Confirmation Notice Period for Certain ‘Unique’ Sites

Slides:



Advertisements
Similar presentations
COR2557: Revisions to the Metering Charges Pricing Module on Unique Sites UK Link Committee – January 2014.
Advertisements

UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Nexus Workgroup CSEP Transition Topic June
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Distribution Network Interruption - Initialisation 28 September 2010.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
SoS Report PAC – 13th December 2016.
Transmission Workstream 6 January 2011
David Addison / Steve Deery
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Proposer: Matthew Hatch Panel Date: 20/10/16
Review of Demand Estimation Times for Modification Proposal 461
Distribution Workgroup 24/11/16
xrn4361 UK Link Future Release 2
Introduction of Code Contingency Guidelines Document
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
Market Trials ChMC 8th August 2018.
Unique Sites End to End Process Walkthrough
Proposer: National Grid NTS Panel Date: 17th April 2014
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Connected System Exit Points Administration Options
Chris Warner Network Code Manager
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Connected System Exit Points Administration Options
0630R Review Group meeting 21 February 2018 Settlement Data topic
Release 2 Scope Business Benefit Review
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Transmission Planning Code Review
UNC Modification Proposal 0201 National Grid Distribution
Credit Modification Proposals Update
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
DN Interruption & Charging
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Introduction of Code Contingency Guidelines Document
Interruptible to Firm – NTS Supply Point Transition
Transmission Workstream – Partial Assignment
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
OCC & Standard Commodity Changes
CUSC “Alternate” Proposal process
UK Link Replacement Programme additional supporting UNC modifications
Reinstatement of NTS Interruption
Proposer: Debbie Brace Panel Date: 20th March 2014
SPA Processes for DM Sites
Lessons Learnt UKLC - November 2015
Nexus Workgroup Mod 0473 Presentation
DN Interruption Phase II
Gemini Code Contingency Review
Implementation Approach Distribution Workgroup – June 2014
Limiting GAS State-1 Query Response Length
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Customer Issue Management CoMC Update
Transmission Workstream 05 November 2009
Annual Quantity (AQ) 45.
Retail Energy Code - Data Access Schedule
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Industry Shipperless & Unregistered Working Group
Customer Issue Management Dashboard CoMC - July 2019
Enabling Large Scale Utilisation of Class 3
Presentation transcript:

Confirmation Notice Period for Certain ‘Unique’ Sites Phil Lucas

Confirmation Notice Periods G2.5.7 "Proposed Supply Point Registration Date" - the date with effect from which the Proposing User wishes to become the Registered User. G2.5.8 Proposed date will be (relative to date of submission of confirmation): Not more than 30 business days, Not less than 15 business days, Unless subject to incumbent withdrawal, if so, 8 Unless no change to User, if so, 8 Unless reconfirming commodity rate (shorthaul), if so, 4 Where the Supply Point Offer is made by Batch Transfer Communication not earlier than 2 months.

Batch Transfer Communication a data file containing one or more messages transmitted by a Transporter or by a UK Link User by means of the UK Link Network, as described in the UK Link Manual.

Evolution of para G2.5.8(c) Network Code Mod 0214 (May 1998). NTS Optional Commodity (NTS Shorthaul), Mod Proposal: Where Exit Point needs to be removed from S&M, 2 months, and commence on the 1st of a month, Legal text: tied the 2 month notice period to Supply Point Offers communicated via Batch Transfer Communication. Network Code Mod 0428 (Nov 2000). LDZ Optional Capacity Tariff (LDZ Shorthaul) Mod Proposal: registration restrictions equivalent to Mod 0214. Legal Text: retained link to Batch Transfer Communication. Network Code Mod 0464 (Sep 2001). Streamlined Shorthaul registration rules Mod Proposal: Removed requirement to commence on 1st of a month

When and Why is 2 months Notice Required? LDZ Supply Point becoming a Special Metering Supply Point – SMSP (G7.1.1(d)) requiring ‘removal’ from the Sites and Meters database. LDZ Supply Point reverting to normal Supply Point Status from SMSP requiring addition to the Sites and Meters database. Why Additional administration in establishing correct SPA and billing arrangements. Principle of additional time requirements recognised in implementation of Network Code Mods 0214 and 0428.

Draft Modification Proposal Removes apparently erroneous requirement for Confirmation of all Supply Point Offers communicated via Batch Transfer (ie: the majority of such) to provide Transporter with 2 months notice. Clearly defines the occasions in which two months notice is required. Shared Supply Meter Points have their own distinct registration requirements under G1.7.10. NTS Supply Points will not be present on the Sites and Meters database and therefore those that are not SSMPs will be subject to standard confirmation notice requirements as per G2.5.8(a) and (b).

Questions?