Objective INF04 ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR

Slides:



Advertisements
Similar presentations
Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Advertisements

Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective INF04 ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ENV02 ESSIP Plan 2013 Bernd HILL DSS/EIPR
LSSIP Objective AOP01.2.
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM10 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Mission Trajectory Step 1 From planning to deployment.
The European Organisation for the Safety of Air Navigation Digital NOTAM Concept AIXM XML Developers’ Seminar #5 23 March 2010.
Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
LSSIP Objective AOP04.2.
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
The Adaptation Policy Framework Bill Dougherty Stockholm Environment Institute – Boston Center Manila April 2004 An overview of the new UNDP-GEF product.
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
24-25 June 2010 SWIM-SUIT Final User Forum, Rome SWIM-SUIT Final User Forum.
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective SRC-RLMK ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
First call – May-September 2013 Technical Assistance Facility for Danube Region Projects.
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
AIS AIM SG Ad-hoc Chapters 5-6 Group
Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective ENV02 ESSIP Plan 2015 Bernd HILL DPS/PEPR
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
Request for Proposal (RFP)
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Software life cycle models
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGDL ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Presentation transcript:

Objective INF04 ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR 01.11.2015

ESSIP Plan 2015 / Objective INF04 Explanation Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria ESSIP Report 2014 Conclusions Links and contacts ESSIP Plan 2015 / Objective INF04

ESSIP Plan 2015 / Objective INF04 Explanation It is the concept of a “One Stop Shop” meaning that rather than going to different places to get information required for the flight, the pilot will have all information needed for the planning and execution of a flight available at the same place with one single request. Therefore the following improvements are expected: User accessibility during the pre-flight phase to all relevant data (aeronautical, Met, ATFM, FPL) required prior to a flight; Tailored information that is relevant to a particular flight; Reduced amount of time taken to obtain a briefing; Simplified briefings and retrieval of information; Enabling the pilots to obtain a flight briefing that is structured to suit their particular needs; Improved service quality with risks of ambiguities and inconsistencies avoided. ESSIP Plan 2015 / Objective INF04

ESSIP Plan 2015 / Objective INF04 Explanation ESSIP Plan 2015 / Objective INF04

Link to European ATM Master Plan OI step - [IS-0201]-Integrated Pre-Flight Briefing - IOC 2007;FOC 2012 Description: “The data required during the pre-flight phase are provided and presented in an integrated and flexible manner. The user can access various/information sources such as AIS, ARO, MET and ATFM which provide NOTAM, SNOWTAM, MET messages, FPL and related messages or network management messages. Rationale: “This is about integrating all information relevant to a flight (including any Network Management constraints in force, e.g. level capping) into one package” Enabler- [AIMS-07] – Generation of pre-flight briefing information “ Pre-Flight Information briefing including AIS and NOTAM is provided to airspace users”. ESSIP Plan 2015 / Objective INF04

Most important SLoA(s) Only one SLoA with FOC 12/2012: INF04-ASP01 – “Implement and provide integrated briefing function” The data required during the pre-flight phase is provided and presented into one package in a flexible manner. This is about integrating all information relevant to a flight (AIS, Flight Plan, MET and ATFM) into one single output that can be tailored to the user-s needs. Note :Level 5 defines a single report to be provided by systems. At this level full integration is achieved and a single front-end application is used to access the briefing services. However these may have separate background applications hidden from the user. Level five allows the various briefing products (MET, AIS etc.) to be combined into a single output which may be tailored as requested by the pilot.  ESSIP Plan 2015 / Objective INF04

Finalisation Criteria Integrated briefing function has been implemented with the following conditions accomplished: 1 - Facilities and services with one final application at one terminal; 2 - One single entry of flight details; 3 - All briefing products combined into a single package that may be tailored by request of the user. Note on the Applicable area : ”The level of integrated briefing deployment to be done in accordance with local needs and existing set up of briefing facilities” Optional for military services. ESSIP Plan 2015 / Objective INF04

ESSIP Plan 2015 / Objective INF04 ESSIP Report 2014 ESSIP Plan 2015 / Objective INF04

ESSIP Plan 2015 / Objective INF04 Conclusions The objective was overdue – initial completion was 2007, last cycle changed to 2012. The objective can be declared “Completed” only if the finalisation criteria is achieved It is anticipated that implementation progress of INF 04 will remain very slow due to lack of buy in and due to difficulties in achieving agreements amongst different organizations and institutions involved in the provision of data/information; In most States AIS/ARO, MET and ATFM functions are provided by independent entities. Therefore operational and technical integration is difficult to achieve; The EAD service is evolving in terms of functionality and will provide integrated briefing if there is an agreement of the State with a MET provider. In this case the achievement of INF 04 can be facilitated. It is recommended that States develop realistic plans as there are postponements year after year. ESSIP Plan 2015 / Objective INF04

ESSIP Plan 2015 / Objective INF04 Links and contacts Objective Coordinator: FRANGOLHO A. P., +32 2 729 4702 ana-paula.frangolho@eurocontrol.int DNM Objective Expert(s): Matern P., +32 2 729 3785 peter.matern@eurocontrol.int ESSIP Plan 2015 / Objective INF04