“All Lawson, All the Time!”

Slides:



Advertisements
Similar presentations
ISeries Skip Upgrade External Sales Presentation September,2005.
Advertisements

System Construction and Implementation Objectives:
Network Design and Implementation
Copyright © 2009 Rolta International, Inc., All Rights Reserved a c c e l R12™ Upgrade Approach.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Introduction to z/OS Basics © 2006 IBM Corporation Chapter 8: Designing and developing applications for z/OS.
DBS to DBS i 5.0 Environment Strategy. Agenda Recommended Reference Information Roles & Responsibilities Environment Activities by Phase o Pre-Planning.
JOBS IN IT.
Migrating to EPiServer CMS 5 Johan Björnfot -
Update your servers to service pack 2. Ensure that the environment is fully functioning. Migrate to 64 bit servers is necessary. REVIEW UPGRADE BEST PRACTICES.
Introduction to the new mainframe © Copyright IBM Corp., All rights reserved. Chapter 7: Designing and developing applications for z/OS.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Planning for Year-end Processing in the United States
E-Business on Solid Ground. Lawson Release 8.0 Technical Aspects Preparing to upgrade, etc. Rocky Mountain Lawson User Group December 6, 2001 Brian Beckman.
XA R7.8 Upgrade Process and Technical Overview Ruth Anne Pharr Sr. IT Consultant, CISTECH Inc.
Clarity Educational Community Get the Results You Need When You Need Them Transitioning to CA PPM On Demand Presented by: Joshua.
DBS to DBSi 5.0 Environment Strategy Quinn March 22, 2011.
LESSON 8 Booklet Sections: 12 & 13 Systems Analysis.
Online Database Support Experiences Diana Bonham, Dennis Box, Anil Kumar, Julie Trumbo, Nelly Stanfield.
November 27, 2007Pebble Project Agency Meetings Pebble Project Data Management Data Management Responsibilities Ensure complete and accurate field and.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Database Design and Management CPTG /23/2015Chapter 12 of 38 Functions of a Database Store data Store data School: student records, class schedules,
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
UpgradeX and CloudSuite What you need to know. WHY?
1 Chapter Overview Preparing to Upgrade Performing a Version Upgrade from Microsoft SQL Server 7.0 Performing an Online Database Upgrade from SQL Server.
Module 4: Systems Development Chapter 14: Design And Implementation.
Overview of the Automated Build & Deployment Process Johnita Beasley Tuesday, April 29, 2008.
IT Priorities Minimize CAPEX Maximize employee productivity Grow the business Add new compute resources real- time to support growth Meet compliance requirements.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
TrainingRegister® Training Management Software Maintain Permanent Training Records for Each Individual Monitor and Track Required Training Know Who Needs.
Foundation Services SaaS/P4C/Bookkeeping Chad Ode.
Bina Nusantara 19 C H A P T E R SYSTEM CONSTRUCTION AND IMPLEMENTATION.
CCNA1 v3 Module 1 v3 CCNA 1 Module 1 JEOPARDY K. Martin.
2: Operating Systems Networking for Home & Small Business.
The information systems lifecycle Far more boring than you ever dreamed possible!
Proctor Caching and System Check September 4, 2014 Becky Hoeft Conference Number: (877) Conference Pin:
Technology Coordinator Training. Agenda Getting Started Using SystemCheck Technology Configurations Infrastructure Trial Proctor Caching Overview Managing.
CACI Proprietary Information | Date 1 PD² v4.2 Increment 2 SR13 and FPDS Engine v3.5 Database Upgrade Name: Semarria Rosemond Title: Systems Analyst, Lead.
1 Presented by: Val Pennell, Test Tool Manager Date: March 9, 2004 Software Testing Tools – Load Testing.
Tech Support Process By Catie Cotcher. Session Overview What to do if you have a Technical Issue What information should I check Errors Tips on calling.
Computer Maintenance Software Configuration: Evaluating Software Packages, Software Licensing, and Computer Protection through the Installation and Maintenance.
How to Upgrade to Lawson v10 By May 31, 2017
Application Maintenance Toolset (AMT) Applying Patches (CTPs)
Module 9: Preparing to Administer a Server
How to Setup and Utilize Functionality
TOPSpro Special Topics
Fundamentals of Information Systems, Sixth Edition
Description of Revision
Introduction of Week 3 Assignment Discussion
Computer Maintenance Software Configuration: Evaluating Software Packages, Software Licensing, and Computer Protection through the Installation and Maintenance.
Migrating your SQL Server Instance
System Review – The Forgotten Implementation Step
Systems Analysis and Design
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
m. Introduction QuickBooks File DoctorQuickBooks File Doctor (formerly known as Connection Diagnostic Tool) is the accounting software.
Systems Construction and Implementation
System Construction and Implementation
Systems Construction and Implementation
Module 9: Preparing to Administer a Server
DIY GP Maintenance Paul Johnson.
Software Reviews.
{Project Name} Organizational Chart, Roles and Responsibilities
iSecurity Password-Reset Training
Closing a Project Close a Project or Phase Close Procurements.
How to Upgrade to Lawson v10 By May 31, 2017
UpgradeX and CloudSuite
Application Maintenance Toolset (AMT) Applying Patches (CTPs)
Presentation transcript:

“All Lawson, All the Time!” Helvetica 24pt. bold 1/2/2019 Upgrade Planning “All Lawson, All the Time!” 1/2/2019

Why Upgrade? Decommission Timing of Upgrade 7.2.x Applications Helvetica 24pt. bold 1/2/2019 Why Upgrade? Decommission 7.2.x Applications 7.2.x SEA Applications Logan – Internet Object Services 7.3 7.3.3 Environment 7.2.x Applications and 7.3.x Environment off support Timing of Upgrade Customers wishing to upgrade at quarter-end or year-end Large backlog at year end is possible Multiple conversions required – waiting could cause bottleneck in available certified upgrade providers 1/2/2019

Product Release Requirements Helvetica 24pt. bold 1/2/2019 Product Release Requirements Applications 7.2.4 is the minimum application release required to move to 8.0.x 7.2.3 and earlier releases must first apply cyclicals to get to 7.2.4 7.2.4 & 7.2.5 can upgrade directly to 8.02 or 8.03 depending on Environment Environment 7.3.3_ESP8 or 8.01_ESP1 required to move to 8.02 8.01_ESP2 required to move to 8.03 Summary The upgrade process may require various system administration services (patches, cyclicals, other upgrades) Apps, Environments, Database, O/S 1/2/2019

Evaluate Upgrade Environment(s) Helvetica 24pt. bold 1/2/2019 Evaluate Upgrade Environment(s) Current Production Continued processing requirements Test Initial upgrade test Second upgrade test Final upgrade Training Changes in current process New functionality Sufficient HW capacity? Internal tech support? Production Server Prod & Test DB Server Test Server Tape Library 1/2/2019

Evaluate Upgrade Environment(s) - continued Helvetica 24pt. bold 1/2/2019 Evaluate Upgrade Environment(s) - continued Development Modification development Interface development Other Custom Development Other Upgrade Environments Operating System Database COBOL and C compilers, MSKTool Kit IOS, SEA, any other applications 1/2/2019

Upgrade Environment Usage – What it Looks Like Helvetica 24pt. bold 1/2/2019 Upgrade Environment Usage – What it Looks Like 1/2/2019

Helvetica 24pt. bold 1/2/2019 Analyze DB Changes 1/2/2019

Upgrade Project – The 16 Steps Helvetica 24pt. bold 1/2/2019 Upgrade Project – The 16 Steps Steps 1 – 4 (Technical) These Steps Involve Copying the Database to the New Upgrade Environment and Product Lines Step 5 (Functional) Run the Setup Programs Step 6 (Functional) Run Prejob Programs Steps 7 – 12 (Technical) Unload of 7.2x Data Load to the 8.x Data Structure 1/2/2019

Upgrade Project – The 16 Steps Helvetica 24pt. bold 1/2/2019 Upgrade Project – The 16 Steps Step 13 (Functional) Run Postjob Programs Step 14-15 (Technical) Backup and Verification of Record Counts Step 16 (Functional and Technical) Verify Upgrade Data 1/2/2019

Project Management Tools Operations Tools Helvetica 24pt. bold 1/2/2019 Upgrade Tools Project Management Tools Project Definitions: Roles Expectations Timeframes Budget Reporting Project Plan Issues List Project Management DB Operations Tools Upgrade procedures Document Modifications Script Documentation Upgrade Log End User Tools Data Considerations Upgrade Setup Decisions Procedure Documentation Testing Guidelines Security Setup Procedures Validation documentation 1/2/2019

Intellectual Property Library Helvetica 24pt. bold 1/2/2019 Intellectual Property Library Certified Interfaces Report Libraries Source Code Control Tools – ZZRC Testing Scripts 1/2/2019

Lessons Learned - Environment Helvetica 24pt. bold 1/2/2019 Lessons Learned - Environment MSP levels in sync in environments (patches also) Apply MSP #6 at a minimum MSP must be applied prior to upgrade being run (PR issues) Jobdefs can be copied from DEV80 to PROD80 Security changed enough that you need to review it in detail BEFORE you start the upgrade 1/2/2019

Lessons Learned - Application Helvetica 24pt. bold 1/2/2019 Lessons Learned - Application PR customers: review BSI closely-spend time to test/clean up employee address information Setting up locations: can use website www.zipinfo.com Attend training before/as part of the planning BR users: ATTEND TRAINING Look closely at 3rd party software and any upgrades needed Allow time for interface validation (especially if sending files to providers) Be sure to test EVERYTHING-Reports, forms output. Processes. 1/2/2019

Lessons Learned - Application Helvetica 24pt. bold 1/2/2019 Lessons Learned - Application AC users: Insert summary level before project start & rebuild structure Procurement Training – Major differences Matching Training – Major differences Comments – new attachment files HR – Location codes now used by BSI (HR04) Parallel Run recommended for PR users Set-up Invoice Handling Code (MA05) to default on AP Process level Review Procurement Codes – Multiple companies 1/2/2019

All data must be prepared before upgrade (data considerations) Helvetica 24pt. bold 1/2/2019 Lessons Learned - Data All data must be prepared before upgrade (data considerations) Allow time to clean up current data/purge/delete Test out small samples first, then move onto the larger files 1/2/2019

Lessons Learned – Project Planning Helvetica 24pt. bold 1/2/2019 Lessons Learned – Project Planning Modify process so that user involvement is eliminated during upgrade process Changes set up in spreadsheets (ex. Input into UG25) Review customization documentation - if incorrect, takes time to isolate and update documentation Resolution of error - identify the root of the problem/ upgrade or 8.0 issue? Testing is sooooooo important. Need scripts to do this (keep for future usage) Allow time to handle bug issues Internal Constraints: month-end/year-end, vacation, training 1/2/2019

Additional Considerations Helvetica 24pt. bold 1/2/2019 Additional Considerations Run DVP’s in Production ENV – Procurement or Distribution Users Upgrade Phases Preparation Upgrade Job Completion times Lead times Verify that each job has “Completed” without errors before running the next on-line program Check job logs and print file for messages 1/2/2019

Options: In-House, Remote or Never Again? Helvetica 24pt. bold 1/2/2019 Options: In-House, Remote or Never Again? Traditional – In House Do it yourself…use your own Technical & Functional experts Use an Upgrade Partner - experts with multiple upgrade experience Use your own customer supplied hardware Remote – Efficient Off-site Upgrade Copy Customer Configuration to netASPx Operations Center Upgrade within ASP on netASPx hardware Test over Secure VPN Connection Copy Upgraded Configuration to Customer location Application Service Provider Migrate to netASPx and free upgrades provided for life of agreement 1/2/2019

“All Lawson, All the Time!” Helvetica 24pt. bold 1/2/2019 Questions? Upgrade Planning “All Lawson, All the Time!” 1/2/2019