Jonathan Young, SDWG Chair

Slides:



Advertisements
Similar presentations
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Advertisements

Model Validation in Western Interconnection
LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities August, 2014 Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities May, 2014 Joe Seabrook Puget Sound Energy, Inc.
Joint Electric Scheduling Subcommittee Update August 20, 2013.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
NERC LMTF: Current Activities Ryan Quint, PhD, PE Staff Coordinator, NERC Load Modeling Task Force WECC MVWG Meeting June 2016.
Nodal Planning Go Live Austin, TX February 3, 2011
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TAC RELIABILITY AND OPERATIONS SUBCOMMITTEE CMWG/PLWG Planning Criteria Review/Update Report to ROS Austin, TX August 11, 2011 Kenneth A. Donohoo, P.E.
PowerWorld Case Validation
Bert Peters Chair, Path Operator Task Force
GIC System Model Workshop
Western Electricity Coordinating Council
Raul E. Perez-Guerrero Advanced Technology
Barrilla Junction Area Transmission Improvements Project
Stacen Tyskiewicz CIIMS Chair July 12, 2016
Jonathan Young ColumbiaGrid
Philip Augustin TSS Chair
Oncor Electric Delivery Company LLC
GIC Analysis using PSS®E
Path Operator Implementation Task Force
Western Electricity Coordinating Council
NERC Update: Current Activities Ryan Quint, Ph.D., P.E.
PSS®E Update for WECC Good morning, welcome to psse presentation for the UGM I’m glenn pietrow, PSSE product manager and GUI developer Currently manage.
Project WECC-0100 Update Load Modeling Task Force
Planning Tools Overview
Transition Plan for Removing Wind Phase 1 Generic Models
Reliability Assessment Committee Reliability Workshop Priorities
WECC REMTF Workshop Spencer Tacke
Simulate Inverter Momentary Cessation
CMPLDWG Composite Model with Distributed Generation Approval
Jonathan young ColumbiaGrid
Andrew Christensen, SDWG Chair
Transforming Scenario Narratives into Study Cases
PSS®E Update for WECC Good morning, welcome to psse presentation for the UGM I’m glenn pietrow, PSSE product manager and GUI developer Currently manage.
System Review Work Group
Jonathan Young SDWG Chair
Standards Review Subcommittee Update
Reliability Assessment Committee Reliability Workshop Priorities
Planning Tools Overview
Modeling Subcommittee (MS) Updates
Andrew Christensen, SRWG Chair
CMPLDWG Composite Model with Distributed Generation Approval
SRWG Chair Report March 2015 WECC HQ
Simulate Inverter Momentary Cessation
Transition Plan for Removing Wind Phase 1 Generic Models
Palo Verde-COI RAS Retirement
WECC REMTF Workshop Spencer Tacke
Project WECC-0100 Update Load Modeling Task Force
Variable Generation Subcommittee Update to PCC
Jonathan Young, SDWG Chair
Jonathan Young SDWG Chair
Andrew Christensen, SRWG Chair
Palo Verde-COI RAS Retirement
System Review Work Group Update to TSS
System Review Work Group Update to TSS
Jonathan Young ColumbiaGrid
Generator Operator Work Group (GOWG)
WECC REMTF Workshop Spencer Tacke
Bert Peters Chair, Path Operator Task Force
Managing Data Corrections Between SDWG & PDWG
Jonathan Young ColumbiaGrid
Presentation transcript:

Jonathan Young, SDWG Chair August 2018 Chair Report Jonathan Young, SDWG Chair Western Electricity Coordinating Council

Western Electricity Coordinating Council Agenda DS Approvals DPM Changes 2018/2019 Comp Schedules Model Implementation Schedule Link MVWG Update NERC SAMS Node Breaker Modeling pilot Update NERC MOD-032 Group Western Electricity Coordinating Council

Approved DPM Change Requests DS approved the Bus Low/High Voltage Limits Change Request with the alteration below. Field Description Requirements Vmax Maximum pre-contingency System Operating Limit (SOL) voltage provided to applicable Reliability Coordinator (pu) If the bus is not included in SOL submittals the software’s default value of should be used. Vmin Minimum pre-contingency System Operating Limit (SOL) voltage provided to applicable Reliability Coordinator (pu) Western Electricity Coordinating Council

Approved DPM Change Requests DS approved the addition of Gridliance West Transco LLC (GWT) to Valley Electric Association, Inc (VEA) Area without alterations. Western Electricity Coordinating Council

Model Implementation Schedule No new models to report Keep focusing on Phase 2 wind models https://www.wecc.biz/Reliability/WECC-Approved-Dynamic-Model-Implementation-Schedule-v4.1.xlsx Western Electricity Coordinating Council

Western Electricity Coordinating Council MVWG Update DER_A stand-alone model approved in Jan 2018 CMPLDW + DER_A model approval delayed Expected approval in November Latest approved dynamic model library May 2018 Western Electricity Coordinating Council

Western Electricity Coordinating Council MVWG Update Momentary Cessation “Most characteristics of momentary cessation can be modeled using the second‐generation generic renewable energy system models: regc_a, reec_a Voltage‐dependent active and reactive current reduction: VDL1 and VDL2 in reec_a Low voltage power logic switch: lvplsw=0 in regc_a Ramp control of active and reactive current: rrpwr, Iqrmax and Iqrmin in regc_a Active and reactive current control priority: pqflag = 1 if active current priority; = 0 if reactive current priority in reec_a Voltage dip logic: Vdip = Vmc‐lv and Vup = Vmc‐hv in reec_a Recovery delay: thld2 in reec_a” Western Electricity Coordinating Council

Western Electricity Coordinating Council MVWG Update Momentary Cessation Working on a new REEC model for a long term solution Western Electricity Coordinating Council

SAMS Node Breaker Modeling Pilot Update provided at August 2nd SAMS meeting Reviewing draft NDA to share data in this group The modeling group started with PSSE models in the East Coast Model Issues seen with trying to model Node Breaker topology for multiple switched shunts on the same powerflow bus Crashing occuring when modeling a Node Breaker substation that has a VSC DC device. Looking for volunteers to expand with PowerWorld and GE PSLF models To participate contact Jonathan Young young@columbiagrid.org Western Electricity Coordinating Council

Western Electricity Coordinating Council SAMS MOD 032-1 Group NERC System Analysis and Modeling Subcommittee (SAMS) is performing an assessment of industry practices around base case model building to understand the current state-of-the-art practices for each PC area and their interconnection. Identify seminaries and differences among practices and provide recommendations for consistency. Continue to Develop questionnaire To participate contact Jonathan Young young@columbiagrid.org Western Electricity Coordinating Council