Robert Geller Missouri Department of Natural Resources

Slides:



Advertisements
Similar presentations
Overview of Environment Agency Decommissioning and Clean up programme – delivering Nuclear site restoration Peter Orr, decommissioning and clean up programme.
Advertisements

Former NAS Moffett Field
Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
By Chris Ford and James Hughes ( ) ( )
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
Northwest Region Cleanup Program Zidell Waterfront Property Cleanup 2012 Portland Scott Manzano | Oregon Department of Environmental Quality.
BoRit Superfund Site Timeline
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
PA One Cleanup and Land Use Controls The “Business of Brownfields” Conference April 17, 2008 Terri Smith Environmental Liability Management, Inc.
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
 Site Assessment and Mitigation Program Department of Environmental Health – County of San Diego.
CE 326 Principles of Environmental Engineering Prof. Tim Ellis February 4, 2008 Municipal Solid Wastes
DOE 2010 Long-Term Surveillance and Maintenance Conference November 17, 2010 Loren W. Setlow, CPG Office of Radiation and.
DEPUTY DESIGNATED FEDERAL OFFICIAL PRESENTATION JOEL BRADBURNE, PORTS SITE LEAD U.S. DEPARTMENT OF ENERGY Portsmouth Site Specific Advisory Board September.
1 Long-Term Stewardship of Uranium Mills in the United States – Regulatory Issues Keith McConnell, Deputy Director for Decommissioning and Uranium Recovery.
REGULATORY ACCEPTANCE OF POST-CLOSURE CARE INNOVATION Mr. Charles G. Johnson Colorado Department of Public Health and Environment Hazardous Material and.
2010 Long-Term Surveillance and Maintenance Conference Lessons Learned for Institutional Controls at the Weldon Spring Site.
Who’s Monitoring Land Use Controls on Brownfield Sites? Terri Smith Environmental Liability Management, Inc.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
McCoy Field Proposed Keith Middle School Site EPA Proposes Approval of McCoy Field Cleanup Plan.
Legacy Management Strategic Plan 2010 David Geiser Director, U.S. Department of Energy (DOE or Department) Office of Legacy Management (LM) November 2010.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
UNRESTRICTED / ILLIMITÉ LLRWMO’s Legacy Sites in Canada IAEA RSLS Elliot Lake Workshop Mark Gardiner 2014 May 2.
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
2010 Long-Term Surveillance and Maintenance Conference Institutional Controls Featuring the Pinellas Site Jack Craig U.S. Department of Energy Office of.
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
Weldon Spring Site: Past, Present, and Future
Maryland Department of the Environment Harbor Point – Regulatory Overview Horacio Tablada, Director Land Management Administration November 14, 2013.
1 BULGARIA PUBLIC- PRIVATE PARNERSHIP FOR REMEDIATION OF HISTORICAL POLLUTION Dr. Vania Grigorova Ministry of Environment and Water Bulgaria Managing for.
Nuclear Waste Storage in Utah!. Clive Storage Facility (Energy Solutions)  In 1990 Energy Solutions was permitted to treat and dispose of Class A low.
EM Budget--- Past/Present/Future Mark W. Frei U.S. Department of Energy October 14, 2005.
A Combined Solution for Sediment Remediation and Waterfront Development A Combined Solution for Sediment Remediation and Waterfront Development John T.
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
The Superfund ERA Process. What is Superfund? Superfund was created on December 11, 1980 when Congress enacted the Comprehensive Environmental Response,
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Regulatory Framework for Uranium Production Facilities in the U.S.
Nuclear Waste Disposal By: Tierra Simmons. Nuclear Waste Disposal Controversy Nuclear energy provides enough efficient sources of energy than all fossil.
Using an Environmental Management System for Managing DOE’s Legacy DOE Order Workshop 26 February, 2003.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
The Truth about Ecological Revitalization - Case Studies and Tools to Improve your Cleanups Tom Bloom, EPA Region 5 Community Involvement with Ecological.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
East Tennessee Technology Park Emergency Management Program (Vision 2020) Darryl Bonner UCOR Emergency Management October 15, 2015.
Resource Conservation and Recovery Act Draft Year: 1976 Amendment years: 1989 National/ Internatinal: National Law Sean Petersen, per:3.
The Resource Conservation and Recovery Act of 1976 and 1989 (RCRA) Alex Chenault Period 4.
February 26 – March 1, 2012 ♦ Phoenix, Arizona Session # 90 Long–Term Stewardship at DOE’s Hanford Site Abstract #12575 Authors & Affiliation : Rick Moren:
Office of Legacy Management Land Transfer and Reuse November 2006 Steven R. Schiesswohl Senior Realty Officer, Office of Legacy Management.
EPA P-1 Institutional Control Tracking EPA Superfund Perspective November 2006.
EPA Staying Flexible: Adaptive Management Approaches for Superfund Redevelopment An Enforcement Perspective Helena Healy Branch Chief Office of Site Remediation.
Mandatory Requirements of Ecological Solid Waste Management Act (RA 9003) on CLOSURE AND REHABILITATION OF DUMPSITES.
New Life for Landfills One Man’s Trash Another Man’s Treasure.
Long-Term Stewardship: Institutional Controls on Department of Energy Sites Steve Schiesswohl, Senior Realty Officer November 2006.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Long-Term Stewardship: Ensuring the Safe Use of Contaminated Sites Brownfields 2006 Boston, MA.
Low-Level Radioactive Waste Forum Spring 2016 Meeting – Park City, UT
THE SUPERFUND PROCESS Assessment and Listing
EPA Options for the Federal Regulation of Coal Combustion Waste Lisa Evans Earthjustice October 22, 2010.
South Carolina Perspective on Part 61 Proposed Revisions
Low-Level Radioactive Waste Forum
RESTORING CONTAMINATED SITES TO PRODUCTIVE USE
Presentation Outline Background Summary of City Actions
From Lab to Label: Innovations That Feed The World
Municipal Solid Wastes (continued)
Municipal Solid Wastes
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
U.S. Department of Energy Perspectives on Waste Classification
Presentation transcript:

Robert Geller Missouri Department of Natural Resources Long Term Stewardship - Department of Energy Weldon Spring Site Lessons Learned Robert Geller Missouri Department of Natural Resources

Keys to Successful Long Term Stewardship Shared vision for the future Complete Long Term Surveillance & Maintenance plan Defined roles for stakeholders Enforceable agreement Monitoring & modifications Developing a definition and a shared vision of LTS early in the planning process is critical. Providing the monitoring and maintenance of contamination or residual contamination is essential to confirming that any risk based decision remains appropriate and protective. If we can’t prove that our decisions are protective then the only few options we have remaining could direct us to clearly cleanup everything to unrestricted access levels. While this is a commendable goal we are often faced with decisions where we will have to shift our thinking to gain success. Conducting an effective and protective cleanup which allows some residual contamination to remain, with appropriate Long term Stewardship may be an appropriate balance. A robust Long Term Stewardship program is essential as a means to help us re-evalute our past decisions in an organized manner to ensure they remain protective. LTS must be considered in the remedy decision making process, LTS functions must assure ongoing protection of H,H & E. LTS must be sustainable over the life of the hazard that exists. New Science and technology must be reexamined on a regular basis to see if we can improve our decisions. There are many components of LTS I’d like to focus on three we feel are key to success.

Before (1960's) DOE's Weldon Spring After (2002) Example of a Federal Facility site that the section is working on: On October 23, 2001 the last piece of protective riprap (large rock) cover was placed on the 45-acre 75-foot high disposal cell at the Weldon Spring Site Remedial Action Project. This is a milestone in this fifteen-year cleanup that the Department of Energy (DOE)has been conducting. The disposal cell contains hazardous and contaminated waste materials left over from the World War II explosives manufacturing plant and later uranium processing facility. Approximately 1.48 million cubic yards of waste have been entombed in the disposal cell. Once the waste was placed in the cell it was covered with a radon barrier, which is one of several components that comprise the cell cap. The final layers of the cap are composed of geosynthetic and clay liners, gravel, sand, soil, and finally large rocks or riprap. Today, all of the site remediation and engineering controls are in place. The department is working with the EPA and DOE to finalize a Federal Facility Agreement. Also, DOE needs to implement the institutional controls necessary to ensure the final remedy remains protective.

Ancient burial ground or radioactive disposal cell?

DOE's Weldon Spring After (2003) Maybe? The St. Louis Post Dispatch editorial cartoon is one perspective. DOE's Weldon Spring

Do you know what this means?

Failure to fully and adequately address these issues at this time would be irresponsible of us Questions ?

Where do we go from here?

Tom Winston Ohio Environmental Protection Agency Long Term Stewardship - Department of Energy Mound and Fernald Sites Lessons Learned Tom Winston Ohio Environmental Protection Agency

Questions