RDR Baseline Layouts for Interaction Region

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
A. Hervé - 13 august 2007 ILC-IRENG Meeting of Working Group A: 13 Aug 07 Proposal for an Experimental Area With only One Large Shaft A. Hervé/CERN.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Construction and Installation of the CLIC Experimental Area
19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC.
ILC CFS / CLIC CES Studies for the Interaction Region : - An action was given at the Geneva Linear Collider Meeting for CFS to develop a more in-depth.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
Global Design Effort BDS updates SLAC 1:30 Monday meeting Andrei Seryi November 5, 2007 Previous update – August 20, 2007.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
1 J.Osborne (CERN)
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
Extraction and beamline progress B.Goddard TE/ABT.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
CES Studies at CERN for the Interaction Region : -Summary of Linear Collider IR meeting at CERN held on 16 February Design Brief for external design.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
Philip Burrows SiD Monthly Phone Meeting, 4/10/071 IR Issues from IRENG07 Philip Burrows John Adams Institute Oxford University.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Experimental Hall in Mountain Regions
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
CLIC Handling Engineering Update
CLIC Civil Engineering Update
Conventional Facility & Siting (CF&S) Overview for the Positron Source
Detector Utility/Service Cavern
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
Tunnel Cross Section Studies
CLIC / ILC Collaboration for CFS works
Interaction Region Alternative Layouts
FCC Civil Engineering update
Part II: Integrated Design of Infrastructures
Detector Service Cavern for ILC
Detector hall in mountain regions
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
A very first look at siting issues
COOLING & VENTILATION INFRASTRUCTURE
An integrated design for ILC detectors services
Detector hall in mountain regions
Presentation transcript:

RDR Baseline Layouts for Interaction Region J.Osborne CERN - 24 July 2007

RDR Baseline Layouts for Interaction Region J.Osborne CERN - 24 July 2007

RDR Baseline Layouts for Interaction Region 400 ton crane design needs to be checked, most lightly large steel columns will be needed Lot of lost space 400t RDR Baseline Layouts for Interaction Region J.Osborne CERN - 24 July 2007

Can Endcaps be opened within existing cavern width ? RDR Baseline Layouts for Interaction Region J.Osborne CERN - 24 July 2007

Service Cavern Shaft moved to the end of the cavern ? Advantages : Shaft is over the bypass tunnel to ease machine installation Easier passage from detector hall into service cavern. J.Osborne CERN - 24 July 2007

Additional Service Caverns 30metres long ? Extra costs for cavern v savings in services need to be assessed With 2 service caverns, perhaps lifts, staircase could be removed in Exp. Cavern ? J.Osborne CERN - 24 July 2007

Extend Experimental Cavern by 6metres for Secondary Services such as : magnet electrical cooling circuits (transformer, DC power supply etc), cryogenic and vacuum components for the magnet, cooling water for the skids…… J.Osborne CERN - 24 July 2007

Concrete modules with lift & staircase inside Typical Shaft Layout Concrete modules with lift & staircase inside Steel Staircase for services installation Ventilation ducts J.Osborne CERN - 24 July 2007

‘RDR’ Surface Building Layout for Interaction Region Detector Assembly areas to be constructed as quick as possible to ‘move’ underground civil works off the critical path ‘RDR’ Surface Building Layout for Interaction Region J.Osborne CERN - 24 July 2007

Cable chains : CERN propose at least 2 chains for detector services Cable chains : CERN propose at least 2 chains for detector services. (Concept by H.Gerwig & A.Gaddi) Trenches to be formed in the cavern floor invert (non structural concrete) J.Osborne CERN - 24 July 2007

Structural Invert heavily reinforced Infill concrete area, could be used for sliding platforms and cable chain trenches Structural Invert heavily reinforced J.Osborne CERN - 24 July 2007

Conclusions / Comments Infinite number of Civil Engineering layouts possible : Feedback needed from Detector Communities at SLAC Workshop, to ‘advance’ the design. ‘Concept’ layouts & alternatives could be presented at SLAC Workshop to stimulate discussion and provoke Value Engineering exercises eg Two service caverns. Would it be useful to develop concept drawings for SLAC ?, indicating : Surface Assembly / Sliding shaft cover Underground Moving Platforms J.Osborne CERN - 24 July 2007