University of Wisconsin-Madison

Slides:



Advertisements
Similar presentations
1 James N. Bellinger 4-Feb-2009 ME+1 status and Endcap Z James N. Bellinger University of Wisconsin at Madison 4-Feb-2009.
Advertisements

Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.
1 Nigel Nation 30 April 2008 More crap Nigel Nation BU ATLAS Group Weekly Meeting 29 April 2008.
Unit 4 Review Line Plots, Stem and Leaf Plots, mean, median, mode, range.
Velo to T Alignment - Reminder General Strategy  Perform relative VELO-to-IT/OT alignment using  X,  Y at the center of magnet and  X,  Y (each.
Optical Alignment System for Muon Tracker 1.Hardware 2.Learned from RUN3/4 3.Upgrade 4.Plan and Summary Atsushi Taketani, RIKEN/RIKEN Brookhaven Research.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
Muon alignment with Cosmics: Real and Monte Carlo data S.Vecchi, S.Pozzi INFN Ferrara 37th Software Week CERN June 2009.
Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate.
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
What is in my contribution area Nick Sinev, University of Oregon.
Mitglied der Helmholtz-Gemeinschaft Calibration of the COSY-TOF STT & pp Elastic Analysis Sedigheh Jowzaee IKP Group Talk 11 July 2013.
Hand Crosscheck HSLM1. Position of REF DCOPS CENTER MAB Target DM distance DMdowel to DCOPS dowel DCOPS dowel to center.
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
Secondary Vertex reconstruction for the D + Elena Bruna University of Torino ALICE Physics Week Erice, Dec. 6 th 2005.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
Chamber Alignment Pins Δy = y PG – y nom. vs. Δx = x PG – x nom. M. Hohlmann 1, G. Baksay 1, S. Guragain 1, J. Bellinger 2, D. Carlsmith 2, F. Feyzi 2,
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
1 James N. Bellinger University of Wisconsin-Madison 2-February-2011 Status and Plans for Endcap Hardware Alignment James N. Bellinger 2-February-2011.
1 James N. Bellinger University of Wisconsin-Madison 13 February 2008 Cocoa Plans.
1 James N. Bellinger University of Wisconsin-Madison 13-August-2010 Endcap Processing Notes James N. Bellinger 13-Aug-2010.
1 Update on CompareTFandDMBLCTs.cc Analyzer that compares LCTs read out from the Track Finder (input FIFO) with those read out through the EMU data path.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
1 James N. Bellinger University of Wisconsin-Madison 25-February-2011 Z-sensor News James N. Bellinger 25-February-2011 Good news this time!
9th October 2003Danny Hindson, Oxford University1 Inner Detector Silicon Alignment Simple approach -Align in stages + rely on iteration Barrel to Barrel.
1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.
1 James N. Bellinger Robert Handler University of Wisconsin-Madison 11-Monday-2009 Laser fan non-linearity James N. Bellinger 20-March-2009.
1 James N. Bellinger University of Wisconsin-Madison 19-Feb-2010 Status of Transfer Line Reconstruction James N. Bellinger 19-February-2010.
James Bellinger, December CMS Week Muon Alignment James N. Bellinger University of Wisconsin at Madison 5-December-2006 DCOPS Data from MTCC2.
University of Wisconsin at Madison
October 9, 2012 What is a radian?
Relative alignment of LXE and DCH using AIF
A. Mikhailichenko, D. Rubin
Global Alignment in LHCb Steve Blusk Syracuse University
Analysis Test Beam Pixel TPC
University of Wisconsin-Madison
University of Wisconsin-Madison
Status of Transfer Line Reconstruction University of Wisconsin-Madison
Status and Plans for Endcap Hardware Alignment
Transfer Line and CSC Rφ Reconstruction
Plus Endcap Transfer Lines
Status of Transfer Line Reconstruction University of Wisconsin-Madison
University of Wisconsin at Madison
James N. Bellinger 1-November-2007
University of Wisconsin-Madison
RM 2 7 +RM 2 4 RM 7 3 +RM 1 6 RM 5 2 +RM 2 4 RM 1 3 +RM5 2.
University of Wisconsin at Madison BMU Alignment Corrections
Validating Transfer Line Fit University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Comparing Laser Fit to Barrel Fit University of Wisconsin-Madison
Section 2 –Linear and Angular Velocity
University of Wisconsin-Madison
Run4 Fiducial Match between Real and MC
Status of Transfer Line Reconstruction University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Slope measurements from test-beam irradiations
CMS Week Muon Alignment
Transfer Line Calculations
University of Wisconsin at Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Presentation transcript:

University of Wisconsin-Madison Endcap Notes James N. Bellinger University of Wisconsin-Madison 5-August-2010 James N. Bellinger 5-Aug-2010

Comparison w/ track-based Direct comparison is slightly misleading Correlations not simple Can compare PseudoRPhi No track-based sensitivity to Z No hardware sensitivity to PseudoR (along SLM) Let ring float for best fit to hardware positions Let transfer plates float (only know by PG) James N. Bellinger 5-Aug-2010

Comparison w/ track-based Track-based connects chambers in rings Hardware connects chambers along lines Lines are fixed wrt each other by PG Let rings float Let transfer plates float James N. Bellinger 5-Aug-2010

Fit allowing transfer plates to move Fit to minimize track-hardware chamber center residuals in Pseudo-Rphi, letting SLMs float Fit moves SLM centers by an average of 0.6mm, with an rms of 1.2mm Expected PG accuracy is about 0.3mm It rotates the SLM’s by angles with rms of 0.21mrad About 1.5mm rms shifts in transfer plate phi position Fit only done for stations with SLMs and 2 rings: No ME4 or ME1 Quoted numbers from last week were not duplicated James N. Bellinger 5-Aug-2010

Fit decreases residual mean and improves RMS of residual Station/Ring Raw mean(mm) Raw rms Fit mean(mm) RMS after fit -2/1 -0.53 1.75 0.40 1.55 -2/2 -0.67 2.50 -.40 1.40 -3/1 -0.19 2.80 -0.16 2.41 -3/2 0.19 0.47 0.16 0.98 2/1 0.90 0.93 0.50 1.08 2/2 1.86 2.21 -0.50 1.17 3/1 -1.23 2.39 0.09 2.38 3/2 -0.84 -0.09 0.87 Except here James N. Bellinger 5-Aug-2010

Further work Not at 0.6mm level It ought to be Use variant of Oleg’s fit instead of Cocoa Compare to PG instead of tracking James N. Bellinger 5-Aug-2010

BACKUP Histograms of raw residuals track- hardware and residuals after the fit James N. Bellinger 5-Aug-2010

PseudoRPhi Comparison by ring: ME+2 and ME+3 Raw residuals ME+2 ME+3 Ring 1 Ring 2 James N. Bellinger 5-Aug-2010

PseudoRPhi Comparison by ring: ME+2 and ME+3 Fit residuals ME+2 ME+3 Ring 1 Ring 2 James N. Bellinger 5-Aug-2010

PseudoRPhi Comparison by ring: ME-2 and ME-3 Raw residuals ME+2 ME+3 Ring 1 Ring 2 James N. Bellinger 5-Aug-2010

PseudoRPhi Comparison by ring: ME-2 and ME-3 Fit residuals ME+2 ME+3 Ring 1 Ring 2 James N. Bellinger 5-Aug-2010

PseudoRPhi: No change in residual with increasing radius Raw residuals Fit residuals Ring 1 Ring 2 James N. Bellinger 5-Aug-2010