L.Fiore Gantry Meeting during the CMS TK week

Slides:



Advertisements
Similar presentations
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Advertisements

Status Brussels GANTRY Ê We have observed a significant influence due to temperature 4 we had a lot of problems with our cooling system (ventilation) Ë.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Status Brussels GANTRY
2S module geometry updates Module positioning concepts
Rod adaptors for module tests Module positioning studies
Status Brussels GANTRY
Hybrid & Module Testing Status
US Module Production Status
Executive summary from Bonding WG Meeting 21 Oct 2003
Hamburg Bonding Report
A. Kaminskiy, CMS Tracker week , Apr 2004
Vienna Module Production
CMS Perugia Modules Production Review
Module production in Italy
TEC Module Production Overview
Bari production centre resp. M. de Palma
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
CMS Perugia Gantry Status Report
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Module Production in Brussels
Module Testing in Florence Carlo Civinini INFN-Florence
US Module Testing Progress Report
Hybrid & Module Testing Status
TEC module quality overview
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Recent TOB Developments
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
US Module Testing Progress Report
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Equipment Status ARCS equipment status DAQ equipment status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
First prototype module released from the assembling platform
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
Università di Catania and INFN – Sezione di Catania
FNAL Hybrid Testing Status
Presentation transcript:

L.Fiore Gantry Meeting during the CMS TK week Bari hw status 409 r-phi frames shipped from Pisa ,to be assembled No stereo frames are available till now (only two dummies) 121 Hybrids Layer 1,2 (6 apvs) received from CERN 227 hybrids Layer3,4 (4 apvs) received from CERN 48 hybrids stereo-left received from CERN 30 hybrids stereo-right received from CERN 8 hybrids failed ARC tests 3 assembly plates for r-phi modules are operational (12 module/day production feasible) 1 assembly plate for stereo-left modules under commissioning April 20th 2004 L.Fiore Gantry Meeting during the CMS TK week

Modules assembled in Bari 330 good modules were assembled till now (4 bad) 110 TIB Layer 1, phi (IB1 Sensor and 6 apv hybrid on board) 220 TIB Layer 3,4 phi (IB2 sensor and 4 apv hybrid on board) We are waiting for more r-phi hybrids to continue the assembly job Stereo hybrids shipped from CERN were ARC tested but till now were not assembled April 20th 2004 L.Fiore Gantry Meeting during the CMS TK week

L.Fiore Gantry Meeting during the CMS TK week Pictures from Bari April 20th 2004 L.Fiore Gantry Meeting during the CMS TK week

L.Fiore Gantry Meeting during the CMS TK week April 20th 2004 L.Fiore Gantry Meeting during the CMS TK week

L.Fiore Gantry Meeting during the CMS TK week April 20th 2004 L.Fiore Gantry Meeting during the CMS TK week

L.Fiore Gantry Meeting during the CMS TK week conclusions The production is going on with no big problems We will try to start the stereo module assembly as soon as possible, provided we’ll have some stereo frames The 12 modules per day is faesible but the problem is on the complete set of operations around the gantry assembly job (ARC testing,registering on db, shipping, mounting modules on the module-carrier etc..) that is now at the limit with the present man-power April 20th 2004 L.Fiore Gantry Meeting during the CMS TK week