First Stage Cryogenic IF Amplifier

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)1 First Stage Cryogenic IF Amplifier Carmen Diez.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
1. Common Optics Assembly (COA) Main optics housing riveted on channel housing (with rod) QM delivered
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
Development of the IF2 Chain for the FPU of the HIFI Instrument Alexander Megej July 1 st, 2003, Groningen.
HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.
IF1 CDR 9/12/031 Centro Astronómico de Yebes, Obs. Astronómico Nacional, IGN (Spain) IF-1 high (4-8 GHz) design and DM results Carmen Diez, Isaac López-Fernández,
Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 11/02/04MADRID1 Cryogenic Amplifiers for the Band 7 and Band 9 Cartridges Juan Daniel.
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
Astronomical Telescopes and Instrumentation (SPIE) 8/28/021 Centro Astronómico de Yebes, Obs. Astronómico Nacional, IGN (Spain) Wide band, ultra low noise.
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
Observatorio Astronómico Nacional Instituto Geográfico Nacional ALMA CAY 05/03/2003IGN (Madrid)1 Development of IF Amplifiers for ALMA Isaac López-Fernández.
Fluctuations and Noise (SPIE) 5/28/041 Centro Astronómico de Yebes, Obs. Astronómico Nacional, IGN (Spain) Experimental results of gain fluctuations and.
THEMIS SCM CDR MC VASSAL - 3D PLUS CETP 04/08/ Preamplifiers in 3D Technology EM manufacturing Part list and component Lot Acceptance Tests FM manufacturing.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
5th Engineering Forum Workshop (Cagliari 13/05/ 11)1 Centro Astronómico de Yebes, Obs. Astronómico Nacional, IGN (Spain) Gain Fluctuations of Cryogenic.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
Groningen, 1-2 February 2001 FPU Preliminary Design Review1 First Stage Cryogenic IF Amplifier Centro Astronómico de Yebes Observatorio Astronómico Nacional.
Leiden, 3 June 2002Consortium Meeting1 First Stage Cryogenic Amplifier IF1 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
3-Stage Low Noise Amplifier Design at 12Ghz
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
TRD Electronics Flight Production Wim de Boer, Kai Gassmann, Florian Hauler, Andreas Sabellek, Mike Schmanau IEKP - Universität Karlsruhe (TH)
FIELDS Fabrication Review Board FRB SearchCoil Magnetometer SENSOR S/N 4 Ferrite cores cracks P. LEROY 1MMS SCM FRB, 20 APR 2012.
Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 24/02/2003SRON (Groningen)1 Development of IF Amplifiers for ALMA Isaac López-Fernández.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
Dr Danielle Kettle1 LNA progress 4 th SKADS Workshop, Lisbon, 2-3 October 2008 LNA progress.
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
Microfabrication Home exercise #3 Return by Feb 21st, 22 o’clock
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
Florian Buchsteiner (HEPHY Vienna)
WP High Beta Cavities Delivery
Action Items List at PM#7
Bill Raynor Naval Research Lab
Oleksiy Dolinskyy December 1st, 2014
Introductions and aims of today’s briefing
SPF MAG Quarterly Report – Feb 2015
MICE VLPC Cryo Update Alan Bross MICE CM18 June 13, 2007.
Campus Master Plan.
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Simplification of Lighting and Light-Signalling Regulations
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
0.0 Instrument Suite Name Presenter’s name
2K CB FDR Overview:  Agenda, Charge, Review Process
Peer Review Agenda (Suggested).
MAIN 220 Equipment Installation
GLAST Large Area Telescope
X-ray Pump-Probe Instrument
LSST Camera Detector Status
First Stage Cryogenic IF Amplifier
Update on “Channel Models for 60 GHz WLAN Systems” Document
Daresbury ESS In-Kind Contributions
Release 3 Scope & Proposed Plan
LCLS-II Cryoplant Controls Workshop.
Overview of the recommendations on software updates
FCC Spectrum Management Topics
Low-Noise Wide-Band Cooled amplifiers with InP Transistors
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

First Stage Cryogenic IF Amplifier Prepared by: Carmen Diez HIFI Consortium Meeting UTRECHT 19/04/04

HIFI Consortium Meeting UTRECHT OUTLINE QM Program (Alcatel) Amplifiers IF1 High (4-8 GHz) IF1 Low (2.4-4.8 GHz) Isolators Qualification Boards FM Program (Alcatel) CDR Status/Management Meeting Programmatic/financial concerns Planning Open Issues & Summary HIFI Consortium Meeting UTRECHT 19/04/04

QM PROGRAM: Amplifiers: IF1 High (I) 2 units delivered December 2003 (EQM2 & EQM4) 2 units being qualified (EQM1 & EQM3) Baseline tests done HIFI Consortium Meeting UTRECHT 19/04/04

QM PROGRAM: Amplifiers: IF1 High (II) HIFI Consortium Meeting UTRECHT 19/04/04

QM PROGRAM: Amplifiers: IF1 High (III) HIFI Consortium Meeting UTRECHT 19/04/04

IF1 High (QM2): Gain & Noise HIFI Consortium Meeting UTRECHT 19/04/04

IF1 High (QM2): S Parameters S22 < -15dB → Goal HIFI Consortium Meeting UTRECHT 19/04/04

IF1 High (QM4): Gain & Noise HIFI Consortium Meeting UTRECHT 19/04/04

IF1 High (QM4): S Parameters S22 < -12dB → Baseline HIFI Consortium Meeting UTRECHT 19/04/04

IF1 High QM: Gain Stability HIFI Consortium Meeting UTRECHT 19/04/04

QM PROGRAM: Amplifiers: IF1 Low Structures and Substrates being fabricated HIFI Consortium Meeting UTRECHT 19/04/04

QM PROGRAM: Isolators: Measurements 4 isolators measured HIFI Consortium Meeting UTRECHT 19/04/04

QM PROGRAM: Isolators: Results HIFI Consortium Meeting UTRECHT 19/04/04

QM PROGRAM: Qualification Boards Qualification boards done and qualified Resistors, Capacitors and Transistors glued Resistors and Capacitors soldered Capacitors glued HIFI Consortium Meeting UTRECHT 19/04/04

HIFI Consortium Meeting UTRECHT FM PROGRAM IF1 High Structures being fabricated (problems with type of aluminium) Substrates being fabricated IF1 Low Structures and Substrates to be fabricated once the QM units are tested Isolators To be received and measured (18 units Yebes+18 units SRON) HIFI Consortium Meeting UTRECHT 19/04/04

CDR Status/Management Meeting (I) CDR held on the 9th of December 2003 Management Meeting held on the 18th of February 2004 Actions from CDR: # Action Who When Status Remark AI-1 CAY to change cryo cycle number in IF-1 specifications to 30 (Sec. 5.4.2.1) CAY 31 Jan 04 Done AI-2 SRON and CAY to sign IF-1 specifications CAY / SRON Pending SRON action needed AI-3 Alcatel to provide a manufacturing flow with enough detail to see the exact sequence of manufacturing steps including all inspection points AEO AI-4 Alcatel to include the JPL recommended HEMT device burn-in in the manufacturing flow and to update the PID accordingly SRON to answer the Yebes proposal AI-5 CAY to check availability and delivery dates for IF-1 low components, and to inform Alcatel AI-6 Alcatel to demonstrate compliance of bonding connections HIFI Consortium Meeting UTRECHT 19/04/04

CDR Status/Management Meeting (II) # Action Who When Status Remark AI-8 Alcatel to demonstrate component mounting with air-free Epotek AEO 31 Jan 04 Done AI-9 Alcatel to demonstrate mounting with air-free Ablefilm AI-10 Alcatel to update the document “Thermal cycling test procedure” (doc. ref. 30007009/931). AI-11 CAY / Alcatel to provide a Design Verification Matrix to SRON. CAY / AEO AI-12 Alcatel to include the schedule in the CDR documentation (with corresponding doc. nr.). AI-13 The HIFI Signal Chain Manager to contact Alcatel and ask for a management meeting to discuss resources and planning at Alcatel. HIFI SCM AI-14 SRON to provide info on bake out to CAY SRON 15 Feb 04 AI-15 AEO to check availability of Helicoils 06 Feb HIFI Consortium Meeting UTRECHT 19/04/04

Programmatic/financial concerns 2 Contracts signed: 2 QMs (Qual) (4-8 GHz) 2 QMs (Accep) (4-8 GHz) 7 FMs (4-8 GHz) 2 QMs (2.4-4.8 GHz) 4 FMs (2.4-4.8 GHz) 3 FMs (4-8 GHz) 1 Contract to be signed: 5 FSs (4-8 GHz) 2 FSs (2.4-4.8 GHz) HIFI Consortium Meeting UTRECHT 19/04/04

HIFI Consortium Meeting UTRECHT CRYO IF1 (4-8 GHz) AMPLIFIER-HIFI PLANNING (I) HIFI Consortium Meeting UTRECHT 19/04/04

HIFI Consortium Meeting UTRECHT CRYO IF1 (4-8 GHz) AMPLIFIER-HIFI PLANNING (II) HIFI Consortium Meeting UTRECHT 19/04/04

HIFI Consortium Meeting UTRECHT CRYO IF1 (4-8 GHz) AMPLIFIER-HIFI PLANNING (III) Important delivery dates: QM1 low: 19 May 2004 QM2 low: 21 May 2004 FM1 low: 14 July 2004 FM4 low: 21 July 2004 FM1 high: 7 May 2004 FM10 high: 16 June 2004 HIFI Consortium Meeting UTRECHT 19/04/04

HIFI Consortium Meeting UTRECHT OPEN ISSUES & SUMMARY 2 QM IF1 high units delivered December 2003 (EQM2 & EQM4) 2 QM IF1 high units being qualified (EQM1 & EQM3) QM IF1 low: Structures and Substrates being fabricated 4 QM isolators measured Qualification boards done and qualified FM IF1 High: Structures being fabricated (problems with type of aluminium) Substrates being fabricated FM IF1 Low: Structures and Substrates to be fabricated once the QM units are tested Uncertainties about the performance of the IF1 low fabricated by Alcatel Alcatel delays very difficult to recover HIFI Consortium Meeting UTRECHT 19/04/04

HIFI Consortium Meeting UTRECHT 19/04/04

QM & FM PROGRAMS (First Prototype) HIFI Consortium Meeting UTRECHT 19/04/04

QM & FM PROGRAMS (First Prototype) HIFI Consortium Meeting UTRECHT 19/04/04

HIFI Consortium Meeting UTRECHT Industry: TTI Bonding machine Experience in cryostats Complete receiver with S/X cryogenic amplifiers delivered to Finland 8.4 K @ 8.4 GHz with Fujitsu devices (20  h k) HIFI Consortium Meeting UTRECHT 19/04/04

Microwave Capacitors at Cryogenic Temperature HIFI Consortium Meeting UTRECHT 19/04/04

HIFI Consortium Meeting UTRECHT TRW T-42 CRYO3 200×0.1 μm gate Best performance TRW T-45 CRYO4 Used in DMs Space qualifiable, to be used in FMs CHOP developed ETH T-35 200×0.2 μm gate Experimental transistor Design by request Used in MPAs 0.19 mm Transistors 0.22 mm HIFI Consortium Meeting UTRECHT 19/04/04