A2/B2 CROSSCONNECT VALVE FPL (located on D1 Level)

Slides:



Advertisements
Similar presentations
Inspect Water Distribution EO Inspect Ship Water Supply Ship Plumbing Characteristics TP 15.
Advertisements

WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT Week of: August 5 th, 2013 – August 9 th, 2013.
Family drip system for 500 sq. meter. Water tank 4 m^3.
INVESTIGATION LESSON TOPIC 1.9 IDENTIFY IDENTIFY the need for principle of, and equipment required to investigate for fire, flooding and structural damage.
AB 11 22 33 44 55 66 77 88 99 10  20  19  18  17  16  15  14  13  12  11  21  22  23  24  25  26  27  28.
GNI0003H PP1 Loop Trainer. GNI0003H PP2 Reason for Study Because the Loop Trainer gives instructors the capability to control water flow, pressure and.
1984 National OSHA Record 6486 accidents. 516 injuries. 90 deaths.
1 Damage Control Rapid Plotting. 2 Enabling Objectives 1 Select statements which describe the purpose of DC diagrams, status boards and logs 2Record casualties.
Damage Control II Objectives DC Actions & Reports DC Actions & Reports Classes of Fires & Combating them Classes of Fires & Combating them Firefighting.
CHAPTER 24 PIPING DRAWING Instructor: M.Yaqub. Chapter 24 piping week# Steel and Wrought Iron Pipe Common use for water, steam, gas and oil. Up.
AC Power TCZ Pump VVVF Drive TT 2 W/H CWS 4-way valves TT 3 TT 4 TT 1 S2 S1 FT 1 CWR FT 2 CW CWS = Cold Water Supply CWR = Cold Water Return CW = Cold.
Skilled Trades 1201 Residential Plumbing.
The Irrigation Technology Center Proposed Flow Meter Installation Laboratory.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
2015/07/07 Dr Danie Nel Pr Eng 1 WATER SUPPLY RISKS.
Stock and Flow Diagram Roesfiansjah Rasjidin PS Teknik Industri FT - UEU.
Three compounds are needed to make a nucleotide OH O OH OH deoxyribose P O OH OH OH and phosphoric acid N N NH N NH 2 a base (this one is adenine) They.
Paul Wolf.  Understand what turf grass is and what it is used for.  How to select an irrigation system.  How to install an irrigation system.  Maintaining.
Damage Control Systems and Equipment Objectives A. Know the 4 classes of fire and the firefighting agents, equipment, and procedures to extinguish.
-P&ID- Piping & Instrument Diagram
Plan Review Required Materials [ARM (3)] – (a) a plan view and a sectional view of both the pool, spa, or other water feature or related facility,
Circuits and Symbols. The flow of electrons through a circuit Electricity A closed circuit allows electricity to flow An open circuit has a break so electricity.
Top Secret Secret Internal use only Public Water Valves.
Dewatering Equipment.
DESIGN AND CONSTRUCTION OF AN INDUCTION FURNACE (COOLING SYSTEM) Presented by MG THANT ZIN WIN Roll No: Ph.D-M-7 Supervisors : Dr Mi Sanda Mon Daw Khin.
An intelligent water damage protection system Patent pen.
Firemain S W O T E A M D G C N R L American LaFrance LT.311.
Damage Control Training and Testing
Investigator Casualty Guide Identifying & Assessing Damage “Looking Deeper” March 2013.
Plumbing Prints Unit 15.
Barry's Advanced Construction of Buildings, Second Edition, by Stephen Emmitt and Christopher A. Gorse. © 2006, 2010 by Stephen Emmitt and Christopher.
Hydraulic Kit (pump and tank) Pictures from prototype.
FLOODING OVERVIEW FLOWCHART
1 HVACR216 - Hydronics Pipe support and Pipe fittings.
8-1 Building Blocks of Geometry Warm Up Solve. 1. x + 1 = = 2x 3. x – 7 = 6 4. = x3x
too.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
STRONG PARTNERS FOR SMALL DIAMETERS Process technology for lying a drainage piping under ground water BOHRTEC PROCESS TECHNOLOGY.
Plumbing Tools ˚ Pipe Elbow 45˚ Pipe Elbow Making a 45 degree turn with a pipe.
SAFETY AND ECONOMIC CONSIDERATIONS To ensure no overflow in treatment tank – Another pipe will be installed on the gutter To ensure continuous supply of.
Fire Fighting Systems Fi Fi Mains ●White System: This system has a lower output as far as volume goes. This main supplies 3x Eductor/Hydrants (500 gpm).
Weekly Checks Monday – VSP Room Tuesday – Pilothouse System Controls Wednesday – Starboard / Engine Room Thursday – Foam Room Friday – Port / Engine Room.
Fire/General Service/Ballast Pumping Systems
1 OF 16 INFO:You observe that this fire pump system is leaking. This fire pump system is not designed to leak. DEF:Leaking Central Water Supply (Domestic.
WELCOME Project Electric Power Plant. Electric Power Plant Electric Power Plant.This is the age of Technology. In this age there is no place where we.
Step One The first step to designing a sprinkler system is to create a diagram of the area you wish to irrigate.
How do think this affects the animals in your neighborhood? Amounts greater than 250 mg/L of salt causes death in animals. ←
Step One The first step to designing a sprinkler system is to create a diagram of the area you wish to irrigate.
12 x 12 = x 11 = x 10 = x 9 = 108.
What is the difference between Annual and Five- year sprinkler test.
Plot Diagram.
Friday – port side engine room weekly checks
Direction water flow Notes: Occupancy type is PUBLIC The WCs (toilets) are public flush valve.
Module 3 Domestic Heating/MMA Welding
Evacuation, Complete or Partial Facility
Booster Hose Reel Location/Operations.
Pipe Principles PREPARED FOR November 22, 2018.
Acids and Bases What is the pH scale?.
Electric Current.
DC FITTINGS LOCATION & IDENTIFICATION
18 Salvage and Overhaul.
A2/B2 CROSSCONNECT VALVE FPL (located on D1 Level)
W = PV Figuring out work: s The piston moves out a distance s: derive
Lesson 4.10 Installed Ballasting Systems
By:Arianna,Abel,Zair,Brenda,Betty,Karli,ricky,
General classification:
Damage Control Plotting Drill #1
*** Series PRS Version 1, ***
Damage Control Rapid Plotting
NAVSEA 05L4 Damage Control USS COLE DDG67.
Presentation transcript:

A2/B2 CROSSCONNECT VALVE FPL 1-32-1 (located on D1 Level) DCETF SECOND DECK PIPE RUPTURE PIPING DIAGRAM 0-2 LEVEL 0-2 LEVEL A2/B2 CROSSCONNECT VALVE 01-29-1 PR 1 CW PR 6 FM PR 1 FM PR 2 TF 01-24-7 TF 01-27-5 TF 01-30-1 TF 01-33-1 TF 01-36-1 TF 01-28-1 BH 3 TF 01-25-1 CW PR 2 TF 01-30-3 FPL 1-27-1 CW PR 3 TF 01-24-3 TF 01-27-3 SW PR 5 FPL 01-32-1 01-24-5 TF 01-24-1 TF 01-27-1 PIPING TO A1 PR 3 JP-5 PR 4 PIPING TO B1 PIPING TO A1 TF 01-31-11 A2 SPLIT SEAM COV FPL 01-31-7 TF 01-31-9 F1 SPLIT SEAM BH 1 COV TF 01-31-5 D1 SPLIT SEAM OH2 COV TF 01-31-1 D1 SPLIT SEAM OH1 COV TF 01-31-3 F1 SPLIT SEAM BH 2 COV FPL 1-32-1 (located on D1 Level)

DCETF SECOND DECK BULKHEAD RUPTURE PIPING DIAGRAM A2/B2 BH DAMAGE WATER SUPPLY COV DCETF FIREMAIN COV 1-29-1 TF 01-35-1 TF 01-26-1 TF 01-27-1 TF 01-31-1 TF 01-33-1 BH 1 BH 2 BH 1 BH 2 BH 3

DCETF SECOND DECK DRAIN PIPING DIAGRAM DRAIN TO W1 DRAIN TO W1 01-27-1 B2 DRAIN VALVE 01-36-1 A2 DRAIN VALVE