Out-Processing Transmittals

Slides:



Advertisements
Similar presentations
Creating Your Bibliography Setting a Hanging Indent.
Advertisements

How to sign documents using your PIV Card. Important Tip: Before you open the Adobe Program, ensure your PIV Card is inserted.
WebHopper, Student Timesheets, and You Students use WebHopper to submit timesheets electronically for approval. Supervisors will use WebHopper to approve.
Insurance or Contract Codes This module is for building new insurance or contract codes, or changing existing codes.
How to Efile a Lobbyist Expenditure Report 01/1/2014.
MANDATORY for all P1 students to complete by August 4, 2014 Admission Background Check Kroll Background Check Process On July 21, 2014, you will receive.
Peirsonpatterson,llp eDisclosure Solution ppdocs.com.
Reference Guide Module 5: Billing November 2014 Reference Guide Module 5: Billing November 2014.
Logging into ITAMS as a Student or Hourly Employee To Login to ITAMS for the first time: Open your web browser. Click File, Open, and type the following.
Cisco Confidential 1 © Cisco and/or its affiliates. All rights reserved. Last Updated: April 2014 Instructions for Navigating in the Training.
PROACTIS: Supplier User Guide Contract Management.
Welcome to the Electronic Permit Submittal and Processing System (EPSAP) Professional Engineer Submittal Instructions.
MPA Online Entering Solos, Ensembles, and Bands. The first step is to log into MPA Online at: You will need.
Welcome to Keyboarding Pro DELUXE ® Get Started Get Started Create Your Student Record Create Your Student Record The Main Menu The Main Menu Send Files.
Qualifications Portal Guide Personal Development and Employability Qualification.
Outlook Workflow Process Director Approval IRB Submittal Outlook VP Approval Finance Approval 5 IRB Final Approval.
First Look Program for Non Profit Buyers Tutorial.
How to Electronically Sign your Protocol on the eIRB IRB Office Building 1- Room 229 Version: January 28, 2015.
0 Electronic Subcontracting Reporting System (eSRS) Department of Defense Government Training Submitting a SSR – Individual Plan.
Emdeon Office Batch Management Services This document provides detailed information on Batch Import Services and other Batch features.
Installing RMS 3.0 Contractor Mode
SCC P2P – Collaboration Made Easy Contract Management training
Creating a new Central Data Exchange (CDX) Account (to access NetDMR)
Creating and Using Your FSA ID: An Overview
Hiring Manager onboarding
Welcome to the Electronic Permit Submittal and Processing System (EPSAP) Professional Engineer Submittal Instructions.
Contractor Mode Administration Tab Overview
Creating and Using Your FSA ID: An Overview
Creating opportunities by investing in our future
Customer Online Ordering
Ariba Contracts: Initiate eSignature
(Quality Chapter) application
UIT Remark Exam Grading Instructions University Information Technology
First Look Program for Non Profit Buyers
Signing a Pay Estimate RMS 3.0 Government Mode.
New Mexico Emergency Operations Center (NMEOC) Basic ETeam Training
Reliance Supplier Corrective Action Process
Entering an Option Modification
Receiving Transmittals from Contractors
Receiving a Payment RMS 3.0 Government Mode.
Transmittal Review RMS 3.0.
Creating a new Central Data Exchange (CDX) Account (to access NetDMR)
Signing QAR Daily Reports
Adding Submittal Reviewers
Creating a Non-DOD CAC Account for RMS 3.0
Entering Test Results for QC Requirements Contractor Mode
Creating a Manually- Entered Pay Estimate
Updating Status Photos
Updating the System Milestones
UIT Remark Exam Grading Instructions University Information Technology
NOTE TO PRESENTER This presentation provides information on the FSA ID that can be used in outreach to students and parents. The presentation was created.
Updating Phase Status Issues
Granting support access for individuals to contracts
Supervisor completes Dept. Goals/Employee completes Self-Evaluation
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Proxies Granting proxy authorization enables another provider to access your Inbox Documents and handle them for you. Your proxy can review, sign, refuse,
Signing Documents Documents that require your review or signature are displayed in the Inbox Summary. Notifications that require your signature include.
Student Introduction to CORE ELMS
Contract Status Report
Access your coordinator account
Creating a Transmittal
Setting Up a New Contract
Step 2. Bookkeeper runs Report 121 (Cardholder Statement) in Pathway Net and reconciles receipts to the report The following slides are instructions on.
Importing Transmittals Using the Excel Spreadsheet Template
After LDG SAR Approval, you should use the following URL to access the DAAS portal and click on LDG to access Project Code Reports.
EMPLOYEE ACTION MANUAL FOR MANAGERS
Creating and Sending Saved Messages
TECHNICAL EVALUATION.
Interim Scoring Support
The process can take up to 2 weeks
Presentation transcript:

Out-Processing Transmittals Government Mode RMS 3.0

Note: The following slides is the new way to out-process transmittals Note: The following slides is the new way to out-process transmittals. This process will only work for transmittals the contractor has submitted after Patch 158 and if the contractor has completed the 4025 in RMS 3.0. If the contractor dragged and dropped the 4025 into RMS 3.0 this process will not work.

From the main contract menu, select “Submittals”.

Select “Transmittal Log”.

Highlight the transmittal that is getting prepped for signature and either double click or click “Edit”.

Note: The contractor’s document package has to have a status of “In Review”. Enter in the recommended code if the reviewer has not entered it.

Send a message to the ACO/COR that the submittal is ready for signature.

The code will not appear on the 4025 until after the transmittal has been signed.

Once the 4025 is electronically signed, the code will appear.

Once the date is entered into “Date Sent to Contractor”, RMS will create a separate document package that will contain the remarks. This package will need to be completed.