Attachment-K Q3 Public Meeting Coos Bay Area Transmission Planning Study Kickoff Area Planner: Adam Lint Presented by Larry Frick September 13, 2018 Choose.

Slides:



Advertisements
Similar presentations
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
Advertisements

March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
PSE&G Condition-Based Maintenance
Public Service Company of New Mexico
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Midwest Energy, Inc. Transmission Planning and Expansion
AESO Update to PCC July 16, AESO July 2014 Update The AESO published its updated long-term plan on Jan 31 st, 2014 –Forecasting 2.4% overall load.
AESO Update to PCC October 7, AESO October 2014 Update The AESO has published 20 year regional plans on its website –Forecasting 2.4% overall.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Visibility 10/1/ Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
Montana Ambassadors Helena, Montana February 25, 2011.
Energy Gateway Gateway West Project Gateway South Project
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting December 16, 2009.
1 APEC Earthquake Response Cooperation Program for Energy Supply System Advances in Seismic Performance Evaluation of Power Networks Advances in Seismic.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
Transmission Substation 2004 Storm Season. Transmission & Substation 2 HURRICANE CHARLEY August 13, 2004 Transmission Sections Locked Out ………………………… 44.
AESO Update to PCC October 15, AESO October 2015 Update AESO currently developing 2015 Long-term Plan –Exploring low growth scenario corresponding.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Visibility Ramu Ramanathan 10/1/2007.
Agenda TSOG 8th November
Transmission Planning Base Case Loads & Transmission System Model
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Electric Utility Master Plan Update
Kenneth Silver Los Angeles Department of Water & Power
Transmission Planning Attachment K Public Input Meeting
Ensuring Security of Supply in Estonian Transmission Grid
Presented by: LADWP November 14, 2017
I-5 Corridor Reinforcement Project
Attachment-K Q2 Public Meeting
FRTPSPS (Helms RAS) Modification of Cottle 230kV Bus
Transmission Planning Attachment K Public Input Meeting
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired. 1.
Local Area Planning Update to TRANSAC – September 26, 2018
BPA Overview BPA is part of the U.S. DOE, but it is self-funded and covers all of its costs by selling products and services. Congress created BPA in 1937.
2019 Attachment O customer meeting
2018 Attachment O customer meeting
Yale Runback Local Area Protection Scheme
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired. 1.
Tyler Butikofer Associate Engineer II
2016 Attachment O True-up customer meeting
Transmission System Update
PacifiCorp Overview Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.
FRTPSPS (Helms RAS) Modification of Cottle 230kV Bus
Daniel J Marquis PNM Transmission Engineering
You may choose to use any one of these provide slide templates and make changes as desired. 1.
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired. 1.
Montpelier & Powder River 5-year Studies
You may choose to use any one of these provide slide templates and make changes as desired.
2017 Attachment O True-up customer meeting
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired.
AESO Update to PCC October 7, 2014.
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired.
Crescent City Study Kickoff
You may choose to use any one of these provide slide templates and make changes as desired.
Presentation transcript:

Attachment-K Q3 Public Meeting Coos Bay Area Transmission Planning Study Kickoff Area Planner: Adam Lint Presented by Larry Frick September 13, 2018 Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.

Sub-Transmission Planning Studies Pacific Power study plan Service Area is divided into 17 study areas The studies are designed to predict the future electrical system requirements about 5-7 years out. The goal is to update each about every 36 months. This is intended as an agenda slide template. Choose from different slide layouts by selecting “New Slide.”

Pacific Power Study Areas This is intended as an agenda slide template. Choose from different slide layouts by selecting “New Slide.”

Inputs to a Planning Study New load requests (L&R) Customer transmission & substation data Generation increases and operations plans Potential system modification data Two restrictions to public access Maintaining confidential customer information Maintaining FERC & WECC codes of conduct This is intended as an agenda slide template. Choose from different slide layouts by selecting “New Slide.”

Coos Bay Area Topology Main Grid Sources 230 kV Alvey-Fairview Dixonville-Fairview Common Corridor Fairview-Isthmus 115 kV Tahkenitch-Fairview Coos-Curry system downstream via BPA Rogue and BPA Bandon

Coos Bay Area Topology Northern Portion 230-115 kV Isthmus source Distribution substations Coos River South Dunes Lockhart Empire State Street Jordan Point Normal open points At Empire facing State Street, switch 2C14 At Lockhart facing Red Dike Tap, breaker 2C6 Both SCADA controlled Normal Open Points

Coos Bay Area Topology Southern Portion Pacific Power subs Coquille Myrtle Point Norway Tie Bandon (Pac. portion) Foreign subs Fairview Norway CCEC subs

Coos Bay Area Loads (Pacific Power) Based on most recent load projections Summer ~ 94 MW Winter ~ 150 MW Overall growth rate 0.2% Winter limited Overall load factor 51% This is intended as an agenda slide template. Choose from different slide layouts by selecting “New Slide.”

Coos Bay Area Transmission Planning Study Expected completion 2019 Q2 Questions or Input requests? This is intended as an agenda slide template. Choose from different slide layouts by selecting “New Slide.”