ON THE HIGH GRADIENT Nb CAVITIES

Slides:



Advertisements
Similar presentations
T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
Advertisements

| PAGE 1 LCWS14 October 7 th 2014 CEA EXPERTISE WITH VERTICAL ELECTROPOLISHING (VEP) F. Eozénou.
Series Tests of High Gradient Single- cell Superconducting Cavity for the Establishment of KEK Recipe T. Saeki (1), F. Furuta (1), K. Saito (1), M. Ge.
Shekhar Mishra, Fermilab Mark J. Oreglia, Univ. of Chicago
CEA DSM Irfu May 28th A RD 05: SURFACE PREPARATION STUDIES FOR SUPERCONDUCTIVE CAVITIES F. Eozénou, T. Saeki - F. Eozenou / T. Saeki - A_RD_05.
Rong-Li Geng Jefferson Lab High Efficiency High Gradient Cavities - Toward Cutting Down ILC Dynamic Heat Load by Factor of Four R.L. Geng, ALCW2015,
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
Industrialization of Electropolishing (EP) D.Proch, DESY EP is the preferred cleaning method for superconducting Nb resonators (besides Buffered Chemical.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
1Claire AntoineCEA/Saclay - Fermilab (Innovative) Processing of materials SRF materials Workshop Fermilab May 23-24, 2007 Today’s process is long, complex,
Experimental Comparison at KEK of High Gradient Performance of Different Single Cell Superconducting Cavity Designs. F. Furuta, K. Saito, T. Saeki, H.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
CAVITY TREATMENT (BCP, HEAT TREATMENT & HPR) Sergio Calatroni with many contributions from: Rama Calaga, Leonel Ferreira, Antonio Mongelluzzo LHC CCEM,
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
TTC Meeting, Frascati, 5-7 December Summary of EP discussions at Oct SMTF meeting at FNAL T. Tajima (LANL), C. Boffo (FNAL)
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Rongli Geng March 4, th LCC ILC Cavity Group Meeting
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Lutz Lilje DESY -MPY- Summary of the Superconducting RF WG DESY -MPY Overview on talks given List European Assets.
Current study status of high gradient at KEK Fumio Furuta KEK SCRF meeting Fermilab. Apr
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
Standard EP recipe at KEK T. Saeki KEK Hot topics session SRF – 29 July 2011, Chicago.
Hydroformed Multi-Cell Cavities. Update Waldemar Singer, DESY Peter Kneisel, JLab.
Centrifugal Barrel Polishing at Fermilab (Tuesday, December 6th at 10:20) Tesla Technology Collaboration IHEP, Beijing December 5 th -8 th, 2011.
Annual Meeting CERN - November 2005 Bernard V ISENTIN.
CEA DSM Irfu 11/06/2016- F. Eozénou - TTC Meeting 2012 JLab WG21 Experience with Vertical Electro-Polishing at CEA Saclay Comparison with Horizontal EP.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
JRA1 Meeting CEA Saclay Electropolishing in Saclay Status 2005.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
CEA DSM Irfu 16/05/2008- F. Eozénou, T. Saeki - FJPPL 2009 A_RD_051 A RD 05: SURFACE PREPARATION STUDIES FOR SUPERCONDUCTIVE CAVITIES F. Eozénou, T. Saeki.
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
ILC SRF meeting 11/05/06 EP Facilities Studies & related R&D Cristian Boffo-Claire Antoine-Charlie Cooper ILC SRF meeting 11/05/06.
Summary of STF-EP facility at KEK.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Vertical Electro-Polishing activities at CEA Saclay
Motivation Vertical Electro-Polishing for high gradient cavity R&D.
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
Condition of electron beam welding toward a high gradient application
DESY Experiences on Use of Gas overlay during Assemblies
New Cavity Techniques and Future Prospects
Vertical Electropolishing at Marui & KEK
JLab infusion and LG flux expulsion update
Ashwini Chandra M.D. Sumption, E.W. Collings G.S. Frankel
for the FNAL/ANL, JLab, and Cornell cavity teams
Peng Sha Institute of High Energy Physics, CAS
Surface Analysis of the Quench Area Sample of Cavity Z111
High Q via N infusion R&D at Jefferson Lab
Some History of Electropolishing of Niobium 1970 – 1990
Effort Torwards Improving Large Scale Production for SC Cavities
A COMMON R&D ON THE HIGH GRADIENT Nb CAVITIES
High Gradient Cavities
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Working Group 3 Summary TTC Meeting INFN Milan,March 3, 2011
Quality control study with single-cell cavities
Proposal for an International Single Cell Cavity R&D Plan for Electropolishing Development P. Kneisel JLab Sept. 25 – 28, 2006 TTC meeting at KEK.
Highlights from EU Global Design Effort
TTC topical-meeting on CW SRF 2013
N-infusion, Vertical-EP, and ILC cost reduction efforts at Cornell
SRF Surface Studies and the High Field Q-slope Mystery
FOR SUPERCONDUCTIVE CAVITIES
Vertical Test Results of 9-Cell Cavities for LCLS-II
SRF Science and Technology
JLab Work on Low Temperature Near-Surface Diffusion aka “Infusion”
Presentation transcript:

ON THE HIGH GRADIENT Nb CAVITIES A COMMON R&D ON THE HIGH GRADIENT Nb CAVITIES Kenji Saito Takayuki Saeki Yasuo Higashi Fumio Furuta Bernard Visentin Fabien Eozénou Mélanie Bruchon 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

R&D ON HIGH GRADIENT Nb CAVITIES A CRUCIAL R&D ON HIGH GRADIENT Nb CAVITIES 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

TWO MAIN ROJECTS RELATED TO THE “COLD” TECHNOLOGY International Linear Collider ~17000 Superconductive Nb cavities > 31.5 MV/m 1 Tev XFEL (X-Ray Free-Electron Laser) 17.5 GeV λ=0.1nm 808 cavities E=23.5 MV/m assembled in 101 cryomodules 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

Electro-Polishing (EP) And Baking: Reminder ‘Standard’ preparation to reach high gradients: Barrel Polishing + EP + Anneal + Final EP + HPR + Rinse + Baking Electro-Polishing: Internal Surface Treatment of the Cavity filled with acid in presence of Current Standard Baking: Cavity is baked under vacuum to remove high field Q-Slope whose origin remains mysterious ‘Standard’ parameters: 120°C: 48h 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

Electro-Polishing (EP): More details Process - Nb polished internally with an electrolyte (concentrated H2SO4 - HF mixture) under voltage - Cavity = Anode & Cathode is an Al pipe inside the cavity Chemical reactions - Anode: Niobium oxidation 2 Nb + 5 H2O  Nb2O5 + 10 H+ + 10 e- - Cathode: H2 generation 2 H+ + 2 e-  H2 (Teflon net to prevent H contamination) - HF: dissolution of oxide Nb2O5 layer - H2SO4: forming of a viscous layer 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

Electro-Polishing (EP) and Baking: Main Breakthroughs Nb Cavity Performances ( 1991 - 1999 ) Continuous improvements with Heat Treatments @ 800 and 1400°C, High Pressure Rinse, Baking & ElectroPolishing. 42 MV/m hard barrier (  2004 ) 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

GOALS OF THE COMMON R&D PROGRAM Improvement of the Baking Procedure: Facilitate the baking procedure Decrease the baking time Improvement of Electro-Polishing: Obtaining of high reproducible gradients Better understanding of the process (use of modelling) 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

IMPROVING THE BAKING PARAMETERS 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

FAST ARGON BAKING B.Visentin Use of Argon Instead of high Vacuum IR baking system in Clean Room at Saclay. Use of Argon Instead of high Vacuum 120°C 48h 145°C 3h In terms of Oxygen diffusion in the bulk niobium 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

BAKING RESULTS ON ICHIRO CAVITIES “Ichiro” (or Low Loss) Geometry makes it possible to reach higher gradients → Two cavities received from KEK IS8 Baked under argon during 1 hour at 145°C → + 9MV/m + 1hour additional baking : removal of residual slope. 2 hours = optimal duration for “fast argon” baking Will be presented at EPAC 2008: MoPP154 (B. Visentin et al.) An additional test will be done to reach the quench 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

IMPROVING THE EP PARAMETERS 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

LOW REPEATITIBILITY TESTS ON 9-CELL CAVITIES SHOW A LOW REPEATITIBLITY OF THE GRADIENT COMPARED TO THE CHEMICAL POLISHING. MANY CAVITIES ARE LIMITED BY FIELD EMISSION. IT IS NECESSARY TO IMPROVE RINSING PROCEDURES. 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

ILC GDE S0 PROGRAM ON SINGLE CELL ILC S0 International Program on single-cell cavity: Different Rinsing procedures are evaluated: 6 tests for each “recipe” to have statistics: 1) EP(20 µm) + HPR + Test 2) EP (20) + H2O2 Rinsing + HPR + Baking + Test RF 3)EP (20) + Degreasing + HPR + Baking + Test RF 4) EP (20) + Ethanol Rinsing + HPR + Baking + Test RF 5) EP (20) + HF Rinsing + HPR + Baking + Test RF 6) EP (20) + Boiling Water Rinsing + HPR + Baking + Test RF 7) EP (20) + EP (3μm fresh acid) + HPR + Baking + Test RF 8) EP (20) + Oxipolishing + HPR + Baking + Test RF 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

EXAMPLE: EVALUATION OF FRESH EP AT KEK 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

Light EP + 30’ Ethanol Rinsing + HPR RESULTS WITH ETHANOL RINSING WITHIN GDE S0 PROGRAM ON 1-CELL Test Within S0 program on single cell: Recipe: Light EP + 30’ Ethanol Rinsing + HPR Mixture: HF(40%) - H2SO4 (95%) with ratio 1 – 9 3 Cavities (Tesla Shape): Before EP at Saclay: 1DE1: 37 MV/m 1DE3: 30 MV/m 1C03: 40 MV/m 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

RESULTS FOR 1DE1 AND 1DE3 CAVITIES 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

SUMMARY FOR THE 6 TESTS FOR S0 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

FINAL TABLE AND AVERAGE GRADIENT *Additional HPR At Saclay before Test #2 For the 5 EP on Desy Cavities Eacc Max = 41.35 +/- 1.27 Q0 @ Eacc Max= 1.29E10 +/- 5.27E9 ETHANOL RINSING + HPR SHOULD BE CONSIDERED AS A RELIABLE RECIPE! 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

SEARCH FOR NEW PARAMETERS: EP at LOWER VOLTAGE (5V) PROCESS EASY TO CONTROL! = Current Oscillation Regime at any Temperature and stirring conditions. + It does not seem to depend on bath aging. + Low heating of the Bath Surface after 130 µm EP at 5V Tests With 1C21 Cavity: 2 sequences: 80 µm + 50 µm +Ethanol Rinsing. EP at low temperature first (~20°C) Very Bright and little grainy surface Ratio Removal @ Iris / Removal @ Equator seems promising 110 µm / 90 µm in the half cell were acid is better renewed Lower than for Standard EP (17V) ? → To be confirmed What is the result in terms of RF performance?... 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

RF RESULTS AFTER LOW VOLTAGE EP Promising Result :1C21 cavity belong to a batch of cavities that show poor results after BCP (Baking Resistant cavities! Eacc<20 MV/m) OUTLOOK: → EP at low Voltage with ICHIRO/1DE1 Cavities + Standard EP on 1C21 → EP at higher temperature to increase the removal rate 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

IMPROVING THE EP PROCESS 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

IMPORTANCE OF THE FLUID DISTRIBUTION Example of study of the process by E. Kako (KEK) 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

→ Modelling of fluid dynamics and chemical reactions in 2D HOW CAN MODELLING HELP US? STUDY WITH COMSOL SOFTWARE M. Bruchon Is the standard EP responsible for the dissymmetric attack of the surface? → Modelling of fluid dynamics and chemical reactions in 2D Composition of the bath: In practice: Mixture of hydrofluoric and sulfuric acids (1:9 in volumes) Modelling: Density and viscosity of sulfuric acid Nb oxydation: 2 Nb + 5 H2O → 5 H2 + Nb2O5 (1) Nb2O5 + 10 HF → 2 H2NbOF5 + 3 H2O (2) Modelling: Only equation 2, Nb2O5 is continuously formed Kinetic equation: x is the production of H2NbOF5 at time t, α and β the initial concentration of Nb2O5 and HF 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

Phenomenon transport : GENERAL EQUATIONS Mass balance equation: Phenomenon transport : Diffusion Migration Convection Navier Stockes equation (incompressible fluid) Electroneutrality Gravity effect HF concentration versus time and fluid velocity High concentrated electrolyte 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

ASSYMETRIC EP FOR SINGLE-CELL CAVITIES Modelling of Saclay EP Set-up for different shapes of single cell Velocity LL TESLA HF Left beam tube is badly swept by the acid Acid “rebounds” on the right iris HF Velocity 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

IMPROVEMENT FOR SINGLE-CELL CAVITIES Inflow and outflow like 9-cells cavities Velocity field HF at 20 000s New symmetric acid distribution → more uniform attack (be careful for the irises) Will be experimentally tested at Saclay 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

9-CELL CAVITIES MODELLING Specifications from KEK (size of holes, inflow and outflow of acid) ICHIRO Cavities Fluid velocity [HF] at 4 000 s [HF] at 20 000 s TESLA Cavities HF Good electropolishing of central cell #5 Electropolishing needs to be improved in the other cells Velocity Explanation to the field flatness degradation experimentally observed at KEK after electropolishing ? →Outlook: 3D Modelling, Alternative cathode shape 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

IMPROVING THE INFRASTRUCTURES 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

NEW EP FACILITY AT KEK 9-Cell Cavity EP at Nomura Plating Building of a new set-up for 9-Cell cavities EP at KEK http://www.linearcollider.org/newsline/readmore_20080327_atw.html 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

STUDY FOR 9-CELL EP SET-UP IMPLEMENTATION AT SACLAY 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04

Preparation and Assembly Facilities for SRF Activities at Saclay SPIRAL2, SOLEIL, … cryomodule assembly 10 m X 13 m XFEL cryomodule assembly 4.4 m X 35 m XFEL cold mass assembly 6.5 m X 14 m NEW EQUIPMENT EXISTING EQUIPMENT Surface characterization (optical microscope, MEB, SIMS, …) chemical treatment of multicell cavities (+US and UP water rinsing) Ultra Pure water plant CLEAN ROOMS ISO 7 (class 10000) 6 x 7.5 m ISO 5 (class 100) 6 x 6 m ISO 4 (class 10) 6 x 14.4 m EP multi-cells Chemistry storage area Gas cleaning plant EP monocell R&D on samples CP monocell 16/05/2008 - Fabien Eozénou - FJPPL 2008 A_RD_04