MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Longitudinal beam parameters and stability
Saturday 21st April 00:33 Interlock during ramp on BLM HV
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Summary of week 7 Hardware Commissioning:
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
MD#4 Summary MD Coordinators: Giulia Papotti, Frank Zimmermann
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Monday 18 October : Collimation system
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Summary of Week 16 G. Arduini, J. Wenninger
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Wed :40 Lost S78 - QPS controller.
Friday March 4th 08h32: Access for beam dump system.
Tuesday 20 March 2012.
Week 35 – Technical Stop and Restart
Friday 14th December - morning
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday February 28th 8h00: Injection
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Saturday 7th May Sat – Sun night
LHC Morning Meeting - G. Arduini
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Beam dynamics requirements after LS2
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
MD Planning Fri – Sat (1. – 2.7.)
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Thursday Morning/Afternoon
Monday 152 bunch operation summary
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann Machine Coordinators: Gianluigi Arduini, Eva Barbara Holzer 27 November 2012

MD#4 News & Plan Mon – Tue (26. – 27.11.) Day Time v MP class MP Comments Mon 06:00 Ramp down if needed 08:00 450 GeV: IR8 aperture A 450 GeV Pilote bunches(1e10p/bunch) to measure aperture. 10:00 450 GeV: Beam instrumentation B BSRT vs WS, Schottky, WS PM saturation (partially done in MD3): B1: Pilot + 12b >=1.1e11p/bunch B2: Pilot + 50ns trains from 6 to 72 bunches Bumps at 450GeV and 4TeV Blow up with ADT 2) BGI, Gates BBQ, BSRT temperatures: 450GeV 50ns trains with minimum 600 bunches Bumps in B2 +- 3mm Gating with ADT off on some bunches 3) BPMs: Done in MD3 4) Matching: Probe from 1 to 5e10p Inj, circulate (~100 turns) and dump (More details see slides ) 16:00 450 GeV 4 TeV: p-Pb test C From MD2 preparation: 450GeV and 4TeV Bunches of ~1.5e10p/bunch and >5e7Pb/bunch B2: few proton bunches and few Pb bunches B1: > 300 bunches with 10% ~1.5e10p/bunch, later with higher intensities. Test RF re-phasing procedure. Squeeze sequence and collisions. (More details see slides) cancelled (QPS access S6-7 RQF/RQD, MKI2 fault in softstart, dump line vacuum); to be rescheduled as Operational Dev. BPM studies and beam excitation, … 24 p batches from the SPS posed problems

MD#4 New & Plan Mon – Tue (26. – 27.11.) Day Time v MP class MP Comments Tue 00:00 Ramp down 02:00 450 GeV 4 TeV: MQY transfer function A 4 TeV. Pilote bunches (1-3e10p/bunch). Standard optics measurements with different MQY transfer funtions. 06:00 08:00 450 GeV: RF study (longit. stability for batch or RF voltage modulation) B 450GeV A few nominal batches of 144b. RF Voltage modulation: fill half of the ring, to test the corrected algorithm of voltage set point adjustment Longitudinal stability: Full ring with max. bunch intensity. Excite a single mode in the beam with decreasing gain in the feedback loop. (More details see slides) 16:00 450 GeV: beam-beam (noise or impedance) C 450 GeV In total 9 bunches per beam with different intensities (from 1e11 to 2e11), zero crossing angle in IP1, IP2 and IP5. Nominal crossing angle in IP8. Collision tune, Damper (ADT) off Introduce increasing noise with ADT Increase ADT gain in steps Scan separation in IP1 and 5 with 4 bunches (from 1e11 to 2e11) with damper of. 22:00 450 GeV 4 TeV: Collimation impedance & follow up from last MD 4 TeV ~3b (1.3e11p/bunch) below SBF Alignment of collimators Impedance studies with tight collimator settings and moving IR7 collimators back and forth. successful! in progress

BI MD – new filling scheme for BLM MD BI_MD_cross_calibration_8 14-09-2012 Outline of MD block 3

BI MD 50-Hz and 8-kHz investigation using BBQ Aim: check if small fault currents passing along vacuum chamber can induce 50 or 8 kHz beam oscillations; during earlier TS two taps were installed on the B2 vacuum chamber right of P4. Distance between taps is ~10 metres. Maximum current ~50 mA rms (tbc). Result: Exciting on off- and on-resonance of the horizontal tunes observed signal levels similar to those generated by the 50 Hz lines. Marek Gasior, Ralph Steinhagen excitation on tune resonance, 3120 Hz off-resonance excitation, 3090 Hz w/o excitation 27-11-2012 MD block 4

BI MD – BPM studies start scraping first beam 1 and then beam 2 ; Synchronous orbit using several OrbitBunch masks (overlapping and not overlaping bunches): Effect of crosstalk at striplines with different ratios of beam intensities and with a cogging of B2 phase to look for the worst case at the striplines. Testing the interlock behaviour in high sensitivity mode. The reflections were not observable anymore in B2 at 1.3e10p/bunch at high sensitivity. Determining the B1 limit needs postprocessing of the off-line data. start scraping first beam 1 and then beam 2 ; at the end switching to high sensitivity

BI MD – new filling scheme for p-Pb MD 200ns_4Pb_318p_24b14bpi lead in B1 and protons in B2 at the end of BI MD switched machine to ion-proton physics; hypercycle changed at flat bottom and RF settings changed

p-Pb MD – ion beam 17:10 first Pb beam in LHC large difference in the SPS probably comes from the tune difference (0.13 for p, 0.3 for Pb); the difference is corrected in the line second Pb bunch in after moving the buckets by one unit 17:40 BLM spurious trigger in IP5 dumped the beam bunch length evolution

p-Pb MD – ion beam cont’d ion tune spectrum & ion orbit after centering by ~16 Hz longitudinal bunch spectrum for B1 (ions) bunch 1 and 2160 27-11-2012 MD block 4

p-Pb MD – proton beam cont’d 19:48 first p beam in LHC ring 2 p orbit without OFB correction & p tunes w/o correction 21:44 SPS ready with 200ns batch cycle. First 24 p bunches dumped because of beam losses in IP7 due to wrong ADT settings (B1/B2 swap).

p-Pb MD – proton beam On the next attempt, 3 batches of 24 p bunches were injected, but when injecting the 4th batch, interlocked BPMs triggered. The rest of the MD was spent on improving p beam in the SPS.

MQY TF MD LHC optics team after MQY calibration early this morning (R. Tomas et al) LHC optics team after MQY calibration early this morning 14-09-2012 Outline of MD block 3

MQY TF MD Optics measurements at injection and flattop with new MQY calibrations. First analysis points to an improved optics (as expected!). Afterwards, a few kicks mostly horizontally to measure amplitude detuning at flattop. Detailed analysis off-line. 5:31 RQTD.A67B1 tripped on a power converter fault. DQAMS is in FIP_COM_LOST. phase beating error in IR8 (vertical) improved by factor 2

RF Study MD - ongoing Plan: (P. Baudrenghien) Plan: We will start with the RF Voltage Modulation part. This was already done during last MD but with a very slow adaptation rate. We want to repeat with faster rate. The risk is slow debunching (machine half full, nominal intensity, 50 ns batches, 450 GeV). No debunching was observed in the previous trial. If things go well we will move to the longitudinal stability part. We will excite a single longitudinal coupled-bunch mode n using narrowband phase noise excitation at n frev ±fs, then switch the excitation off, record single bunch phase evolution and deduce damping time. We will repeat the experiment for various modes (n), while reducing the gain of our feedback loop (thereby increasing the effective cavity impedance). Full machine, 450 GeV. Again the risk is slow debunching while we excite the longitudinal mode. There is no risk to become unstable: we only measure lengthening of damping time and will not reach the instability threshold. 14-09-2012 Outline of MD block 3

MD#4 Plan Mon – Tue (26. – 27.11.) Tue 00:00 Ramp down 02:00 Day Time v MP class MP Comments Tue 00:00 Ramp down 02:00 450 GeV 4 TeV: MQY transfer function A 4 TeV. Pilote bunches (1-3e10p/bunch). Standard optics measurements with different MQY transfer funtions. 06:00 08:00 450 GeV: RF study (longit. stability for batch or RF voltage modulation) B 450GeV A few nominal batches of 144b. RF Voltage modulation: fill half of the ring, to test the corrected algorithm of voltage set point adjustment Longitudinal stability: Full ring with max. bunch intensity. Excite a single mode in the beam with decreasing gain in the feedback loop. (More details see slides) 16:00 450 GeV: beam-beam (noise or impedance) C 450 GeV In total 9 bunches per beam with different intensities (from 1e11 to 2e11), zero crossing angle in IP1, IP2 and IP5. Nominal crossing angle in IP8. Collision tune, Damper (ADT) off Introduce increasing noise with ADT Increase ADT gain in steps Scan separation in IP1 and 5 with 4 bunches (from 1e11 to 2e11) with damper of. 22:00 450 GeV 4 TeV: Collimation impedance & follow up from last MD 4 TeV ~3b (1.3e11p/bunch) below SBF Alignment of collimators Impedance studies with tight collimator settings and moving IR7 collimators back and forth.

MD#4 Plan Wed – Thu (28.-29.11.) Wed 04:00 Ramp down 06:00 Day Time MD MP class MP Comments Wed 04:00 Ramp down 06:00 450 GeV 4 TeV: two –beam impedance C 4TeV, squeeze to beta*=1.5m 150 bunches per beam (nominal filling scheme) Move beam 2 clockwise Reduce octupole currents in 5 different configurations (0 turn, ¼ turn, ½ turn, ¾ turn and 1 turn cogging) (More details see slides) 14:00 16:00 450 GeV: transverse impedance localization at injection 450GeV 8bunches with different intensities, equally spaced (5e9 … 1e10 … 5e10 … 1e11 … 1.5e11 … 2.2e11) Create kick with AC dipole or kicker Tune shift 2.1e-3 Move TDI Parallel measurement with ADT? (More detials see slides) 18:00 450 GeV: TCDI automatic setup A 450 GeV Pilot bunches (1e10p/bunch) 22:00 450 GeV 4 TeV: bunch flattening with RF phase modulation B 450 GeV and 4TeV Nominal LHC beam, i.e. 1374b per beam Add flattening signal (sine-wave close to the synchrotron frequ.) The MD will have ramp and all steps before physics. Measure effects of heating and transv. Instabilities. Thu 02:00 End of MD#4