Existing Boat Facilities

Slides:



Advertisements
Similar presentations
5 Insurance Coverages Every Harbor Master Should Know.
Advertisements

Town of St. Anthony. The Cruise Ship Docking Area is surrounded by Incredible Natural Beauty.. Visitors do not have to disembark from the ship to enjoy.
Joe Rouse California Department of Transportation Division of Traffic Operations Office of System Management Operations.
Case Study: Puyallup Mall
Corrections System Master Plan PRELIMINARY CAPITAL PLAN SUMMARY SEPTEMBER 5, 2007 CARTER GOBLE LEE In association with CH2M HILL.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
1.2.2 Design Charette By: C.J. Wyatt David Panyathong
Beach Park American Legion Drive & First St. Parking Lot & Boat Ramp Passes & Bait.
Potential Locations for SAR 2012 Parking lot South of Boat Ramp Festival Hall Grass Area Reef Point Marina Parking Lot.
 Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.
DOUBLE BAY MARINA REDEVELOPMENT PROPOSAL D/A # 844/2007/1 Lot and DP No:Lot 13 DP Lot 1 DP
Phase Difference = Phase Difference = 0.05.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Elements of Highway Design Highway Design SafetyEfficiency.
Wave Energy Solar Radiation  Wind  Waves Wave Size Factors
Americans with Disabilities Act Status Update What All Camp Directors Need to Know Presented by Jennifer K. Skulski National Center on Accessibility
Redwood City Ferry Terminal Why Ferry Service Terminal Needs Locational Analysis Land availability for 5-6 acre terminal Vehicular access Environmental.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Isles of Lake Hancock Homeowners Association, Inc. District 1 July 28, 2015.
2010 Revised ADA Regulations: Safe Harbor 2010 Revised ADA Regulations Mid-Atlantic ADA Center Silver Spring, Maryland March 10, 2011.
Multiplying and Dividing Decimals by 10, 100, and 1,000
SWP Recreation and the Oroville Facilities RMP Mark E. Andersen, P.E., Assistant State Water Project Deputy Director Northwest Hydropower Association February.
Metro North County Transit Center Presentation to City of Ferguson – October 22, 2013.
SHIP REPAIR, VESSEL CONSTRUCTION & BOAT BUILDING IN DURBAN HARBOUR AUGUST 2010 SUMMIT PRESENTATION BY KEN FROISE 1.Introduction 2.Transnet / Ethekwini.
Chilmark Menemsha Harbor Phase 3. Menemsha Boathouse Fire July 2010.
Lecture 1 :- Introduction Project Lifecycle Project Stakeholders Lecturer: Kawther Abas Monday: 3/4/1435 (8-11) 447CS – Management of Programming Projects.
Recreational Boating and Sport Angler Access Program.
Which is closer to the boat; the bird or the fish?
Policy for New/Modified Access to Controlled Access Facilities.
Adding Integers on a Number Line
FISHING SYMBOLS BY HAYDEN, 2 ND GRADE. FISHING SYMBOLS This symbol means people are motor boating.
Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.
Subtracting Integers on a Number Line. How to subtract using a number line Place a circle on the number line to represent the first number in the problem.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Independence Community Association, Inc. Environmental Protection Division.
Strategic Plan Todd Skiles –
1 Expansion of San Diego Freedom Ranch Expansion of San Diego Freedom Ranch.
2011 Waterfront Neighborhood Master Plan Proposed by Philip Bona Baucentrum Urban Studio Architecture / Planning / Research Philip J. Bona AIA, NCARB,
1 Temporary Construction Staging Area Licensing Agreement for Peabody Hotel April 1, 2008 Orange County Convention Center.
Harbor Walk Project Phase 1 Includes: Seawall Replacement Pedestrian Promenade Sidewalk Connection Small Boat Launch Parking Restroom Facility FDOT Funding.
A-6-PSD Slide 1. A-6-PSD Slide 2 Broadway Pacific Highway B Street Pier & Cruise Ship Terminal Lane Field Navy Broadway Complex Harbor.
What we fix!!! Campers, Boats, Motors, and Docks.
Purchase Gangways Online at Affordable Price
Designs for Health (Project Protein) Economic Development Incentive Agreement.
ENGH 375 FINAL PROJECT PRESENTATION Sharon O’Boyle May 2014.
Rezoning Application #1277 Use Permit Applications #1044 & 1045 Hampton City Council January 14, 2009 Wallace Marina 365 Dandy Point Road.
Morelli Park Reconstruction and Expansion Project Public Hearing and Award of Construction Contract Stockton City Council and Stockton Redevelopment Agency.
Restoration of the Swan Pond Embayment Michelle Cagley, Tennessee Valley Authority.
Buy Floating Docks Online
OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT.
The Ultimate Fishing Getaway
323 Martins Creek Lane Beresford Hall | Charleston | MLS# | $350,000
2016 FCS Bond Project #5 Franklinton Middle School - Elevator & Toilet Renovation, H/C Exterior Ramp Scope: This project will upgrade the existing middle.
UTILITY DESIGN SERVICES
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
Sinking Fund Millage Proposal
INDOOR BASEBALL / SOFTBALL FACILITY
2016 Florida Inland Navigation District Proposed Applications
INDUSTRIAL / COMMERCIAL Facility For Lease
Example 1: Solve a Right Triangle Example 2: Real-World Example
Gone Fishing Lodge.
Subtraction Facts Harold goes fishing!.
St. Marys Intracoastal Gateway.

Donna – Rio Bravo International Border Crossing
Sandy Grove Middle School
Reference datasets.
ORION ALTERNATIVE SCHOOL
Modified at -
Breaches.
WI Natural Resources Board June 2017 Webcast
Project Location: 35th Ave HSIP8
Presentation transcript:

Existing Boat Facilities Palms Fish Camp Existing Boat Facilities 2-Lane Boat Ramp 150’ Floating Dock to right of ramp 70’ Fixed Pier to left of ramp (no docking)

Increased Demand for Docking Space Since Restaurant Opening Palms Fish Camp Increased Demand for Docking Space Since Restaurant Opening

Planned Dock Expansion Palms Fish Camp Planned Dock Expansion Scope Phase 1: Modify fixed pier & add floating dock w/gangway for ramp users to alleviate conflicts Phase 2: Add 210 feet of additional floating dock to support demand created by restaurant Construction Cost Phase 1: $250,000 Phase 2: $700,000 (FIND application) Proposed Existing