Gas Field Development Class Example

Slides:



Advertisements
Similar presentations
Presentation to Repsol by MYS on 9/13/06 Well Completion Design for Tight-Gas Formations M. Y. Soliman, PhD September 20, 2006 Mendoza, Argentina.
Advertisements

Tight Gas Reservoirs Low Permeability Reservoirs The main contributor of unconventional gas in the US.
Well Testing Initial production tests at surface after wellbore cleanup and fracing. Sometimes called initial potential or IP. IP= Initial Production IPF.
1 Modelling Task 8 EBS Task Force Meeting 16, Lund, 28 November 2012 Dr. David Holton Dr. Steven Baxter
Pseudopressure Function
Case Study: Stratified Gas Hydrate Reservoir with Associated Free Gas Group Project PETE 680: Horizontal well Technology Presented By, Namit Jaiswal, Adejoke.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Calgary Petroleum Club – February 19, 2013 “Production Performance Unique Type Curve for Horizontal, Multi-Stage Frac'd Gas Wells: WHY, HOW and WHEN!”
Perforating Requirements for Fracture Stimulation
Base Case Simulation Model
Produced Water Reinjection Performance Joint Industry Project TerraTek, Inc. Triangle Engineering Taurus Reservoir Solutions (DE&S) E-first Technologies.
Theoretical study of skin effect on multilevel slug tests in highly permeable aquifer 指導教授 : 陳家洵 老師 報告者 : 謝頤祥 報告日期 :
Produced Water Reinjection Performance Joint Industry Project TerraTek, Inc. Triangle Engineering Taurus Reservoir Solutions (DE&S) E-first Technologies.
The aim of the lesson today is to: 1.. Surface Area to Volume Ratio.
CE 3354 Engineering Hydrology Lecture 21: Groundwater Hydrology Concepts – Part 1 1.
Nederlandse Aardolie Maatschappij BV1November 2012 Restricted Charge testing for well concept selection November 2012 Eelco Bakker, Al Zanimonsky, NAM.
PAWNEE RESERVOIR SIMULATION STUDY Pioneer Natural Resources Co. Performed By Gemini Solutions, Inc. January 2001.
GFZ experience in reservoir development. Operations at the site Groß Schönebeck  2000 reopening of a abbandoned gas well  2001 primary hydraulic test.
Drilling and Production
Chapter 2: Directional & Horizontal Drilling
From: Toughness-Dominated Hydraulic Fracture in Permeable Rocks
Recent Advances in Oil and Gas Production Engineering
Oil-Based Mud Contamination in Gas-Condensate Samples
SUBSEA GAS BOOSTING Jon Steinar Gudmundsson October 8, 2008
A probabilistic modelling approach to assessing the risks to groundwater contamination from hydraulic fracturing for a UK shale gas industry Olivia Milton-Thompson.
Gas Condensate PVT A worked example to estimate
Hydraulic Fracture Optimization Study
Gas Condensate PVT A worked example to estimate
Gas Condensate Rate Equation
تحليل الحساسية Sensitive Analysis.
Gas Condensate Blockage
Gas Condensate Rate Equation ”Pseudopressure Integral”
Flow in Channels and Fractures Analogies to Darcy’s Law
Flow in Channels and Fractures Analogies to Darcy’s Law
The material balance for simple depletion defines the relation between average reservoir pressure and cumulative gas produced. The straight-line MB assumes.
Gas Condensate Rate Equation ”Pseudopressure Integral”
Figure 19.6  Absolute temperatures at which various physical processes occur. Note that the scale is logarithmic. Fig. 19.6, p. 585.
Gas Condensate engineering  Dry Gas engineering except:
Gas Condensate Reservoirs
Introduction to Effective Permeability and Relative Permeability
Gas Stoichiometry.
Pressure drawdown to a gas condensate well
e-notes (c) Curtis H. Whitson
How do we use this information?
Flow in Channels and Fractures Analogies to Darcy’s Law
p = average reservoir pressure
p = average reservoir pressure
Flow in Channels and Fractures Analogies to Darcy’s Law
Pseudopressure Function
PPT Design on 3D models Landysh Minligalieva Reservoir Engineer
Gas Condensate Blockage
Gas Condensate Blockage
Caliper Logs What Do They Measure? How Do They Work?
Condensate blockage is the build-up of liquid around the wellbore, reducing the effective gas permeability and lowering well deliverability.  Condensate.
e-notes (c) Curtis H. Whitson
Gas field development involves the optimal selection of well number, well placement, well tubing size, and pipeline characteristics to deliver a specified.
Liquid saturation in CVD
Gas field development involves the optimal selection of well number, well placement, well tubing size, and pipeline characteristics to deliver a specified.
Operator Maersk Oil and Gas
e-notes (c) Curtis H. Whitson
Gas Condensate PVT A worked example to estimate
Gas Field Development Class Example
Gas Condensate Blockage
Fluid samples from gas condensate wells are needed for two main reasons: To provide PVT data for developing a fluid model such as an EOS and/or black-oil.
e-notes (c) Curtis H. Whitson
Liquid saturation in CVD
Gas Condensate Reservoirs
For the 1D governing equation used in the reservoir
New Exploration Gas Prospect
Presentation transcript:

Gas Field Development Class Example Use the spreadsheet Production-Forecasting.xls to look at sensitivities to reservoir parameters and tubing size. The spreadsheet contains data for a gas reservoir with IGIP = 8 Tscf (2.3 x 1011 m3). The model assumes that additional wells are drilled to maintain the plateau production rate. Assume a maximum of 50 wells. The development plan aims for a plateau period of 5 years, with 60% recovery at the end of plateau.

Gas Field Development Class Example Sensitivities to study (values in red give base case) Permeability 100 md 10 md 1 md Tubing size 7 inches 5 ½ inches 3 ½ inches Skin +5 (damage) -5 (hydraulic fracture) Aquifer size Aquifer volume ratio = 5 Aquifer volume ratio = 10 Aquifer volume ratio = 0 (no aquifer)

Gas Field Development Class Example Sensitivities to study Number of wells.* Length of plateau. Field life. Pressure drop in reservoir and tubing at start of production & end plateau. * For some cases (e.g. low permeability), it will not be possible to maintain the required plateau rate for 5 years. In these cases, find the maximum plateau rate that can be maintained for 5 years with a maximum of 50 wells.