Region C Water Planning Group – Media Briefing

Slides:



Advertisements
Similar presentations
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
Advertisements

Creating the Water Supplies of the Future in Time of Financial Drought Lewis McMahan Texas Water Development Board.
Water Planning 101 Lower Colorado Regional Planning Group-Region K January 9, 2013 W. David Meesey, O.W.P. (Old Water Planner) 1.
Arlington Chamber of Commerce Government Relations Council Regional Water Planning Jim Parks December 8, 2010.
May 18, 2005 Oakdale Irrigation District Water Resources Plan.
Turning a Water Plan into Water Dan Hardin, Director of Water Resource Planning.
Texas State Water Planning Methodology Runnan Li Katie Born James Bronikowski.
© 2014 HDR, Inc., all rights reserved. Catawba-Wateree Water Supply Master Plan.
History of Water Reuse in Texas
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Water for Texas 2012 State Water Plan. Water Planning: Legislative Response to Drought  Late 1950s Drought of Record – 1957: Creation of TWDB – $200.
North Texas Municipal Water District’s Proposed Lower Bois d’Arc Creek Reservoir Presented by: Jim Parks.
Controversy on the Sulphur River The Proposed Marvin Nichols Reservoir Cassandra Gordon and Joan Norton.
State Water Planning Methodology of Texas Michelle Buckholtz Rebecca Cesa Wyatt Ellertson.
PUBLIC HEARING: Development (Impact) Fees - Land Use Assumptions & Infrastructure Improvement Plan Reports June 30, 2014.
Water Conservation Annual Report. Mission Statement The mission of the Texas Water Development Board is to provide leadership, planning, financial assistance,
Precipitation Patterns, Supply Planning and Demand Curves: Assessing Water Supply Risks in a Changing Climate Erica Brown Association of Metropolitan Water.
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
2013 UPDATE Spokane Valley-Rathdrum Prairie Aquifer Water Demand Forecast Update Rob Lindsay Water Resources Manager Spokane County Utilities Spokane River.
Leonard H. Dougal Jackson Walker L.L.P. (512) Upstream Development Water Needs: Supply and Permitting Considerations 24th Annual.
Water for Texas: Do We Have Enough? Dr. Dan Hardin Director, Water Resource Planning Texas Water Development Board.
CENTRAL FLORIDA COORDINATION AREA Central Florida Water Initiative Central Florida Water Initiative Regional Water Supply Plan Bill Graf Intergovernmental.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Water Recycling & Conservation State Policy and Advocacy Jennifer Perkins Texas Water Recycling Association October 15, 2014.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
WATER AVAILABILITY MODELING for the SULPHUR RIVER BASIN Texas Natural Resource Conservation Commission Austin, Texas Consultant: R. J. Brandes Company.
Regional Water Council Planning Update Dargan “Scott” Cole Hall Booth Smith & Slover, P.C. 191 Peachtree Street, Suite 2900 Atlanta, Georgia
DRA Perspective on What Recycled Water Applications from Investor- Owned Utilities Should Contain and How They Should be Evaluated CPUC Water Recycling.
An Interregional Water Solution with Conjunctive Use of Groundwater Haskell L. Simon President, Coastal Plains Groundwater Conservation District Vice President,
Water for Texas U.S. Conference of Mayors Water Board Meeting West Palm Beach, Florida Nov , 2008.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
Region C Study Commission Phase I Draft Report David Harkins, Ph. D., P.E. Espey Consultants, Inc. September 24, 2009 Espey Consultants, Inc S. 2.
Region C Study Commission Wright Patman and Lake O’ the Pines Cost Analysis David Harkins Espey Consultants.
Texas Water Development Board and the State Water Implementation Fund for Texas (SWIFT) Doug Shaw Agriculture and Rural Texas Ombudsman.
Impacts of Municipal Conservation and Reuse Strategies in Region C Dan Hardin Director, Water Resource Planning Texas Water Development Board.
Current Water Conservation (Task 3.1) Alan H. Plummer, Jr., P.E., BCEE.
Integrated Watershed Planning In Texas An Evolving Process National Waterways Conference Charleston, West Virginia September 25, 2009 Bill Mullican, P.G.,
Overview of Emerging Water Issues: North Central Texas Bruce Lesikar Texas AgriLife Extension Service.
Wildlife Co-ops and Groundwater Management in Texas? Matt Wagner, Urs Kreuter and Ronald Kaiser Texas A&M University, Institute for Renewable Natural Resources.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Conservation and Reuse Water Savings (Task 3.2) Alan H. Plummer, Jr., P.E., BCEE Alan Plummer and Associates.
Oakdale Irrigation District Agricultural Water Management Plan Briefing on 2015 Update January 5, /5/2016 OID AWMP Update Briefing.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
Larry’s Toolbox: 15% saves $400 Million. Who is the North Fort Bend Water Authority? Fort Bend Subsidence District 2003 Regulatory Plan Area A requirements:
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
REGION H Water Planning Group Freese and Nichols, Inc. | LBG-Guyton Associates | Ekistics Corporation DEVELOPING THE REGION H 2016 REGIONAL WATER PLAN.
Please, Pass the Salt: Can the Oil Industry Benefit from Desalination Wastes? TIPRO Mid-Winter Policy Meeting Fort Worth, Texas January 13, 2004 Jean-Philippe.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
2015 Urban Water Management Plan Overview
2017 Llano Estacado Regional Water Plan Planning Group Meeting
North Texas Municipal Water District “Regional Service Through Unity … Meeting Our Region’s Needs Today and Tomorrow” Water Supplies Vital for the Future.
Allocation of Ogallala Groundwater Supplies
Water Conservation in the 2016 Region C Water Plan
Joshua Basin Water District Draft Findings & Rate Scenarios
Drought in Texas Texas Division of Emergency Management
Water Conservation and Efficiency Projects for SWIFT Funding:
Florida and Reclaimed Water
Reclaimed Water Funding
Joshua Basin Water District Revised Rate Recommendations
Elizabeth Waite GIS Water Resources 29 November 2012
Watershed Planning and Protection for Lavon Lake
Withlacoochee Regional Water Supply Authority
Comprehensive Update of the Arkansas Water Plan
Brackish Water Desalination Project
Water Supply Planning for the Twin Cities Metropolitan Area
Paul D. Jones II, P.E., General Manager August 25, 2016
Water Resources Council
Quarterly Budget Update 2017 Quarterly Reports
Antelope Valley-East Kern Water Agency
Presentation transcript:

Region C Water Planning Group – Media Briefing September 10, 2009

Welcome & Introductions Jim Parks, Chair, Region C Water Planning Group (RCWPG) Jody Puckett, Vice Chair, RCWPG Tom Gooch, Lead Consultant, Freese & Nichols Colby Walton and Jennifer Engstrand, Public Participation Consultants, Cooksey Communications

Agenda History – Texas Water Development Board and Planning Regional Water Planning Process 2007 State Water Plan Current (2006) Region C Water Plan Development of 2011 Region C Water Plan Q&A * Please feel free to ask questions throughout the presentation!

Background and History Texas Water Development Board and Planning

The Big Picture – Texas Rainfall

History – TWDB and Planning In Texas, planning driven by drought Texas Water Development Board (TWDB) founded in 1957 (1950-57 drought) $200 million water development fund Formal planning process State plans from Austin in 1961, 1968, 1984, 1990, 1992, 1997 Early plans emphasized reservoirs

Regional Water Planning Process

Regional Water Planning Process Senate Bill 1 - Texas Legislature in 1997 Spurred by 1996 drought Population projected to double by 2060 “Bottom up” water planning process Texas Water Development Board Adopted rules Set out 16 regions Named initial planning group members

Regional Water Planning Areas

Regional Water Planning Process 50-year planning period Project population and water demand Existing supply Evaluate need for additional water Recommend strategies Water right permitting and TWDB funding use plans

2007 State Water Plan

Historical and Projected Population 50 45 40 35 30 Texas Population (Millions) 25 20 15 10 5 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 Year Year Historical Projected

Population Growth Rate

Projected Demand

Projected Demand

Projected Supply

Historical Groundwater Level Declines Water level decline in feet less than 50 or undetermined 50 to 100 100 to 200 200 to 300 300 to 400 400 to 500 500 to 800 greater than 800

Needs Texas does not have enough water today to meet future demand during times of drought

Potential Shortages

Strategies - Process Regions identified 4,500 strategies Evaluated strategies based on: Water quantity and reliability Financial costs Impacts to environment and agriculture Impacts to water quality Other factors such as regulatory requirements, time required to implement, etc. 9 million acre-feet per year in new supplies recommended

New Supplies 2007 State Water Plan – In Acre-Feet/Year

Costs Total capital costs: $30.7 billion

Costs of Not Implementing Plan Businesses and workers: $9.1 billion in 2010, $98.4 billion in 2060 Lost local and state taxes: $466 million in 2010, $5.4 billion in 2060 About 85 percent of the state’s population will not have enough water by 2060 in drought of record

Water Conservation In 2007 State Water Plan Implementation continues Municipal Conservation 600,000 ac-ft/yr 47% Region C, 16% Region H Irrigation Conservation 1,400,000 ac-ft/yr 32% Region M, 24% Region O, 21% Region A, 10% Region K Implementation continues

Water Supply Issue: Reuse Differing approaches to reuse Direct: before return to stream – easy to permit Indirect: returned to stream and rediverted – difficult to permit Important part of future water supply Should be encouraged

Reuse in the 2006 Regional Plans Projected for 1.66 million acre-feet/year by 2060 Slight majority in Region C Significant amounts in Regions D, H, K and L Some reuse in 14 of 16 regions

Major Existing Interbasin Transfers 1 2 3 4 5 6 8 7 10 9

Major Proposed Interbasin Transfers C1 C2 C3 C4 C5 C6 C7 C8 C9 G2 G1 H1 H2 L1 L2 M1 N1 N2 N3 N4

2006 Region C Water Plan

Water Supply for the Metroplex Region C – 16-county area Collin, Cooke, Dallas, Denton, Ellis, Fannin, Freestone, Grayson, Henderson (Trinity Basin portion only), Jack, Kaufman, Navarro, Parker, Rockwall, Tarrant and Wise 1/4 of Texas’ population 1/12 of Texas’ water use in 2000

Region C - Geography

Region C Water Supplies 90% is surface water (vs. groundwater) The primary rivers supplying water to the region – Trinity River, Red River, Sabine River and Sulphur River 35 wholesale water providers and 351 water user groups (WWPs and WUGs) 3 largest wholesale providers supply 75% (Dallas WU, Tarrant RWD, North Texas MWD) ½ of the water used is returned to streams and lakes as treated effluent Reuse could be a significant source of supply A small but growing fraction is currently reclaimed and reused

Region C – Currently Available Supplies and Projected Demands

Region C – Water Supply Critical Rapid population growth Water supply critical to way of life, continued prosperity, protection of ecology and wildlife Without additional water supply in Region C: 2060 population reduced by over 1 million (7.7%) 2060 employment reduced by nearly 700,000 jobs (17%) 2060 annual regional income reduced by $58.8 billion (21%)

Meeting Region C’s 2060 Demand Under the existing plan, Region C’s 2060 sources of supply would be as follows: 31% from currently available, connected supplies (surface and groundwater) 26% from new water conservation and reuse 23% from new connections to existing sources 18% from development of new reservoirs Additional supply from development of regional systems, system operation of reservoirs and use of groundwater

Region C’s 2060 Supplies

Meeting Region C’s Demand

Largest Region C Suppliers – Dallas Water Utilities Supplies many other communities Current supply – Lakes Ray Roberts, Lewisville, Ray Hubbard and Tawakoni Planned supplies: Conservation Reuse Existing Lakes Fork, Palestine, Wright Patman New Lake Fastrill

Dallas’ Planned Supplies

Largest Region C Suppliers – Tarrant Regional Water District Supplies Fort Worth, Arlington, many others Current supply – Lakes Bridgeport, Eagle Mountain, Cedar Creek, Richland-Chambers Planned supplies: Conservation Reuse Existing Toledo Bend Lake and Oklahoma supplies New Marvin Nichols Reservoir

TRWD’s Planned Supplies

Largest Region C Suppliers – North Texas Municipal Water District Supplies communities north and east of Dallas Current supply – Lakes Lavon, Chapman, and Texoma, and reuse Planned supplies: Conservation Additional reuse Existing Toledo Bend, Texoma, Oklahoma water New Marvin Nichols and Lower Bois d’Arc Reservoirs

NTMWD’s Planned Supplies

Development of 2011 Region C Water Plan Current Issues and Next Steps in the Planning Process

Status of Planning Process First Region C Water Plan: 2001 Second Region C Water Plan: 2006 Now working on 2011 Region C Water Plan Special studies to examine emerging water supply issues Water Conservation and Reuse Study Toledo Bend Study (with Region I) Direct and Indirect Reuse Study Studies Pertaining to Localized Areas Ellis, Johnson, southern Dallas, southern Tarrant Parker & Wise Counties

Planning Schedule RCWPG public meetings Sept. 28, 2009 Nov. 9, 2009 Jan. 2010 Mar. 2010 April 1, 2010: Initially Prepared Plan to TWDB Summer 2010: Public hearings on IPP Aug. 1, 2010: TWDB comments due Oct. 1, 2010: final Region C Water Plan due Dec. 31, 2010: TWDB Regional Plan review Jan. 5, 2012: State Water Plan published

Next Steps in Planning Reviewing updated population, demand projections Evaluating potentially feasible water management strategies Examining current issues

Current Issues in Planning Implementing water conservation and reuse Pursuing water from Oklahoma Developing of selected new reservoirs Drought response

Current Issues – Implementing Water Conservation North Texas often cited as “water hogs” Comparisons difficult because no standard measure (GPCD not standardized) Relatively high per capita municipal use Low per capita overall use Very little agricultural use Low per capita industrial use

GPCD Background Gallons Per Capita Day (GPCD) No Standard Methodology GPCD is a metric that has been used to track and compare water usage among cities in Texas No Standard Methodology Texas Commission on Environmental Quality (TCEQ) Method Texas Water Development Board (TWDB) Method Water Conservation Implementation Task Force (SB 1094) Method Water Conservation Advisory Council (SB 3 & HB 4) Method

Why is it Important to Accurately Measure Water Usage/Conservation Progress? TCEQ must consider before issuing permit for new water supply TWDB must consider before providing State funding Planners must consider whether savings can be relied upon for future water supply Suppliers must consider to assess value of investment in water efficiency strategies

Factors Affecting GPCD Calculation Water Usage Volume Population Related Usage Single Family Residential Multi-Family Residential Commercial Water Usage Institutional Water Usage Recreational/Public Water Usage Active Conservation Programs Water Use Accounting Regional Economic Condition Climate Availability of Water Supply Self-Supplied Users Water Pricing Amount of Reuse/Recycle

Factors Affecting GPCD Calculation Population Service Area Population Accuracy of Population Count Timeliness of Data Commuter Influx Growth vs. Mature Cities Regional Economic Condition

Municipal Per Capita Water Use Year 2000

Municipal Per Capita Water Use Year 2006

Total Per Capita Water Use Year 2000

Most Recent 5-Year Trailing Net Municipal Per Capita Water Use (2006 Plan) Source: 2006 Region C Water Plan “Modified Version”

Most Recent 5-Year Trailing Net Municipal Per Capita Water Use by Category (2006 Plan) Source: 2006 Region C Water Plan

Implementing Water Conservation – Major Projects Conservation awareness programs Dallas Water Utilities and Tarrant Regional Water District: “Save Water, Nothing Can Replace It” DWU: 12 billion gallons saved in 2006 TRWD: 10 billion gallons saved in 2006 North Texas Municipal Water District: Water IQ Program NTMWD: 10 billion gallons saved in 2006

Major Reuse Projects Reuse projects totaling more than 730,000 acre-feet/year developed or in-progress: NTMWD East Fork Raw Water Supply Project TRWD George Shannon Wetlands Upper Trinity Regional Water District reuse of Lake Chapman water Garland/Forney reuse for power plant Grapevine/Dallas County Park Cities Municipal Utility District Dallas contract for return flows Various others

Year 2060 Reuse Supplies M N O P A B L K J I H C G F E D

Current Issues – Sourcing of Water from Oklahoma TRWD, City of Dallas, Upper Trinity RWD and NTMWD jointly pursuing deal to pump water from Oklahoma Water from Kiamichi River, Cache Creek and Beaver Creek basins 2001 Oklahoma moratorium on out-of-state sales TRWD challenged moratorium in federal court TRWD taking lead on negotiations with Oklahoma Aug. 2008: City of Irving signed agreement to purchase water from Hugo Lake in Oklahoma

Current Issues – New Reservoirs Last major new reservoirs in area about 20 years ago Currently difficult to permit new reservoirs 4 major new reservoirs in Region C Plan Compare to 30+ developed over last 50 years New reservoirs less than 20% of 2060 supply Sometimes least expensive and best option Special study commission formed to examine Region C and D supply issues

Current Drought Conditions

Public Involvement Attend public meetings, provide comments Participate in Summer 2010 public hearing(s) on Initially Prepared Plan, provide comments on draft plan Copies of IPP will be available in at least one major public library in each of the 16 Region C counties IPP also available on Region C website Meeting agendas and planning documents at www.regioncwater.org Sign up to receive the semi-annual Region C newsletter

Closing Thoughts Conservation is essential Reuse should be encouraged Additional new supplies are needed Environmental flow needs are an issue Interbasin transfers are essential

Closing Thoughts New reservoirs are also needed Current drought in Central Texas emphasizes importance of water supply, ample surplus Public is a vital part of water planning Now is the time for the public to take notice

Q&A and Contact Info Jim Parks, RCWPG Chair jparks@ntmwd.com, 972-442-5405 Tom Gooch, Freese & Nichols tcg@freese.com, 817-735-7314 Colby Walton, Cooksey Communications colby@cookseypr.com, 972-580-0662 x23 TWDB Website www.twdb.state.tx.us/home/index.asp Region C Website www.regioncwater.org