Requirements Working Group

Slides:



Advertisements
Similar presentations
© 2007 BigVisible Solutions, Inc. All Rights Reserved Coaching Solutions Agile Project Start v
Advertisements

Slide 1 Risk Management Working Group R WG The Risk Management Working Group What it Does & What You Can Do.
Requirements Working Group Overview June 24-25, 2007 San Diego, CA.
The Framework Document Version 1: Guidelines for the 10-Year Implementation Plan Overview for GEO-3 February 2004 Helen M. Wood Secretariat Director.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
International Standards for Software & Systems Documentation Ralph E. Robinson R 2 Innovations.
The Open Group Architecture Framework (TOGAF) Version 7.
Metadata Working Group Charter Revision Jennifer Carlino FGDC OS January 15, 2013 Coordination Group Meeting.
1 of 6 Parts of Your Notebook Below is a graphic overview of the different parts of a OneNote 2007 notebook. Microsoft ® OneNote ® 2007 notebooks are digital.
HTML Comprehensive Concepts and Techniques Intro Project Introduction to HTML.
1 International Workshop 26 – 29 Jan 2013 Jacksonville, FL USA COMPETENCY WORKING GROUP Chairs / Co-Chairs: Eileen Arnold / Mimi Heisey / Don Gelosh INCOSE.
1 Session Number Presentation_ID © 2001, Cisco Systems, Inc. All rights reserved. Using the Cisco TAC Website for IP Routing Issues Cisco TAC Web Seminar.
SC Websites Training of webmasters end of March/ beginning of April Validation of content in April Launching in May/ June (at the end of March, the hosting.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
1Copyright © 2013, Printer Working Group. All rights reserved. Semantic Model Working Group Agenda February 6, 2013 El Segundo, CA PWG F2F Meeting Daniel.
Ohio Technology Standards August 9, 2005 Why Standards in Technology? No Child Left Behind Technology Literacy requirement Computer and Multimedia Literacy.
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group December, 2012 Irvine, CA PWG F2F.
International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA Model-based Systems Engineering (MBSE) Initiative Slides by Henson Graves Presented by Matthew.
INCOSE Systems of Systems Working Group Alan Harding BAE Systems Dr. Judith Dahmann MITRE Corporation SoS Working Group Co-chairs.
Blackboard Learn 9.1 © 2010 Blackboard Inc. All rights reserved. Advanced Communication.
OMB Circular A-16 Supplemental Guidance (Endorsed) Ivan DeLoatch, Staff Director Lew Sanford Jr. & Wendy Blake-Coleman NGAC Meeting, February 4, 2009.
1 © 2006 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Using the Cisco Technical Support & Documentation Website for IP Routing.
Chairs/co-chairs: David Kaslow / Graham Edwards INCOSE Web page: Number of Members: Approx 160 Number.
ELECTRONIC SERVICES & TOOLS Strategic Plan
Blackboard Learn 9.1 © 2013 Blackboard Inc. All rights reserved. Advanced Communication.
Ontology in MBSE How ontologies fit into MBSE The benefits and challenges.
9 th International Common Criteria Conference Report to IEEE P2600 WG Brian Smithson Ricoh Americas Corporation 10/24/2008.
Systems Engineering Concept Model (SECM) Status 03/17/2016 John Watson.
International Workshop 28 Jan – 2 Feb 2011 Phoenix, AZ, USA Modeling Standards Activity Team Model-based Systems Engineering (MBSE) Initiative Roger Burkhart.
International MBSE Workshop, LA,US Jan 25-26, 2014.
Model-based Conceptual Design (MBCD) Model-based Conceptual Design (MBCD) Working Group Introduction Quoc Do, PhD Research Lead, DSIC, UniSA Co-chair,
International Workshop 26 Jan – 29 Jan 2013 Jacksonville, FL, USA MBSE Workshop INCOSE IW 2013 MBSE Workshop January 26-27, 2013 Introduction MBSE Chairs.
HTML PROJECT #1 Project 1 Introduction to HTML. HTML Project 1: Introduction to HTML 2 Project Objectives 1.Describe the Internet and its associated key.
Model-based Systems Engineering (MBSE) Initiative Overview Sanford Friedenthal Mark Sampson.
Agile Systems and Systems Engineering (AS&SE) Working Group
SysML v2 RFP WG Meeting Introduction
Systems Engineering Concept Model (SECM) Update
Systems Engineering Concept Model (SECM) Update
Quad Charts for: TIMLM WG.
Project 1 Introduction to HTML.
Interact 2: Communicating
INCOSE IS 2013 MBSE Track June 23-27, 2013
Community Session - Next-Generation gTLD Registration Directory Service (RDS) to replace WHOIS
John C. Watson Principal Member of Engineering Staff
Project 1 Introduction to HTML.
Chris Paredis Georgia Tech
Lee McCluskey University of Huddersfield
Decision Analysis Working Group
INCOSE IW 2014 MBSE Workshop January 25-26, 2014
Chapter Leader Training Unit 2 - Certification - Technical Operations
System Engineering Concept Model – Domain 8/5/2015 Status
MLM A-Team What? The Model Lifecycle Management Activity Team
Systems Engineering Workflow Use Cases Activity SysML Roadmap Activity
Committee on Earth Observation Satellites
Ways of Working and Tools Measures
INCOSE IW11 MBSE Workshop
HL7/College/University Internship Program
System Engineering Concept Model – Domain 9/24/2015 Status
ADEA and the Council of Students: Who We Are and What We Do
9th International Common Criteria Conference Report to IEEE P2600 WG
Ray Hentzschel Standardising International SE Certification (ISO/IEC 24773) on the INCOSE SE Competency Framework.
PRESENTS How vTools.Meetings integrates with myIEEE.
Tool Integration and Model Lifecycle Management Working Group
INCOSE IW 2014 Town Hall January 27, 2014
Objectives and expectations from the AiP WG Tashkent, October 2017
Systems Engineering Concept Model (SECM) Update
INCOSE Digital Artifacts Challenge Team
Systems Engineering Workflow Use Cases Activity SysML Roadmap Activity
DRAFT ISO 10013:20XX Overview Quality management – Guidelines for quality management system documented information ISO/TC176 TG 01.
Presentation transcript:

Requirements Working Group

INCOSE Connect address WORKING GROUP NAME Chair: Lou Wheatcraft, USA Co-Chair:  Mike Ryan, Australia Co-Chair: Jeremy Dick, UK Co-Chair: Kathy Baska, USA Co-Chair: Rick Zinni, USA Co-Chair: Jason Baker, USA Chairs /co-chairs INCOSE Connect address https://connect.incose.org/WorkingGroups/Requirements/Pages/Home.aspx Number of Members INCOSE Web page https://www.incose.org/ChaptersGroups/WorkingGroups/process/requirements 392 (446) IW Participants Other Web page 87 January 2, 2019 www.incose.org/IW2018

Charter Purpose Goal Scope 1 The purpose of the Requirements Working Group (RWG) is to advance the practices, education and theory of requirements development and management and the relationship of requirements to other systems engineering functions. 2 Goal Expand and promote the body of knowledge of requirements and its benefits within the systems engineering community 3 Scope Activities relating to best practices for requirements development and management throughout the product lifecycle including: Elicitation Analysis Allocation Traceability Elaboration Management Change Management Expression Verification Validation January 2, 2019 www.incose.org/IW2018

Published Products Guide for Writing Requirements – 2017 version Guide for Writing Requirements Summary – 2017 version Web tutorials to support Guide for Writing Requirements (need to be updated to reflect 2017 Guide) January 2, 2019 www.incose.org/IW2018

2018 IW Outcomes (1) Provided an overview to the Guide for Writing Requirements for new members Provided an overview of the draft document Integrated Data as a Foundation of SE. Participated in joint WG sessions: Tool Integrations, Oil & Gas WG, Ontology Discussion on effective requirement communication (MBSE related) Discussion concerning issues with integrating requirement development & management with modeling activities. (MBSE related) Discussion to mature the concept of information-based approach to Requirement Development & Management (RDM) (MBSE related) January 2, 2019 www.incose.org/IW2018

2018 IW Outcomes (2) Presentations from several tool vendors on capabilities to develop & manage rqmts Presentation on knowledge management application to modeling case study Presentation on the work being done to translate the Guide into Russian Matured the content of an draft extension to the Guide for Writing Requirements to illustrate the process of developing a set of system requirements using a coffee maker case study Ask the Experts – set aside time to address issues/questions that RWG session attendees have concerning requirements development and management Support WG MarketPlace All IW presentations and associated presentations are available on the RWG Connect web site: Click on the “IW2018” link on the left Then select “documents” https://connect.incose.org/WorkingGroups/Requirements/Pages/Home.aspx January 2, 2019 www.incose.org/IW2018

Planned Work Maintain Guide for Writing Requirements Baseline document: Integrated Data as a Foundation of SE Update current webinar-based training for the Guide for WR with new on- demand training Active participation in IS 2018 Continue work on the Supplement to the Guide for Writing Requirements with a case study: coffee machine Populate the Requirements section of the MBSE wiki Begin development of Guide for Managing Requirements Support efforts to update the SE tool data base Maintain the RWG public and Connect web sites January 2, 2019 www.incose.org/IW2018