Material Requirement Planning (MRP)

Slides:



Advertisements
Similar presentations
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
Advertisements

15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning 15.
Material Requirements Planning (MRP)
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
© 2007 Pearson Education Resource Planning Chapter 15.
Class 24: Chapter 15: Materials Requirements Planning Class 24 Agenda –Review Deliverables Due Dates –Review Final Exam 90% of the 30 questions will come.
Material Requirements Planning and Enterprise Resource Planning Dr. Ron Lembke.
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
MRP, MRP II, and ERP.
Material Requirements Planning
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Managing Business Processes: Demand Management Cheng Li, Ph.D. California State University, Los Angeles January 2002.
OPERATIONS MANAGEMENT for MBAs Fourth Edition
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
Operations Management Material Requirements Planning
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Chapter 15 MRP and ERP.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
Materials and Resource Requirements Planning CHAPTER FIFTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Resource.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Aggregate Planning and Resource Planning Chapters 13 and 14.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 15.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Resource.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning Chapter 15.
Production Planning and Control
Resource Planning Chapter 15.
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing Systems Engineering
BUAD306 MRP.
Resource Planning Chapter 16 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
CHAPTER-14 MRP AND ERP MD. TAZIDUL ISLAM. 2  Material Requirement Planning (MRP) is the concept of designing and developing information system to aid.
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1. Enterprise Resource Planning Enterprise Resource Planning Systems is a computer system that integrates application programs in accounting, sales, manufacturing,
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Chapter 13 MRP and ERP.
SISTEM INFORMASI ENTERPRISE
LESSON 5 Introduction to Materials Requirements Planning (MRP)
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
Facility Inventory Old Facilities Modern Facilities Classroom Size
Resource Planning Chapter 16
Chapter 16 Materials Requirements Planning
Material Requirements Planning and Enterprise Resource Planning
MRP and ERP.
CHAPTER 14 MRP and ERP.
Material Requirement Planning (MRP)
Efficient Resource Planning Chapter 11
MRP and ERP.
14 MRP and ERP.
MRP Introduction EXAMPLES
Resource Planning Chapter 16
Chapter 14 Dependent Demand
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Material Requirement Planning (MRP) A computerized information system to aid in managing dependant demand inventory and scheduling replenishment orders Purposes of MRP Inventory – right part, quantity, time Capacity – complete load Priority – due date Getting the right material to the right place at the right time

Material Requirement Planning (MRP) Inputs to MRP Bill of material (BOM) Master production schedule (MPS) Inventory record database Bill of Material (BOM) all the components of an item usage quantities (for unit parent) the parent-component relationships

Material Requirement Planning (MRP) Bill of Material Seat Assy Ladder back Assy Back slats Seat Frame Seat Cushion Seat Frame Board Back legs Chair Front legs Leg supports

Material Requirement Planning (MRP) Bill of Material Chair Ladder back subassy Front legs Leg supports Seat subassy 1 2 4 1 Back legs Back slats Seat Frame Seat Cushion 2 4 1 1 Seat Frame Board 4

Material Requirement Planning (MRP) Master Production Schedule (MPS) Details of how many end items will be produced within specified periods of time April May Aggregate 670 Week number 1 2 3 4 5 6 7 8 Ladder-back Chair Kitchen chair Desk chair 150 150 120 120 200 200 200 200

Material Requirement Planning (MRP) Projected on-hand inventory (37) Inventory Record A record that shows an item’s lot-size policy, lead time and various time-phased data Lot size = 230 unit Lead time = 2 wks Week No. 1 2 3 4 5 6 7 8 Gross requirements 150 120 Scheduled receipt Projected on-hand inventory (37) Planned receipt Planned order release 230 117 117 117 227 227 77 187 187 230 230 230 230

Material Requirement Planning (MRP) Projected on-hand inventory (37) Inventory Record Lot size = 230 unit Lead time = 2 wks Safety stock = 80 unit Week No. 1 2 3 4 5 6 7 8 Gross requirements 150 120 Scheduled receipt 230 Projected on-hand inventory (37) Planned receipt Planned order release 117 117 117 227 227 307 187 187 230 230 230 230

Material Requirement Planning (MRP) Projected on-hand inventory (37) Inventory Record Lot for Lot Lead time = 2 wks Week No. 1 2 3 4 5 6 7 8 Gross requirements 150 120 Scheduled receipt 230 Projected on-hand inventory (37) Planned receipt Planned order release 117 117 117 Uncertain future order Perishable goods 3 150 120 3 150 120

Material Requirement Planning (MRP) Master Production Schedule Customer Order Forecast Master Production Schedule (MPS) Inventory Records MRP Explosion Bill of Material Material Requirement Planning (MRP)

Material Requirement Planning (MRP) Example A C B D D 2 F Week No. 1 2 3 4 5 6 Gross requirements of A 80 Gross requirements of C 50

Material Requirement Planning (MRP) For A (LT = 1 wk; lot for lot) Week No. 1 2 3 4 5 6 Gross requirements Scheduled receipt Projected on-hand inventory Planned receipt Planned order release 80 80 80 For C (LT = 1 wk; lot for lot) Week No. 1 2 3 4 5 6 Gross requirements Scheduled receipt Projected on-hand inventory Planned receipt Planned order release 50 50 50

Material Requirement Planning (MRP) For D (LT = 2 wks; lot size = 100) Week No. 1 2 3 4 5 6 Gross requirements Scheduled receipt 50 Projected on-hand inventory (15) Planned receipt Planned order release Week No. 1 2 3 4 5 6 Gross requirements Scheduled receipt 50 Projected on-hand inventory (15) 65 85 Planned receipt 100 Planned order release 80 100

Manufacturing Resource Planning (MRPII) Master Production Schedule Customer Order Forecast Master Production Schedule (MPS) Inventory Records MRP Explosion Bill of Material Material Requirement Planning (MRP) Financial Data Manufacturing Resource Planning (MRPII) Purchasing Reports Financial Reports Marketing Reports HRM Reports Manufacturing Reports

Enterprise Resource Planning (ERP)