Decommissioning Rulemaking

Slides:



Advertisements
Similar presentations
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
Advertisements

1 NRC Regulatory Initiatives National Radiological Emergency Preparedness Conference 2009 April 21, 2009 Bill Dean Deputy Director, Office of Nuclear Security.
February 26, August 27, 2013 Entergy announces it will cease operations December 29, 2014 Permanent Shutdown April 2016 Implement.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 Rules and responsibilities of the regulatory body Jiří Veselý, SONS, Czech republic.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
U.S. Nuclear Regulatory Commission: Proposed Tribal Policy Statement National Tribal Air Association February 26, 2015 Michelle Ryan, Intergovernmental.
September 24, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee (ENVY)
RIC 2008 Power Reactor Security Requirements Rule Bonnie Schnetzler Team Leader, Security Rulemaking Team Division of Security Policy Office of Nuclear.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
1 Part 74 Material Control and Accounting (MC&A) Rulemaking Update NMMSS Users Annual Training Meeting Las Vegas, NV – May 20, 2010 Thomas Pham Material.
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
1 Status of Ongoing Rulemakings and Safety Culture Update Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking OAS Annual.
Status of Ongoing Rulemakings OAS Annual Meeting August 29, 2012 Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking.
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
International Atomic Energy Agency School for Drafting Regulations on Radiation Safety RER/9/096 Vienna, 3 May, 2010 Adriana Nicic, Regulatory Activities.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Decommissioning San Onofre
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
James Shaffner, Project Manager
Nuclear and Treaty Law Section Office of Legal Affairs
Update on EPA Regulatory and Guidance Activities
NRC Update of Low Level Waste Emerging Issues
NRC’s Category 3 Source Security and Accountability Initiatives
Vermont Yankee Decommissioning Update
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Office of Nuclear Material Safety and Safeguards (NMSS)
Industry Guidance on Part 21 Evaluation and Reporting
Nuclear and Treaty Law Section Office of Legal Affairs
NRC’s LLW Regulatory Program: Update of Emerging Issues
Updating the NRC’s Alternative Disposal Request Guidance Document
10 CFR Part 61 Low Level Waste Disposal Rulemaking Update
Update on Category 3 Source Security and Accountability Initiatives
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
Joseph D. Anderson, Chief
NRC’s LLW Regulatory Program: Update of Emerging Issues
CR3 and Crystal River Energy Complex
Radiation Protection Standards for Nuclear Power Operations
NRC Cyber Security Regulatory Overview
Overview of NRC Low-Level Waste Activities and Initiatives
U.S. Nuclear Regulatory Commission Radiation Safety Standards
NRC’s Ongoing Rulemaking Activities: Recent Developments and Path Forward April 17, 2018 Spring 2018 Low-Level Waste Forum San Francisco, CA Maria Arribas-Colon,
LLW Forum Meeting October 17, 2017 Alexandria, Virginia
Communication and Consultation with Interested Parties by the RB
October 23, 2015 LLW Forum Meeting Chicago, IL Melanie Wong,
SONGS Past, Current, and Future State May 4, 2016
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Possible Transition from Operating to Decommissioning
NRC’s Low-Level Radioactive Waste Program
Research and Test Reactor Safety: The Regulatory Perspective
Revisions to the Concentration Averaging and Encapsulation Branch Technical Position A. Christianne Ridge Division of Decommissioning, Uranium Recovery,
Department of Environmental Quality
USNRC IRRS TRAINING Lecture18
Overview of NRC Low-Level Radioactive Waste Activities and Initiatives
Department of Environmental Quality
NRC Update of LLW Emerging Issues
TRTR Briefing September 2013
RESOLUTION OF GENERIC SAFETY ISSUE 191
Presentation transcript:

Decommissioning Rulemaking Meena Khanna, Chief Reactor Rulemaking and Project Management Branch Division of Rulemaking Office of Nuclear Material Safety and Safeguards Low-Level Radioactive Waste Forum October 4, 2018

Recent and Planned Reactor Shutdowns Six power reactors shut down since 2012 Announcements of plans for thirteen additional reactors to shut down between 2018-2025 Potential for additional shutdowns is uncertain Possible factors affecting licensees’ decisions: Long-term availability of less expensive power Increasing plant modification, maintenance, and repair costs Requests for license amendments and regulatory exemptions NRC staff issued a Lessons Learned Report (ML16085A029)

Lessons Learned Early engagement between licensees and NRC can provide substantial benefits. Licensees should start preplanning before permanent cessation of operations and submit licensing actions well ahead of need dates. Appropriate use of established precedent can expedite NRC staff review. Public and intergovernmental outreach can result in a smoother transition. Rulemaking can provide a more efficient, open, and predictable process than plant-specific licensing actions.

Commission Direction In SRM-SECY-14-0118, the Commission directed staff to address the following issues in the rulemaking: Graded approach to emergency preparedness Lessons learned from recently shutdown plants NRC approval of post-shutdown decommissioning activities report Maintaining three existing decommissioning options and associated timeframes Role of State and local governments and non-governmental stakeholders in the decommissioning process Other issues deemed relevant by staff

Rulemaking Activities Advance Notice of Proposed Rulemaking was issued for comment in November 2015 80 FR 72358 Draft Regulatory Basis (RB) was issued for comment in March 2017 82 FR 13778; ADAMS Accession No. ML17047A413 Regulatory Analysis (RA) for Draft RB was issued for comment in May 2017 82 FR 21481; ADAMS Accession No. ML16271A511 Staff held a public meeting in May 2017 RB was issued in November 2017 82 FR 55954; ADAMS Accession No. ML17215A010 RA for RB was issued in February 2018 83 FR 5373; ADAMS Accession No. ML17332A075 Draft Proposed Rulemaking delivered to Commission for vote in May 2018 SECY-18-0055; ADAMS Accession No. ML18012A019

Outreach Efforts Public meetings and Regulatory Information Conferences (2016, 2017, 2018) Conference call with State of Vermont (2017) Low-Level Waste Forum (2017, 2018) National State Liaison Officer Conference (2017) Decommissioning and Used Fuel Strategy Summit (2017, 2018) Bilateral meetings with Taiwan (2017, 2018) American Nuclear Society conference (2017) Division of Spent Fuel Management Regulatory Conference (2017) Meetings with NEI Briefing to Congressional representatives (2018)

Overview of Draft Proposed Rule Proposed changes to Parts 20, 26, 50, 51, 52, 72, 73, 140, involving 14 technical areas Overarching Philosophy: Provide for an efficient decommissioning process, while maintaining public health and safety Address other decommissioning issues as deemed necessary by the staff Propose new provisions as alternatives, avoiding backfits Use a graded approach to reflect reduction in risk (emergency preparedness, physical security, cyber security, onsite/offsite insurance)

Graded Approach LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 Emergency Preparedness   Docketing of § 50.82/§ 52.110 Certifications Permanent Cessation of Operations + 10 Months (BWR) or 16 Months (PWR) All Fuel in Dry Cask Storage All Fuel Offsite LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 Permanently Defueled Emergency Plan (PDEP) ISFSI Only Emergency Plan (IOEP) Allows for certain physical security plan changes without prior NRC approval Can transition from §73.55 to §73.51 requirements Removal of cyber security requirements Reduction of onsite insurance to $50 million Reduction of offsite insurance to $100 million Emergency Preparedness Physical Security Cyber Security Onsite/Offsite Insurance Post Shutdown Emergency Plan (PSEP) Permanent or Interim Waste Storage Available

Draft Proposed Rule Emergency preparedness Environmental considerations Physical security Cyber security Record retention requirements Drug and alcohol testing Low-level waste transportation Certified fuel handler definition and elimination of the shift technical advisor Spent fuel management planning Application of the backfit rule Decommissioning funding assurance Foreign ownership, control, or domination Offsite and onsite financial protection requirements and indemnity agreements Clarification of the scope of the license termination plan requirement

Draft Proposed Rule, Cont’d The NRC staff recommended addressing some topics via updated guidance or inspection procedures in lieu of rulemaking.  These topics include: Post-shutdown Decommissioning Activities Report submittals The role of State and local governments in the decommissioning process Aging management of certain plant systems, structures, and components

Guidance The NRC staff will publish the following draft guidance documents for public comment at the same time that the proposed rule is published. Draft Regulatory Guide DG-1346, “Emergency Planning for Decommissioning Nuclear Power Reactors” (ML17311B018) Draft Regulatory Guide DG-1347, “Decommissioning of Nuclear Power Reactors (ML17347A794) Draft Regulatory Guide DG-1348, “Assuring the Availability of Funds for Decommissioning Production or Utilization Facilities” (ML17348B485) Draft Regulatory Guide DG-1349, “Standard Format and Content for Post Shutdown Decommissioning Activities Report” (ML17353A727)

Stakeholder Feedback Specific topics of interest Emergency Preparedness Role of local entities in decommissioning process/community advisory boards PSDAR/environmental reviews Decommissioning Trust Funds

Sources of Comments on Draft Regulatory Basis

Path Forward Proposed Rule/Draft Regulatory Guidance Awaiting Commission direction Public meeting will be held after Proposed Rule and Draft Regulatory Guidance are issued for public comment Final Rule/Final Regulatory Guidance Provide to the Commission in Fall 2019 Public meeting will be held to discuss implementation of the rule prior to delivering rule to the Commission for vote