NEWCASTLE MUNICIPALITY

Slides:



Advertisements
Similar presentations
WEATHER Increased risk of hypothermia Makes footing very unstable increasing risks of falls; be aware of cliff edges & steep terrain in these conditions.
Advertisements

COPPER THEFT !. 1 LOSS OF PRODUCTION 2 BREAKDOWNS IN COMMUNICATIONS 3 ENDANGERING TRANSPORTATION.
Lightning Arresters and Their Application
Arrester Application bringing it all together!
Bonding Requirements For Gas Piping Systems Bob Torbin October 2007
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
EE4503 Electrical Systems Design
Thabo Mahlatsi Quantifying Extend Of Energy Theft In Ekurhuleni Metropolitan Municipality.
Electrical Hazards (CLUES) I wiring I wiring E electrical parts E electrical parts U electrical systems and tools U electrical systems and tools O circuits.
Protection against Lightning Overvoltages Overvoltages due to lightning strokes can be avoided or minimized in practice by (d) shielding the overhead lines.
UK BP/SE/NSI 24 Colin Hepton Keadby 400kV Substation.
DET 310 UNDERGROUND CABLES
“INSULATOR IN OVER HEAD LINE”
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
UMKC Senior SUBSTATION DESIGN TEAM
Increasing the life cycle of existing grids to avoid high replacement costs of new systems By S.R.Sethi Member Delhi Electricity Regulatory Commission.
Electric Industry Restructuring New Imperatives in a Competitive Environment Increase Efficiency Improve power reliability and quality Enhance Market Access.
Grounding, bonding, and ground fault currents
Roadway Lighting on TxDOT Right of Way Greg Jones, EIT Master Electrician, State of Texas TxDOT, Traffic Operations Division, Illumination Branch.
Thunderstorms. What is a thunderstorm? A thunderstorm is a storm with lightning and thunder. Lightning is a bright flash of electricity made by a thunderstorm.
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
Lesson 6 Voltage Do we need to MEASURE it? OR Do we need to DETECT it?
 LIGHTNING By: Aiden O’Connell. Lightning is formed when… Negative charges build their natural attraction to seek the ground for a positive charge, such.
Take 5 for Safety E. Lessard May 12, Arc Flash Event at INL Involving Situational Awareness Barrier  On April 15, 2015, Idaho National Lab workers.
FPSC Electric Utility Infrastructure Workshop Florida Municipal Electric Utilities Alan Shaffer Assistant General Manager - Delivery Lakeland Electric.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
1 Progress of, and prospects for, commercial applications of UHV 1100kV Transmission System in TEPCO 2 nd International Symposium on International Standards.
Lightning and Thunder Name Teacher
Frankfurt (Germany), 6-9 June 2011  Manfred Wurm  EVN Netz GmbH, Austria Wurm – Austria – Session 3 – 0915 EARTH FAULT DISTANCE LOCALIZATION IN INDUCTIVE.
Utility Engineers, PC.  Generation  Transmission  Distribution.
UNDERGROUND CABLE.
Submitted To:- Submitted By:- Mr.
Energy Coal, HSEC, September 2009 ICAM : Oil Circuit Breaker Explosion Incident date: Saturday 5 th September, 2009 Before After.
LIGHTENING PROTECTION USING LFA-M
Residential Wiring Unit 3 – Installation and Planning.
Grounding the Electrical System Reference: AAVIM “Electrical Wiring” Created May 2007.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
PREPARED BY: PREPARED BY: PRATIK PATEL DEEP SANGANI G H PATEL COLLEGE OF ENGINEERING AND TECHNOLOGY.
Electricity.  Aims – To understand the process of providing Electricity to buildings.  Objectives  To understand how Electricity is Generated.  To.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Design a protection System of 220/33kV Grid Station United Arab Emirates University College of Engineering Saif Mohammed AL Aryani Ahmed Soruor.
UNIT-5. ELECTRICAL SAFETY, WIRING & INTRODUCTION TO POWER SYSTEM
Ground Bond and Ground Continuity Testing
Comparison of AIS and GIS Grid Station Muhammad Ali Ashraf Management Associate (Electrical) CPP Project.
High Voltage Engineering
PROBLEM OF SPILL CURRENT WITH RESIDUALLY CONNECTED
A Lightning Talk Nigel Titley
Grounding the Electrical System
A SEMINAR ON LIGHTNING ARRESTER
AHMEDABAD INSTITUTE OF TECHNOLOGY
Circuit Protection Unit 9.
Electricity classroom
HIGH VOLTAGE ENGINEERING (HVE)
Grounding the Electrical System
GROUND-FAULT GROUND-CHECK MONITOR
Electrical Safety Equipment
Basics of electrical engineering
LIGHTNING.
Installation And Estimation of Service Connection
Components of Substation
It’s Electric – Static and Current Electricity
Use of Lightning Data for Electricity Transmission Operations
EET 323 – Electrical System Design Lecture 9: Grounding
Create a Plan - Next 90 Days
LIGHTNING AND INSULATIONS COORDINATION
Upgrading & Installing
Leadership starts here!
By LCdr NS Wickramasinghe BSc Hons (E & E Eng) MSc (HRM) AMIE (I) AMIE (SL) C Eng (I)
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Grounding Myths.
Presentation transcript:

NEWCASTLE MUNICIPALITY Safety at work Presented to AMEU Convention 15-17 October 2007 Presented by R.J. Mallinson 1/2/2019 Newcastle Municipality

Newcastle Municipality And here are the winners of the competition: SAFETY AT WORK 1/2/2019 Newcastle Municipality

Newcastle Municipality 10th place 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 9th place 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 8th place 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 7th place 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 6th place 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 5th place 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 4th place 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 3rd place 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 2nd place 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality And the WINNER is….. 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality Outside competition : „nec plus ultra“ 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality LENNOXTON SUBSTATION Lennoxton Substation 1/2/2019 Newcastle Municipality

Newcastle Municipality MAIN EARTHS STOLEN Stealing of copper - Lennoxton Substation main earth Ground closed up very neatly Fault occurred on 11 February 2007 Fault through NER – no earth Check flash through 120mm concrete Installation of cctv camera’s 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality CONCLUSION Do not accept that the earth is intact Have it tested more regularly – With the shortage of staff it becomes more difficult We had the earths tested every 5 years We decided to have it tested annually After installation of camera’s we can go back to every 5 years. 1/2/2019 Newcastle Municipality

Newcastle Municipality LENNOXTON NER FAULT After replacing all earth’s in February 2007 In May 2007 - Underground fault triggered a sequence of events Check flames appearing above ground Cables were 1,2 meter under ground Main problem – NER failed – This could have happened on 11 February 2007 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality CONCLUSION CHECK – CHECK - CHECK NER resistor failed Severity of fault high due to no earth path Possible reason it was not checked and tested after first fault Check the protection and protection circuits after every fault Installation of cctv camera’s helped reducing cable theft 1/2/2019 Newcastle Municipality

Newcastle Municipality LIGHTNING STRIKE On 17 April 2007 lightning struck one of our 132 KV substations Bushing exploded Oil and pieces of the insulator scattered 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality 1/2/2019 Newcastle Municipality

Newcastle Municipality CONCLUSION It some times happens that you have to do maintance on substations and overhead lines Thunder storms develop while still busy Do not let staff work in substations when lightning is around Do not let staff work on overhead lines when lightning is around 1/2/2019 Newcastle Municipality

Newcastle Municipality QUESTIONS ? 1/2/2019 Newcastle Municipality