Group 5 – ECE 4006: Week 12 Melanie Garrick 1/2/2019.

Slides:



Advertisements
Similar presentations
Marine Steam Power Plant Heat Balance Progress Report #2 By Steven Gelardi.
Advertisements

I-heliostat 6/15 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
The Systems Development Lifecycle Your_Name_Here.
Presenter: Kenny Haulk
Gigabit Ethernet EE 164 Group 2 – Presentation 7 Ungtae Lee April 8th 2004.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
CS-EE 481 Spring February, 2006 University of Portland School of Engineering Project Molalla Microprocessor-based Charge Controller Team Andrew Melton.
SE503 Advanced Project Management
Group 2 - Project Update April 1, 2004 Tyler Helble.
WEEK 1 You have 10 seconds to name…
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Presenter: Curtis Grens April 3, Highlights of the Last Week Connectorized PD on current board replaced with unconnectorized PD Second board constructed,
ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #12  PROGRESS  Connectorized RX, Connectorized TX, & TX/RX Combo tested using 100m cable  Unconnectorized.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board continued  Order components for.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
ECE Group 2 – Presentation 8
Opto-Link, Inc. – Status Report 8 Clif Kerr March 31, 2005
ECE 135 – BtrLaytDanNvr Presentation 7
Optical Gigabit Ethernet
Progress and Performance Measurement and Evaluation
ECE4006 Group 6 – Presentation 9
Gigabit Ethernet Progress Report ECE 4006 Harsh Sopory
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Melanie Garrick Barry Mullins Nihar Patel Jason Young
Allen Duncan Curtis Grens Kenny Haulk Chris Lambrecht Nassisa-Geda Techane April 24, 2003.
Presenter: Chris Lambrecht
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
ECE 135 – Group 3 Presentation 1-2
Presenter: Allen Duncan
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006-C Presentation the almost Last (10th)
Gigabit Ethernet Design ECE 4006C – Spring 2003
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006 Group 6 – Presentation 8
Project GabE ECE 135 – Spring 2005
مديريت موثر جلسات Running a Meeting that Works
Optical Gigabit Ethernet
ECE135 Group 2 – Presentation 3
Capstone Design Update
ECE 135 – VCSEL Kings Presentation 5
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
Project Forget-Me-Not
Status Presentation February 20-27, 2003 Michelle Middleton.
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)

Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019.
GROUP 1 FINAL PRESENTATION
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Quality Improvement Mid-Point Progress Update 18 October 2018
GIGABIT ETHERNET DESIGN ECE Spring 2004
Group 5 – ECE 4006: Week 2 Jason Young 5/2/2019.
Project GabE ECE 135 – Spring 2005 Presentation 10
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
ECE 135 – The Three Presentation 9
Project GabE ECE 135 – Spring 2005 Week 9
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

Group 5 – ECE 4006: Week 12 Melanie Garrick 1/2/2019

Progress made Built board Tested receiver and transmitter Debugged transmitter Obtained successful eye diagrams Completed report 1/2/2019

Test Results – Baseline Receiver D21.5 1/2/2019 K28.7

Test Results – Baseline Rx cont. PRBS7 K28.5 1/2/2019

Test Results – Baseline Tx D21.5 1/2/2019 K28.7

Test Results – Baseline Tx cont. PRBS7 K28.5 1/2/2019

Test Results – TxRx D21.5 1/2/2019 K28.7

Test Results – TxRx cont. PRBS7 K28.5 1/2/2019

Updated Schedule 1/2/2019

Anticipated Progress for Week 13 Complete Run 1 testing Revisit Monetary Budget Select and order cheaper parts for Run 2 Construct Run 1 Bill of Materials Begin Run 2 Layout 1/2/2019