Passitivation Location

Slides:



Advertisements
Similar presentations
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Advertisements

Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 Research on Erratic Dark Currents in pCVD Diamonds Diamonds are Forever Adam Edwards, Stanford University M. Bruinsma (UC Irvine), P. Burchat (Stanford),
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Status of the Tracker Outer Barrel J. Incandela University of California Santa Barbara for the TOB Group Tracker General Meeting December 7, 2005 Slides.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
VLSI Digital System Design
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
– EUDET module – Report from Mechanics Brainstorming Marc Anduze – 30/06/2009 Laboratoire Leprince Ringuet Ecole polytechnique - Palaiseau.
MRDA Wiring diagram S-BUS Module ID setting button ballast L N DC0-10V dimming voltage Control DC Maximum current :100mA 6 relay switch 16A 6 channel.
The reading is 7.38 mm. The reading is 7.72 mm.
Available detectors in Liverpool
SuperB SVT Silicon Sensor Requirements
Design and fabrication of Endcap prototype sensors (petalet)
On behalf of the US TOB testing group
Update of US Testing Status
US Module Production Status
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
Unexpected Failures of Modules on Rods
US Module Production Quality
Vienna Module Production
Module Failures on RODs
Module Failures on RODs
Discoloration of Passitivation
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
HCAL HV splice box.
What we learned today Made test bonds on Al plate using bonding parameters of channel and bias bonds Inspected 10 bonds of each type None of them showed.
Damage under UCSB bias bonds
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Noise in TOB modules and sensor quality
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
UCSB Qualification Module Grading
Hybrid Status/Deliveries
Sensor probing (Summary)
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
Modules Produced With Low Rint Sensors
FNAL Hybrid Testing Status
Noise in TOB modules and sensor quality
Production Status 39 modules produced
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Is Increased Bias Current and CMN Correlated?
Isolated Bad-CAC Strip at UCSB
Hybrid & Module Testing Status
Recent TOB Developments
Hybrid & Module Testing Status
Recent TOB Developments
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
Equipment Status ARCS equipment status DAQ equipment status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Updates on the Silicon Tracker 2S Module
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
FNAL Hybrid Testing Status
Università di Catania and INFN – Sezione di Catania
FNAL Hybrid Testing Status
Presentation transcript:

Passitivation Location Location of areas without passitivation darker

UCSB Old TOB Signal Bond Damage Looked for damage on the signal bonds We found on all signal bonds the area near the very end of the wire was pocked It is at the same location of the discoloration of the passitivation seen on channels Approx. 70-210 mm from the wire bond feet

Old TEC Ring 5 Modules Built at UCSB Good News Bonds Higher ~150 mm Bias, ~350 Signal Less Damage Seen Bad News Discoloration seen of passitivation of DC pads, bias ring, and guard ring on bias and signal bonds DC Pads Guard Ring DC Pads Bias Ring Bias Ring

Old TEC Ring 7 Modules Built at UCSB Good News Bonds Higher ~150 mm Bias, ~350 Signal Less Damage Seen Bad News Discoloration seen of passitivation of DC pads, bias ring, and guard ring on bias and signal bonds Metal line deposited under bias bonds between bias and guard rings DC Pads Guard Ring DC Pads Bias Ring Bias Ring

UCSB Modules with New Bond Heights Bonding clearance over inside n+ metal edge increased for all module types R5- ~350 mm bias bonds and ~520 mm signal bonds R7- ~425 mm bias bonds and ~525 mm signal bonds TOB- ~450 mm bias bonds and ~550 mm signal bonds No visible damage seen under bias and channel bonds Plan on running modules for extended periods under voltage in the Vienna box