Magnet PS Controls Hardware Status

Slides:



Advertisements
Similar presentations
Used to Procure Goods & Supplies. Office supplies Operating supplies Computer hardware and software (non- capitalized
Advertisements

December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade1 AIP /02 Review LINAC SECTORS 22 AND 23 QE MAGNET POWER SYSTEM UPGRADE.
1 Arturo Alarcon 1 Undulator Controls Status FAC Undulator Controls Status Arturo Alarcon June 9, 2009.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
SPEAR Insertion Device Controls Upgrade Status Arturo Alarcon January, 2014.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Controls for High-Availability Magnet PS’s for ATF2 Glen White SLAC September
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.
IRMIS 2 Overview Andrew Johnson Computer Scientist, AES Controls.
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
Control Group April 26, 2006 Progress of Control System Presented by C.H. Wang Control Group Accelerator Center of IHEP IMAC, April
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
K. Luchini LCLS Controls, July 1, 2005 SLAC Aware IOC EPICS Magnet Functional Requirements Introduction Magnet Functions.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
K. Luchini LCLS Week, October 26, 2005 Magnet Controls K. Luchini Overview Hardware Software SLC Aware IOC Database Modeling.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
EPICS EPICS Collaboration Meeting Argonne June 2006 IOC Redundancy: Redundancy Monitor Task EPICS Meeting - Redundancy Argonne, June 16, 2006 Matthias.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Hamid Shoaee Control LCLS ARR Oct 31, LCLS Accelerator Readiness Review Control System for Injector Commissioning.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues “How to integrate the legacy system.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues Subsystem architecture, or… “How.
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Integrating Advantech PCI I/O cards into EPICS. Outline ANTARES computer control and data acquisition systems architecture STAR computer control and data.
SNS Integrated Control System ORACLE –JERI DB Generation April 27, 2004 Coles Sibley Jeff Patton.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Chapter 4. CONCEPT OF THE OPERATING SYSTEM MANAGING ESSENTIAL FILE OPERATIONS.
MicroTCA Development and Status
PIXEL CAEN Installation Status
Cryogenic Plant Controls – Cost and Schedule
Status & Plans for WA105 Control System
Collaboration meeting 26 to 28 June 2017
Automatic RElease Service
ATF2 Magnet Power Supplies
AIP /02 P Bellomo - QE Magnet Power System Upgrade
Hall A Compton Electron detector overview
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
OPERATING SYSTEM OVERVIEW
کنترل و فرآیند ابزار دقیق براساس توصیه API 554
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
LTU/Undulator Installation Status
Unit 1: Introduction to Operating System
Undulator Vacuum System
Vertical Cryostat Kick-off metting
Control Hardware & Status
e-Beams Systems Update
Magnet Controls K. Luchini
Undulator Vacuum System
Status Vacuum Control-Command for AdV
LS1 status 07/04/2014.
2007 Downtime Controls Installation
LTU/Undulator Installation Status
DOE Review 7-9 February, 2006 Steve Lewis
Commissioning the European XFEL cryogenic system and best practice
CHIC: Possibilities of Supply
A very basic introduction
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LCLS Undulator Controls Status
LCLS Control System Personnel Linac & BC2 Controls progress
Rack installation and local tests for the MEBT Chopper Rack
SLC-Aware IOC Magnet Functional Requirements
Presentation transcript:

Magnet PS Controls Hardware Status BYKIK Pulser Under construction Installation - May 10th in b005 Procurements Order - Done Delivery Intermediates – on schedule, b5 ps have arrived. MCOR - arrived MCOR Bulks – arrived PLC’s – arrived, awaiting BYKIK plc. VME I/O and CPUs - Arrived Drawings – Done Cable Plant – Done Racks Populated in b24 high bay Awaiting VME and intermediate PS installation

Magnet Controls Software Status 1/2/2019 Magnet Controls Software Status EPICS software – use injector/bc1/bc2 drivers and device support sequences EPICS Databases - 1 month BSY, LTU, Undulator and Dump Configuration Files - 1 month SCORE ChannelWatcher ChannelArchiver EDM Displays – 1 month Magnet Power Supply API published for physicist usage – done (upgrade) System Integration BYKIK – May 2008 Sept - Oct 2008

Installation Schedule

Magnet Racks Field test 6 new Intermediate and 96 new MCOR systems