The Acorn Medical Practice, Wood Street, Mansfield

Slides:



Advertisements
Similar presentations
Lesson 9 Design & Construction of Food Premises & Equipment
Advertisements

Jim McElwain College Architect SETTING UP A LABORATORY.
Hazel Grove Car Park Proposals Overview Transport for Greater Manchester (TfGM) is developing plans to provide over 100 additional car parking spaces at.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.
Crest Interior Systems Crest Interior Systems PORTFOLIO Click mouse or press Space bar to Continue.
Technical boclair academy Building Drawings.
CDM 2015 Are we there yet? Michael Anderson Anderson Bradshaw Limited.
Graphic Communication
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Process Protocol Demonstrator Implementation of the Process Protocol at the Britannia Walk Development Stuart Carmichael Process Network 7 March 2002.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
WHAT I WANT TO BE WHEN IM OLDER! CAPENTER AND JOINER.
Name ________________ Unit 6/P6 – Traditional Construction Most common foundation = strip Damp Proof Course 150mm above ground level External Walls are.
SHE Code 28: Management of Radioactive Open Sources Safety, Health and Environment (SHE) Group.
CDM Construction Design and Management
Estimating and Scheduling CEE 492
Unit 6: Building Technology in Construction Learning Outcome Understand the implications of the issues and constraints on building construction Lesson.
Pecha Kucha Group 1. Design Concept Features? Features?External Cycle store to the right of the face of the buildings. Encased in timber cladding as will.
Minor Works & Plant Hire Meet the Buyer Event Tyrone 21st June 2017
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Why Know Building Construction
Curriculum for Excellence
Site Based Preconstruction - Demolition
Pedestals Existing and Future.
Construction (Design and Management) Regulations (CDM) 2015
Graduate Circle Housing Proposal for the Pennsylvania State University
Pre-Contract Cost Control
QMC Nottingham - Refurbishment works to Wards A23 & B50
14 High Leys Drive, Ravenshead, NG15 9HQ
20 Chestnut Drive, Mansfield
The Beehive House, Castledine Street, Loughborough
Building Construction I Sofia Sebastian 1
St Nicholas Church, Tuxford Nave, South & North Aisle Re-ordering
Field House, Car Colston
INDUSTRIAL / COMMERCIAL Facility For Lease
The Hollies, Ravenshead
STRUCTURAL TIMBER FRAMING
1 Semester Project Design A Multi Story Office Building
Building Drawings.
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Widmerpool House, Kinoulton Road, Widmerpool
Value of contract: Length of contract: Contract start date:
Westminster House, The Wells Road Centre, Nottingham
Value of contract: Length of contract: Contract start date:
White Post Farm, Farnsfield
14 Crow Hill Rise, Mansfield
No. 4 Wood Street, Mansfield
145 Main Street, Burton Joyce, Nottingham
Value of contract: Length of contract: Contract start date:
Hardwick Park Farm, Hardwick Estate, Norwood
Lindleys Mill, Prospect Place, Sutton In Ashfield
Construction Insurance
PKL INVESTMENTS LTD Value of contract: Length of contract:
Poswillow Suite, Children's Dental Unit
Ashfield District Council Disabled Facilities Adaptations
Field House, Car Colston
Coppice Ridge, Fiskerton, Newark
Eaton MEDC, Sutton-In-Ashfield
Value of contract: Length of contract: Contract start date:
On-Site Facilities for Pre-production deployment
The Paterson Redevelopment
Stoke Medical Centre RIBA Plan.
RIBA Plan Tom Robinson sir david Swindells Vii
Value of contract: Length of contract: Contract start date:
Presentation transcript:

The Acorn Medical Practice, Wood Street, Mansfield Value of contract: Length of contract: Contract start date: Completion date: £410,000 7 months February 2010 September 2010 Works/services provided: Bespoke ‘Sliding sash’ timber windows Site clearance and levelling Design & installation of Mechanical & Electrical services including CCTV, data, telecommunications In-situ concrete foundations, PCC Ground floor Staircase and First floor Masonry superstructure with Natural stone plinth, window cills and lintels Medical equipment and cabinetry to comply with HTM 63 Trussed and hipped timber roof with Man-made slate covering Commercial flooring & decoration Detailed description of contract: Administered under a JCT Minor Works contract with elements of Contractors design. A bespoke medical facility constructed close to Mansfield town centre on a brownfield site within a designated conservation area. The external building fabric was designed to fit sympathetically with the late 19th century appearance of the surrounding buildings. With disabled access to both storeys including four consulting suites, minor operations room, nurses room, patient waiting, offices, staff room, plant room & storage. Particular challenges to be overcome: Contact details: Clearing the site; which was derelict and subject to fly tipping for many years – Removal of contaminated waste including Japanese knotweed, hypodermics and hazardous chemicals Managing vehicular movements onto site from a busy ‘one way’ town centre road whilst protecting pedestrians Phasing of material deliveries and waste removal to maximise storage space on a very restricted site – building footprint covered approximately 70% of the total area Mr Richard Smallwood Smallwood Design The Elms, Manor View Caunton Newark. NG23 6AW Tel: 01636 636700