2013 C&MS Pavements Specification Updates Craig Landefeld, P.E. Construction Pavements Engineer.

Slides:



Advertisements
Similar presentations
Signing Plan Design - At Grade Intersections Sample Plan Set
Advertisements

MATERIALS ACCEPTANCE. LPA Construction chapter -2 paragraphs on -Materials Quality Control -Materials Finalization -andAppendix J -LPA materials acceptance.
ODOT Structure Project Manager Seminar Specifications
Construction Materials
Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.
Estimating the Cost for the Concrete Pad
2013 C&MS Traffic & Roadway Spec Updates Office of Construction Administration Dan Groh.
S.P MnROAD Reconstruction Pre-Letting Conference April 8, 2011.
RMS R83 Edition 3 Rev 0 ASCP Forum 24 Feb 2014 TSM CIVIL.
Workshop on Specifications and Producer QC – Ken Day I shall start by spending a few minutes describing some provisions of the Australian Code before inviting.
By: Rick Roth. “High Early” Concrete is concrete that reaches its strength earlier then 28days! Any PSI concrete can be made to be High Early.
Using CFB Ash As A Substitute For Portland Cement In Full Depth Reclamation Presented By Steve Dixon, Civil & Environmental Consultants, Inc. Jim Panaro,
Concrete Specification and Roadway Standard Revisions Bill Miller, PE Bureau of Construction and Materials Mark Burkhead, PE Bureau.
Portland Cement and Concrete
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Module 4-2 : Joint Sealing
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
Chapter 6 Chip Seals From… Maintenance Technical Advisory Guide (MTAG)
PAVEMENT REHABILITATION
Specification Changes Pub 408/2011 Changes 1 & 2 District 8-0 Winter Construction School February 23rd, 2012 Linda Atkinson Bureau.
Amendments to the Specifications Discussion of Changes to the Concrete Materials Specifications.
PRESENTATION TO 34 TH ANNUAL AIRPORTS CONFERENCE 3/02/11 By: Casimir J. Bognacki, PE, FACI Chief of Materials Engineering.
CONCRETE MIX-DESIGN ACI
Chapter 3. Obtaining Silica-Fume Concrete  Specifying Silica Fume and SFC  Proportioning SFC  Producing SFC.
2015 Winter School Structures Heidi A. Mertz, P.E. District 8-0 Structure Control Engineer.
Performance Engineered Concrete Mixtures
BEARING OR CRUSHING Bearing Stresses (Compression Perpendicular to the Grain) Allowable stresses for compression perpendicular to the grain are available.
Prepared by Marcia C. Belcher Construction Engineering Technology
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
VOLUMETRIC MIXED CONCRETE MOBILE VOLUMETRIC MIXERS.
Mix Design Review.
Asphalt Quality Assurance Program
Quality Control Testing
2002 FDOT/FTBA Construction Conference
03-0F2204 Sly Park Road UC (Replace) Prebid Outreach Meeting: CIP Structural Concrete Materials Specification Overview John Yang, P.E. Office of Structural.
Severud Associates Consulting Engineers PC Museum of the American Indian Washington, D.C. Yale University Ingalls Hockey Rink New Haven, CT Eventi Hotel.
Topic : MIX DESIGN OF CONCRETE Properties of concrete Submitted To: DR. AYUB ELAHI Submitted By: SOHAIB NASEER 2K9-scet-29/CIVIL M.ZAEEM FAKHAR 2K9-scet-03/CIVIL.
NOTE: When UPGRADE MIX DESIGN or MATERIAL CHANGE TO JMF is selected, the RELATED JMF cell appears in yellow. Enter the approved JMF # for.
SPECIFICATIONS UPDATE KELLY MANNERING DelDOT QUALITY CONTROL (302)
READYMIX INDUSTRY There are two main components in asphalt concrete: 1) the asphalt cement, or glue, and 2) the aggregates.
Placing Quality Concrete
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Update on End Result Specifications Celik Ozyildirim, Ph.D., P.E.
Developing a Mixture-Based Specification for Flexible Base.
The Cathedral of Our Lady of the Angels. Los Angeles, California Rafael Moneo.
ACI Concrete Mix Design
The P2P Initiative – Focus on Innovation and Quality © National Ready Mixed Concrete Association All rights reserved.
JUST IN TIME MIXTURE PROPORTIONING Ken W. Day Consultant, Australia.
Concrete Technology Ch8: Proportioning Concrete Mixes Lecture 14 Eng: Eyad Haddad.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
Concrete Field Sampling
Necessary Information Required compressive strength at 28days: 30 Mpa Type of structure: mass concrete, beam, column. Maximum size of aggregate: 20 mm.
Concrete Mix Design ACI Variation 5% Variation for Adjusting Mixes n Determine what is to be added or reduced n If it is sand, stone, or cement compute.
Project Materials Usage and Concerns. Project Materials and Acceptance QC/QA Specifications QC/QA Specifications Quality Control Plans Quality Control.
Jerry L. Larson IRMCA Indiana LTAP Basics of a Good Road
CEMENT CONCRETE MIX DESIGN
SPECIFICATIONS Ryan Johnson Specification Engineer
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
CVL 2407 Faculty of Applied Engineering and Urban Planning Civil Engineering Department 2 nd Semester 2013/2014 Dr. Eng. Mustafa Maher Al-tayeb.
Concrete Mix Design Calculations
Estimating the Cost of a Concrete Pad & Rebar (Revised: )
Navigating FDOT Specifications and Standards
Concrete Mix Design Calculations
Raw Materials For Precast Concete Pipe and Box Culverts
Concrete Mix Design Calculations
2018 Revisions to NYCDOB Code
Concrete Mix Design Calculations
Designing and Proportioning Normal Concrete Mixtures
Cement Concrete Mix Design and Quality Control
Fiber Reinforced Polymer Systems
Presentation transcript:

2013 C&MS Pavements Specification Updates Craig Landefeld, P.E. Construction Pavements Engineer

Major Changes – Concrete General a)255 – Full Depth Removal and Rigid Replacement b)451 – Reinforced Portland Cement Concrete Pavement c)452 – Non-Reinforced Portland Cement Concrete Pavement d)455 – Quality Control Plan (QCP), Testing and Assurance… e)608 – Walks, Curb Ramps, and Steps f)609 – Curbing, Concrete Medians, and Traffic Islands – Removal of Structures – Partial Depth Pavement Repair – Rubblize and Roll – Crack Sealing – Roads and Pavements for Maintaining Traffic

499 - Concrete General What drove the 499 specification changes? – Experience with quality products from QC/QA – Bridge deck evaluation research of 2008/2009

Specification Changes

What drove specification changes? – Experience with quality products from QC/QA – Bridge deck evaluation research of 2008/2009 – ODOT inspection staff – Opportunity to use industry expertise – Best practices from other states Only 1 reported state from 34 responding has prescription mixes. Texas Pavement example:

Specification Changes

Concrete General 499 Specifications changes A new mix table Incorporates seven mix classes

Quantities per Cubic Yard - Provide Concrete with 6±2% Air Content Class Design Strength (psi) Permeability [1] Maximum (Coulombs) Cementitious Content [2] Minimum. (lbs) Aggregate Requirements QC 14,000 at 28 days2,000520Well-Graded QC 24,500 at 28 days1,500520Well-Graded QC 3 Special As per plan 1,500 or as per plan 520 or as per planWell-Graded QC 4 Mass Concrete As per plan [3] 2,000 or as per plan 470 [4] [5] or as per plan Well-Graded QC MS [7] See Supplement 1126 N/A800 [7] 1 inch nominal max size QC FS [7] See Supplement 1126 N/A900 [7] 1 inch nominal max size QC Misc [6] 4,000 at 28 days 550 [7] 1 inch nominal max size [1] AASHTO T277 Modified [2] Cementitious Content includes cement and pozzolan materials, denoted as Cm [3] Strength for Mass Concrete (QC 4) may be tested at either 28 or 56 days. [4] Do not use Type III cement or accelerating admixtures in mass concrete. [5] The maximum fly ash or GGBF slag content may be increased up to 50%. [6] For QC Misc mixes only –Water/Cementitious ratio limited to 0.50 maximum [7] Cement Only – No pozzolan materials 499 Specification Changes

Specification Changes Supplier owns the mix design for ALL QC mixes Adjustments greater than 100 lbs. require Engineer approval. Supplier must maintain gradation in Zone II of the Coarseness Factor Chart.

Specification Changes

Supplier owns the mix design for ALL QC mixes Adjustments greater than 100 lbs. require Engineer approval. Supplier must maintain gradation in Zone II of the Coarseness Factor Chart. Temperature increase to ACI 95 F. Partial hand written batch tickets not an option

2013 – Concrete Pavement Specification Changes Seven Major Specifications were revised or created 499 Concrete - General o Prescription mixes Class F, C, S, HP, MS, FS are gone o Well graded aggregate requirements for both 451/452 and /452 Concrete Pavement o Revisions to adopt SS 888 ODOT QC/QA pavement concrete specifications 455 Quality Control Plan, Testing QC/QA Concrete o Incorporates concrete quality control specifications for 511 and 451/452 into one document Supplements 1126/1127 o S1126 Mix design submittal for JMF o S1127 New Pay factor criteria for 451, 452 and 511 Three other pavement specifications were updated to reflect material changes 255 Full Depth Removal with Rigid Replacement o RRCM - special mix design for rapid repair concrete was added. 608 Walks, Curb Ramps, and Steps 609 Curbing, Concrete Medians, and Traffic Islands

Specification Changes Materials section was updated to reflect the modifications to 499. References to 455 Quality Control Plan, Testing QC/QA Concrete Basis of Payment was modified to include with QC/QA or without. Longitudinal tining is now default. Transverse tining only allowed in small areas approved by Engineer. MIT Scan-2 Equipment is required for DBI paving /S1127 Strength Pay Factors

2013 – with QC/QA or without? Without QC/QA Contractor performs QC to meet CMS 499. ODOT Perform QC checks on project for compliance with CMS 499 (slump, air, yield). Beam for every 7500yd 2 or fraction thereof daily by ODOT. Supplier/Contractor responsible to assure your well graded aggregates are maintained in Zone II. Core for every 2000yd 2 by contractor per S1064. With QC/QA CMS 455 governs QC/QA in addition to CMS 499

455 Quality Control Requirements Incorporates concrete quality control specifications from SS 888 and SS 898 for 511 and 451/452 into one document Only when with QC/QA is specified in the bid item. o – generally over 10,000 Sq Yd Sets minimum requirements for Contractors Quality Control Plan (QCP). Project Engineer must review and approve QCP and can require changes. Sets the Quality Assurance testing requirements for the ODOT Project Staff. o Side by side air content – 10% of QC Samples o QA strength core for 1 in 10 QC Strength Cores

Supplement 1126 / 1127 S Developing and Submitting a Portland Cement Concrete Mix Design for Acceptance New supplement for Suppliers submission for JMF. S Pay Factors Determination for Pavement and Structure Concrete Provides direction for pay factor determination and example calculations.

202 – Steps Removed can be Lump or Foot o Measure along the front edge of each tread. Include the width of an integral wall in the width measurement. 251 – Partial Depth Pavement Repair o Partial Depth repairs can now be paid for by the Square Yard or Cubic Yard.

320 – Rubblize and Roll Spec only applies to Reinforced Concrete Pavements. Construction test pit requirements are redefined. Particle size control has been adjusted.

423 – Crack Sealing, Hot applied All items can now be paid for in Square Yards (Square Meters), in addition to Pounds (Kilograms).

615 - Roads and Pavements for Maintaining Traffic Section Description work has been revised to include the removal of appurtenances. For rigid pavements, deleted the use of Class C concrete and replaced it with Concrete, Class QC 1. Section Basis of Payment: Roads for Maintaining Traffic will include the installation, maintenance, and removal of all fencing, earthwork, guardrail, sidewalk, and all other items as necessary to provide a complete, functional, and safe installation.

ODOT Pavements Specification Changes 2013 CMS Questions??