Machine Studies/Software Update

Slides:



Advertisements
Similar presentations
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg Short Bunches at FLASH.
Advertisements

Update on ILC ML Lattice Design Alexander Valishev, for the FNAL LET group FNAL AP Dept. Meeting March 7, 2007.
Emittance dilution due to misalignment of quads and cavities of ILC main linac revised K.Kubo For beam energy 250 GeV,
Emittance dilution due to misalignment of quads and cavities of ILC main linac K.Kubo For beam energy 250 GeV, TESLA-type optics for 24MV/m.
MERLIN 3.0 only considers first order (dipole) modes. Kick is linearly proportional to offset. For offsets close to the axis this is a reasonable approximation.
Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory New High-Level Applications for 2009 Henrik.
Space Charge meeting – CERN – 09/10/2014
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
CMS UPGRADE CAPILLARY TUBE PROFILING. CAPILLARY TUBES EVALUATION Radiation damage Transmission Mixing Scintillating Quartz Tube Water/ Air EJ309 Fiber.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Update on ILC ML Lattice Design Alexander Valishev, for the FNAL LET group FNAL AP Dept. Meeting March 7, 2007.
Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.
CLIC programme at FACET Update on CERN-BBA A. Latina, J. Pfingstner, G. De Michele, D. Schulte (CERN) E. Adli (Univ. of Oslo), J. Resta Lopez (IFIC) In.
27-Nov-2007 SLAC-ILC- AP Meeting Global Design Effort 1 Lucretia Developments PT SLAC.
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
S. Spampinati, J.Wu, T.Raubenhaimer Future light source March, 2012 Simulations for the HXRSS experiment with the 40 pC beam.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
1 Henrik Loos 1 13 Sep 2011 APE Meeting Recent Activities H. Loos 09/13/2011.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
ParameterL-bandS-bandX-band Length (m) Aperture 2a (mm) Gradient (Unloaded/Loaded) (MV/m)17/1328/2250/40 Power/structure (MW) Beam.
Work-packages CLIC for the Drive Beam BJ, 23 feb 2010 Beam Dyn Meeting 2/23/11Beam Dyn meeting1.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
T. Limberg Position of the 3rd Harmonic System. Injector (with first Bunch Compression Stage) 2 European XFEL MAC May 2010 T. Limberg.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
Tools in CTF3 Simona Bettoni for the CTF3 operation team.
Franz-Josef Decker 14-Dec-2011 CSR is a big deal limiting performance Tolerance studies beforehand helped a lot Tor’s List Software adaptability helped.
ILC Main Linac Beam Dynamics Review K. Kubo.
LCLS MD Downtime William Colocho June 2014 to June 2016.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
LCLS Commissioning & Operations High Level Software
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
J. Alexander + Cornell accelerator group Cornell University
Status and Interest of the X-ray FEL SINAP
Summary of WG2 :CFS for staging
Have a chance to operate your own beam at CERN
LCLS-II Lattice 26FEB16: updates in the areas from bypass to dump
Beam-Based Feedback in LCLS-II
Update of CLIC accelerating structure design
LCLS Commissioning & Operations High Level Software
Maintain a single control room for all accelerator programs
What am I working on… H. Loos 08/02/2010.
Overview of Alignment Engineering Group Downtime Activities
Monday Morning – recovery from cryo.
Beam-Based Alignment Results
Recent Activities H. Loos 02/15/2011.
OSC simulation update Suntao Wang 10/06/2017.
APE Update Nate Lipkowitz 9/13/2011.
OCELOT orbit correction and optimizer
Two-bunch self-seeding for narrow-bandwidth hard x-ray FELs
Linac/BC1 Commissioning P
High Level Physics Applications for LCLS Commissioning
Laser Heater Integration into XFEL. Update.
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
LCLS Longitudinal Feedback System and Bunch Length Monitor Juhao Wu Stanford Linear Accelerator Center LCLS DOE Review, February 08, 2006 LCLS longitudinal.
Coupler Effects in High Energy Part of XFEL Linac
Evgenij Kot XFEL beam dynamics meeting,
Linear beam dynamics simulations for XFEL beam distribution system
LCLS Control System Personnel Linac & BC2 Controls progress
Main Linac Beam Optics and Tolerances
CLEAR’s Inductive Beam Position Monitors
Presentation transcript:

Machine Studies/Software Update H. Loos 11/16/2010

Work on Linac Upgrade (LU) issues Activities Klystron Kick Measurement and analysis in L3 finished Work on Linac Upgrade (LU) issues Oracle/XAL klystron name change Matlab software change Maintenance of Matlab software Other projects A-line profile monitor improvements Facet bunch length monitor THz experiment in undulator hall New BSY optics

Klystron Kick Measurement 25-30 X Y Offset values for sector 25 seem large

New BSY Optics Optics by R. Iverson Option to select new BSY optics Design New Optics Optics by R. Iverson Option to select new BSY optics

Test implementation of klystron kick correction for energy change This weeks MD studies Measure L3 wake field loss vs. bunch length (effect on matching later study) Test implementation of klystron kick correction for energy change Test static field correction in BSY/LTU