (EIA) 4899 Standard for Preparing an Electronic Components Management Plan (ECMP) and IEC/PAS 62239 Electronic Component Management Plans

PMPG Purpose PMPG Purpose To standardize part management plans across Lockheed Martin companies Terms & Definitions CTI-WG Lexicon General Component Application Qualification Requirements Component Data Control

PMPG Purpose Improve risk Mitigation and Management Component Reliability and Dependability Component Obsolescence Management Leverage resources across Lockheed Martin companies EPIC Current use on a portion of the DD(X) with Raytheon.

Obsolescence Management Plan Guidelines Purpose OMPG Purpose To standardize obsolescence management processes across Lockheed Martin companies Terms & Definitions CTI-WG Lexicon Responsibilities Approach to Obsolescence Solutions Tool, service, and applications Leverage resources across Lockheed Martin companies EPIC