Project Management Time-Cost Model Tutorial

Slides:



Advertisements
Similar presentations
WOOD 492 MODELLING FOR DECISION SUPPORT
Advertisements

Chapter 3 Project Management.
Chapter 7 Schedule Control
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
WOOD 492 MODELLING FOR DECISION SUPPORT Lecture 22 Network Problems.
OPSM 301 Operations Management Class 27: Project Management: project crashing Koç University Zeynep Aksin
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
Project Scheduling: Networks, Duration estimation, and Critical Path.
1 7.1 Introduction A project is a collection of tasks that must be completed in minimum time or at minimal cost. Tasks are called “activities.” –Estimated.
PERT/CPM Models for Project Management
Chapter 9: Reducing Project Duration
Chapter 7 Networks and Scheduling Project Management for Business, Engineering, and Technology.
Reducing Project Duration
Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening) 4/17/ :55 AM.
D1: Scheduling. Scheduling is normally the final part of a D1 question on critical path analysis. It involves finding out how many workers are needed.
OPER 576 Project Management Reducing Project Duration or Project Crashing Greg Magnan, Ph.D. May 20, 2004.
Project Management CPM, PERT, Crashing – An Illustrative Example
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Analyzing Cost-Time Trade-Offs There are always cost-time trade-offs in project management. – You can completing a project early by hiring more workers.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
Real-World Project Management Chapter 13. Characteristics of Project Management Unique one-time focus –Difficulties arise from originality Subject to.
ECCS5209 Project Planning & Control Faculty of Applied Engineering and Urban Planning Civil Engineering Department Example 2 nd Semester 2010/2011 Eng:
Chapter 9: Reducing Project Duration
Module 5 – Networks and Decision Mathematics Chapter 23 – Undirected Graphs.
Network techniques for Project Management
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
ENGM 631 Optimization Ch. 10: PERT/CPM. Great Pyriamid of Cheops (2,500 B.C.) 42,300,000 Stone Blocks 440 Stories 4Accuracy of 0.04 inch 413 acres level.
Chapter 7 Schedule Control. 22 Learning Objectives  Perform the steps in the project control process  Determine the effects of actual schedule performance.
Time-Cost Trade-off Models
Project Management 6e..
Reducing Project Duration
Project Management.
Network Diagram Prob 1 Activity Predecessor Duration (days) A None 2 B
Project Management Chapter Topics
UNIT II Scheduling Procedures & Techniques FLOAT
Project Management: PERT/CPM
Single-Source Shortest Path
PERT and CPM.
Class 27: Project Management Part II
Basic Project Scheduling
Basic Project Scheduling
Chapter 8 - Project Management
Projects: Critical Paths
Planar Graphs & Euler’s Formula
PROJECT MANAGEMENT WITH CPM/PERT.
Project Management CPM Method Tutorial-p2
Decision making and Organization Management
Manufacturing Systems MRP Tutorial 2
Dr. Ron Lembke Operations Management
Project Management Planning Models
Critical Path Analysis
Chapter 3 Project Management.
Process and Capacity Analysis Capacity Analysis Tutorial
Project Management CPM Method Tutorial-p1
Solution to Problem 2 Developed by: Alex J. Ruiz-Torres, Ph.D.
Project Scheduling: Lagging, Crashing and Activity Networks
Solution to Problem 1 Developed by: Alex J. Ruiz-Torres, Ph.D.
Örnek-2Örnek-2 2 FinishFinish StartStart CG B 10 D 35 H J E 24 I 15 A F K ABCDEFGHIJKABCDEFGHIJK — — A B B A C D A E,G,H F,I,J Immediate.
Critical Path Method Farrokh Alemi, Ph.D.
Analysing the AoA network
ELC 347 project management
Analysing the AoA network
University of Debrecen Mongolian University of Life Sciences
PERT/Activity Diagrams, Completion Probability and the Z Score
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Presentation transcript:

Project Management Time-Cost Model Tutorial Objectives and Information Step 1. Normal duration and cost Step 2. What to crash Step 3. Crash the activity Step 3. Repeat Step 4. The all crash duration and cost Step 5. The tradeoff graph Developed by: Alex J. Ruiz-Torres, Ph.D.

Objectives and Information

Objectives and Information The goal of this process is the development of alternative project plans. Each project plan has a different cost and duration. As the project duration is reduced the cost increases. The idea is similar to the options for shipping via UPS,.. 5 days costs $10, 3 days $16, 2 days costs $22, and overnight $40.

Objectives and Information The project information that must be already defined: Set of activities and precedence relationships. Activity duration when its performed at its “normal” speed. Called the Normal Time (NT) Shortest possible duration. Called the Crash Time (CT) Activity cost when performed at its normal speed. Called the Normal Cost (NC) Activity cost when performed at its shortest duration. Called the Crash Cost (CC)

Objectives and Information EXAMPLE   Months Millions $ CT NT NC CC Pred a 2 4 8 18 b 3 5 13 c 9.1 d 7 6 8.5 b,c e 14 f 1 d,e

Step 1. Normal Duration and Cost

Step 1. Normal Duration and Cost We start by considering all activities are performed at their normal time. No activity is being expedited/ crashed.   Months Millions $ CT NT NC CC Pred a 2 4 8 18 b 3 5 13 c 9.1 d 7 6 8.5 b,c e 14 f 1 d,e

Step 1. Normal Duration and Cost   CT NT NC CC Pred a 2 4 8 18 b 3 5 13 c 9.1 d 7 6 8.5 b,c e 14 f 1 d,e We determine the duration and CP for the project with all NT’s 4 9 9 17 0 4 b d 17 20 a f c e Duration = 20 Months CP = a – b – d – f 9 15 11 17 4 8 5 9

Step 1. Normal Duration and Cost   CT NT NC CC Pred a 2 4 8 18 b 3 5 13 c 9.1 d 7 6 8.5 b,c e 14 f 1 d,e 4 9 9 17 0 4 b d 17 20 a f Given all activities are at their NT, the total cost is the sum of Normal Costs = $36 Million c e 9 15 11 17 4 8 5 9

Step 1. Normal Duration and Cost Normal Case Current Duration = 20 Months Current Costs = $36 Million

Step 2. What to Crash?

Step 2. What to Crash? Objective: to determine what activity to crash in order to reduce the project’s duration. This is done one time unit at a time. In this example, one month at a time. For each activity we calculate the crash rate CR = (CC – NC) / (NT – CT) The crash rate is the cost to reduce that activity by one time unit For this example = $million/reduce one month

Step 2. What to Crash? crash rate CR = (CC – NC) / (NT – CT) Months   Months Millions $ $M/mo. CT NT NC CC Rate Pred a 2 4 8 18 5 b 3 13 c 9.1 1.1 d 7 6 8.5 2.5 b,c e 14 3.5 f 1 d,e

Step 2. What to Crash?   mo.  mo. $M $M  $M/mo. CT NT NC CC Rate Pred a 2 4 8 18 5 b 3 13 c 9.1 1.1 d 7 6 8.5 2.5 b,c e 14 3.5 f 1 d,e Activity c has the smallest rate (therefore smallest cost increase), BUT This activity is not in the CP. Therefore reducing the time of activity c will not reduce the project’s duration

Step 2. What to Crash? b d a f c e If the duration of activity c is three months (instead of 4 as the original ), the project still takes 20 months 4 9 9 17 0 4 b d 17 20 a f c e 9 15 11 17 4 7 6 9 new duration = 3

Step 2. What to Crash? We will crash the activity in the CP with the smallest rate. Activity d. CP = a – b – d – f SMALLEST   mo.  mo. $M $M  $M/mo. CT NT NC CC Rate Pred a 2 4 8 18 5 b 3 13 c 9.1 1.1 d 7 6 8.5 2.5 b,c e 14 3.5 f 1 d,e

Step 3. Crash the activity

Step 3. Crash the activity The duration of Activity d is reduced by one time unit duration = 7 months (instead of 8) We will next determine the project’s completion time.

Step 3. Crash the activity   CT NT NC CC Pred a 2 4 8 18 b 3 5 13 c 9.1 d 7 6 8.5 b,c e 14 f 1 d,e We calculate the completion time and critical path with d = 7 9 9 16 new duration = 7 0 4 b d 19 a f Duration = 19 Months Thus crashing d by one time unit reduced the project by one time unit. c e 15 8

Step 3. Crash the activity When expediting activity d by one month the project cost increases by the crash rate for that activity Therefore the project cost at 19 months is $38.5 Million (36 + 2.5)

Step 4. Repeat This means steps 2 – 3 will be repeated X times or until no alternatives are available. Back to step 2. What to crash?

Step 2. What to Crash? b d a f c e CP = a – b – d – f (The CP did not   CT NT NC CC Pred a 2 4 8 18 b 3 5 13 c 9.1 d 7 6 8.5 b,c e 14 f 1 d,e We need to determine the critical path 4 9 9 16 0 4 b d 16 19 a f c e CP = a – b – d – f (The CP did not CHANGE) 9 15 10 16 4 8 5 9

Step 2. What to Crash? The critical path is CP = a – b – d – f d cannot be crashed again. Is at its minimum possible duration (already at 7 months). The CT is the smallest possible duration.. Next smallest is b. available LOWEST   mo.  mo. $M $M  $M/mo. CT NT NC CC Rate Pred a 2 4 8 18 5 b 3 13 c 9.1 1.1 d 7 6 8.5 2.5 b,c e 14 3.5 f 1 d,e

Step 3. Crash the activity   CT NT NC CC Pred a 2 4 8 18 b 3 5 13 c 9.1 d 7 6 8.5 b,c e 14 f 1 d,e We calculate the project’s duration with b = 4 months 4 8 8 15 0 4 b d 15 18 a f c e Duration = 18 Months 8 14 8

Step 3. Crash the activity Activity b had a crash rate of 4 Reducing the time of an activity increases the cost of the project by its crash rate. Project cost at 18 Months is 38.5 + 4 = $42.5 Million

Step 4. Repeat Back to step 2. What to crash?

Step 2. What to Crash? b d a f c e We determine the critical path   CT NT NC CC Pred a 2 4 8 18 b 3 5 13 c 9.1 d 7 6 8.5 b,c e 14 f 1 d,e We determine the critical path 4 8 8 15 all activities but e have 0 slack 0 4 b d 15 18 a f Duration = 18 Months CP = a – b – d – f CP = a – c – d – f (we now have 2 CPs) c e 8 14 9 15 4 8

Step 2. What to Crash? We now have 2 CPs CP = a – b – d – f CP = a – c – d – f To reduce the project to 17 months we could do one of the following Crash a Crash both b and c Crash f Lowest cost = a   $M/mo. Rate Pred a 5 b 4 c 1.1 d 2.5 b,c e 3.5 f 6 d,e

Step 2. What to Crash? b d a f c e Why not just c? If we only crashed c, the project’s completion time would not be reduced. Same if we only crashed b. They are in parallel, so both must be reduced simulateneosly to change the project’s completion time. 4 8 8 15 0 4 b d 15 18 a f CP = a – b – d – f CP = a – c – d – f c e 8 14 9 15 4 7 5 8 29

Step 3. Crash the activity Activity a is selected. Now has a duration of 3 months. 3 7 7 14 0 3 b d 14 17 a f c e Duration = 17 Months 7 13 3 7 30

Step 3. Crash the activity Activity a had a crash rate of 5 Reducing the time of an activity increases the cost of the project by its crash rate. Project cost at 17 Months is 42.5 + 5 = $47.5 Million Step 4.We will stop here, X times = 3 times

Step 5. The all crash duration and cost

Step 5. The all crash duration and cost   CT NT NC CC Pred a 2 4 8 18 b 3 5 13 c 9.1 d 7 6 8.5 b,c e 14 f 1 d,e We calculate the completion time and critical path with all durations at crash time 2 5 5 12 0 2 b d 12 13 a f c e Duration = 13 Months 5 9 8 12 2 5

Step 5. The all crash duration and cost   CT NT NC CC Pred a 2 4 8 18 b 3 5 13 c 9.1 d 7 6 8.5 b,c e 14 f 1 d,e As we assumed all the activities are crashed to their maximum, the project’s cost is the sum all the crash costs. Project Cost = $76.6 Million. This is a rough estimate. For example, activity e can be un-crashed back to 6 months and the project would still have a duration of 13 months.

Step 6. The Tradeoff Plot

Step 6. The Tradeoff Plot Alternatives Generated Duration Cost 20 36 19 38.5 18 42.5 17 47.5 13 76.6 Alternatives Generated