VDL 2 capacity simulations

Slides:



Advertisements
Similar presentations
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Advertisements

ICAO ACP Working Group C Meeting Toulouse October 2003 WGC6/WP29
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning
GLOBALink/HF Data Link
Slide 1 NEWSKY – NEtWorking the SKY for aeronautical communications Michael Schnell, Sandro Scalise German Aerospace Center (DLR) Institute of Communications.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
VDL Mode 4 Cosite Investigations ACP WG-M 9 th Meeting, Agenda item 3 Montreal, October 2004.
VDL 2 capacity simulations Conclusions on the capacity per VDL 2 channel Presentation by P. Delhaise.
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Aeronautical Communications Technologies Simulator
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
Future Communications Roadmap
Service Technique de la Navigation Aérienne NexSAT: Mission Hypothesis 20 may, 2003 STNA/31 ATM issues at horizon 2015 over ECAC Capacity: - VHF spectrum.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 GNSS spectrum and signal vulnerability issues Presentation 5.2 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN Air-Ground Subnetworks
CAR/SAM GNSS/ATN SeminarFrequency planning criteriaPage 1 GROUND BASED AUGMENTATION SYSTEM Frequency Planning Criteria Presentation GNSS 3.3 by Christophe.
LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.
Cellular System Capacity Maximum number of users a cellular system can support in any cell. Can be defined for any system. Typically assumes symmetric.
CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN Subnetwork Implementation:
ARINC PETAL IIe VDL Mode 2, ATN …and beyond
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
1 15/03/2016 VDL Mode 4 Co-Site Investigations Part I Co-Site Interference Scenarios Bertrand DESPERIER ISA TELECOMS.
Additional aviation spectrum allocation for AM®S
RVSM Implementation in Europe
Workshop on preparations for ANConf/12 − ASBU methodology
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
VDL 2 capacity simulations
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
SPECTRUM REQUIREMENTS FOR FUTURE AERONAUTICAL MOBILE (ROUTE) SYSTEM - AM (R )S ( Presented by Christian Pelmoine /Dale Stacey, Eurocontrol.
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
ATN London - 23 September 2003 Alex Wandels
The Air Ground Datalink Server (AGDS)
Airbus work on VDL Mode 4 ACP WGM8 / WP-08 Rev. A
ATN Air-Ground Subnetworks
Regional Preparatory Workshop for the ITU WRC-2015
Ground System implication for ASAS implementation
Frequency Assignment Planning
Thailand, Bangkok, 18 – 21 October 2016
Karim Zeghal EUROCONTROL Experimental Centre
Presented at ICAO ACP WG-I By Robin Hughes
Evaluation Model for LTE-Advanced
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
The Air-ground VHF Communication System of Japan
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
ICAO WGN New Orleans Nov 2004
DATA LINK IMPLEMENTATION IN EUROPE
Frequency Assignment Planning
Communications Operating Concept & Requirements (COCR)
VDL Mode 4 Cosite Investigations
ATN Subnetwork Implementation:
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
P AIRPORT SURFACE DATALINK
Frequency Management Group Chairman
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Presentation transcript:

VDL 2 capacity simulations Conclusions on the capacity per VDL 2 channel Presentation by P. Delhaise

Agenda Total capacity per VDL 2 channel Comparison with Link2000+ requirements Recall on Frequency Managers deployment plan Brief look at Airborne Co-site study (integrated to ACTS simulations) Q&A

In search for total capacity/ VDL 2 channel Using peak days-peak hour air traffic records in 600 NM –radius –busiest part of Europe Applying different % of aircraft equipment with AOC and ATS (Link2000+) applications Increasing % equipped as long as QoS is OK (95% of Round Trip Tx within 8sec, as required for ACL )

Total Capacity/VDL 2 channel Up to 1220 flights operating AOC + 670 flights operating Link2000+ can be connected on a single VDL2 channel Equivalent to 100% migration of 2004-ACARS traffic + 42% of flights in UA during peak hour already running Link2000+.

Comparison with Link2000 capacity requirements (1/2) Link2000+ running on 40-45% of UA traffic : forecasted within 2008-2009 At that time, full AOC migration (nearly) completed from ACARS to VDL 2 ? Air traffic increase for coming years =? Our best guess : 1rst Channel saturated within 2007-2010 in busiest areas

Comparison with Link2000 capacity requirements (2/2) Final Link2000+ target: equipping 75% of UA traffic, forecasted in 2014 At that time, assume full AOC migration from ACARS to VDL 2 Peak hour ( 2004 traffic): 75% of UA flights ~ = 1600 flights for Link +, along 1220 flights equipped with AOC Final Link2000+ (2014) deployment requires : 2 – 3(*) VDL 2 channels for busiest areas (*) Need revisiting/ simulating ENR sectors, H.O. algorithm and round-trip delay requirements to confirm

Target VDL deployment plan for ICAO FMG EUR Since ST-15 study, coordination wih FMG EUR for provision of 4 VDL-2 channels 136.575 136.600 136.625 136.650 136.675 136.700 136.725 136.750 136.775 136.800 136.825 136.850 136.875 136.900 136.925 136.950 136.975 O Ac Si A M4 M2 2002 Ar Migrated to 131.825 MHz Migrated to 136.750MHz Oct 04- next actions are : re-allocate OPC and move M4 to 136.925 MHz, and envisage next steps A M2 Step 2 2005 b - M4 2005 a Ac Si O OR A M4 M2 - Step 4 2008

Analysis of Airborne co-site impact (presentation to ICAO ACP end October 04) Analysis of 3 airborne interf. cases (VDL 2 < > VHF- voice) Analysis made use of : Lab aircraft, 700-flight records to describe VHF voice traffic (ATC and OPC) ACTS-simulations for impact on CPDLC applications Impact confirmed tolerable for Link2000+ or any CPDLC –like application, with significant margins Sounds really tolerable for voice operation Impact on total channel capacity ~= 1.8% of ATS traffic (unchanged AOC) VDL 2 Tx AM-DSB voice Rx AM-DSB voice Tx VDL 2 Rx AM-DSB voice Tx VDL 2 Tx

Conclusions Detailed VDL2 simulator covering busiest part or Europe is now available and validated Results indicate that first VDL 2 channel will support full AOC migration +Link2000 traffic up to 2007 minimum Full Link2000 deployment (75% of UA traffic) requires 2 or 3 channels for busiest areas This matches expectations and ongoing channels deployment initiated at ICAO EUR FMG level since 2001 Airborne co-site issue is clarified for VDL 2 and accounted in the achieved simulations.

Questions ?

ACTS features and validation (1/2) Air traffic model in 4D-positions based on real flights records in European area VDL 2 ground-stations topology in 3D according to commercial deployments AOC data traffic model based on service providers traffic statistics in Europe. ATS data-link traffic tuneable per flight phase, based on Link2000+ requirements Multi-path VHF propagation model validated by flight trials

ACTS –features (2/2) Accurate and SARPS compliant simulations of VDL 2 physical layer, CSMA and AVLC, each one validated per specific programs with independent developments ATN overhead and signalling inserted according to live –records of service providers. Airborne co-site interference simulated with interfering voice traffic model based on live statistical records.

contacts Patrick DELHAISE, Eurocontrol DAS/CSM patrick.delhaise@eurocontrol.int VDL 2 Project manager +32 2 729 34 78 Massimiliano ESPOSITO, Eurocontrol DAS/CSM massimiliano.esposito@eurocontrol.int VDL 2 Engineering +32 2 729 34 90 Bertrand DESPERIER, ISA TELECOMS bertrand.desperier@isa-telecoms.com (ACTS – simulation designer) 38 rue des Gravilliers F-75003 PARIS France +33 1 44 54 57 81 +33 1 69 88 76 09