WBS: Lowest level OBS: Lowest level
Advertisements

Chapter 7 Project Management
Project Management CPM/PERT Professor Ahmadi.
Chapter 13 Project Scheduling: PERT/CPM
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Scheduling the Project
MEM 612 Project Management Chapter 5 Scheduling the Project.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
1 1 Slide © 2005 Thomson/South-Western Q 5 – 13 x 1 = the probability that Station A will take Sitcom Rerun x 2 = the probability that Station A will take.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times Project Scheduling with Known.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
In the name of Allah the Most Gracious the Most Merciful.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Scheduling Professor Stephen Lawrence Leeds School of Business University of Colorado Boulder, CO
© J. Christopher Beck Lecture 4: Project Planning 1.
Project Management Ross L. Fink. Definition of Project  A project is a specific, finite task to be accomplished.
Project Scheduling Professor Stephen Lawrence Graduate School of Business Administration University of Colorado Boulder, CO
Prepared by: Michael Palazzo
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Chapter 7 PERT Project Management for Business, Engineering, and Technology.
INDE 6332 ENGINEERING PROJECT MANAGEMENT SCHEDULING LECTURE 1 University of Houston Dept. of Industrial Engineering Houston, TX (713)
Project Scheduling Software
Change management control Sources of Change  Project scope changes  Implementation of contingency plans  Improvement changes ISE Ch. 6 1.
Project Management in Practice
MEM 612 Project Management Chapter 5 Scheduling the Project.
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
COB 300C - The Operations Dimension Project Management.
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
COB 300C Project Management Dr. Michael Busing. PERT ANALYSIS Optimistic-Likely-Pessimistic Project Times If you hold someone to a certain number, they.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
PROJECT MANAGEMENT.
Project Scheduling
The Project Schedule and Budget
deterministic Fixed and known in advance, representing a
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
Project Planning & Scheduling
Unit 4 Project Design, implementation and evaluation
Projects: Critical Paths
PROJECT MANAGEMENT WITH CPM/PERT.
Decision making and Organization Management
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Project Management: A Managerial Approach
مدیریت عمومی دانش کهن. مدیریت عمومی دانش کهن ارایه تحقیق پایان ترم 3 نمره امتحان پایان ترم 10 نمره ارایه تکالیف کلاس 2 نمره امتحانات.
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
Project Management Dr. Michael Busing
Uncertain activity duration (P14)
AOA A style of project network diagram in which arrows
Uncertain activity duration (P14)
PERT Program Evaluation and Review Technique
Critical Path Method By Matthew Gordon IST 402 – Professor Kochanov.
Scheduling.
Presentation transcript:

COB 300 - The Operations Dimension Project Management – Chapter 7

COB 300C - The Operations Dimension Project Management

Project Management What is project management? Why is project management important? we want to complete projects on time we want to complete projects within budget Project management has made great advancement over the past few years. This is mainly due to increased computing power.

Project Management History of Project Management PERT - Project Evaluation & Review Technique (Polaris Missile Development) CPM - Critical Path Method (Dupont Co.) Today we use the terms PERT and CPM interchangeably.

Project Management At one point, ALL government bids were required to be evaluated by PERT. Therefore, we saw a huge rush of people learning PERT. However, the people did not understand it and only “evaluated” the project itself and they forgot to conduct continuous evaluation. Result?

Project Management We still see shows like 60 Minutes and Prime Time Live where overcharges are taking place by contractors -- especially in the Department of Defense. It’s all about budgets and timing. For example, CISAT Campus. We will look at several problems to study project management. We will look at evaluation AND review.

Handout Problem Number 1 Immediate Predecessor Column Note that some things occur simultaneously, while others have tasks that must be completed beforehand. Time Estimates - CPM assumes that time estimates are constant (e.g., someone tells you that the time that design prototype will take is 12 weeks). This is fixed at 12 weeks. PERT, on the other hand, assumes some variance in that time (optimistic, likely, pessimistic)

Handout Problem Number 1 (cont’d) AOA - Activity on Arc Network AON - Activity on Network (preferred method) AON: