Friday 14.04 00:00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.

Slides:



Advertisements
Similar presentations
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
Advertisements

RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
LHC Status Fri Morning 3-June
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Summary Friday h38: Ramp down and pre-cycle.
Tuesday Nov 16th Fill 1492 into physics around 07.30
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Summary of Week 16 G. Arduini, J. Wenninger
Bernhard Holzer, Joerg Wenninger
Friday 31st August & night
LHC Morning Meeting - G. Arduini
Friday 14th December - morning
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Summary Thursday h21: Stable beams fill #1303.
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Sunday/Monday & :30 Stable beams. Fill #1851.
Wednesday Ramp single nominal bunches for loss maps
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
LHC Morning Meeting - G. Arduini
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Friday 25 bunch fill dumped just before (BLM in 5)
Tue/Wed 12/ :00 Probe beam back again
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Monday :15 fill 3523 dumped by BPMs IP6
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Friday morning 08:00 Stable beams with 840b.
Summary Tuesday h23: Machine closed. Precycle started.
Tuesday In the morning test cycle with probe for Q’ measurement.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Thursday 20th July - morning
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Wednesday 26 October 2011.
Wednesday morning Waiting for PS – problem on RF cavity.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 26th March 9:15 Problem with RB78 temporarily solved. It's running on one Thyristor bridge only and without the active filter LHCb polarity change.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Sat :24 Fill 2669 stable beams, average bunch intensity 1.5e11, peak lumi: ~6.5e33 cm-2s-1. 14:37 Beams dumped by operation due to cryo problem.
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Friday 1st October : Van der Meer scans
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Friday 14.04 00:00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling in IP8 tested successfully 12:11 dump by EIC, precycle, injection & ramp. In stable beams: 10h13 15:49 stable run 228 bunches. 1 UFO at 60% of dump. 19:18 Beam dump power conv. (PIC) RCBCH10.L4B2. In stable beams: 3h29 20:45 Access for PC 22:08 Injection 00:20 Stable beams. 228b. 05:15 Beam dump from electrical perturbation. In stable beams: 4h55 12/04/2011 LHC 8:30 meeting

Start Stable Beams #1713 12/04/2011 LHC 8:30 meeting

Normal losses in collisions 12/04/2011 LHC 8:30 meeting

Lumi leveling test 12/04/2011 LHC 8:30 meeting

Saturday 15.04 08:00 Electrical perturbation in IR2 ongoing. Started last Thursday 04:00 in the morning. Transparent at that time until now. Now it trips compensator (IR2) IR2 compensator (active filter) must be disconnected. EIC checked with EPC that switch off can be done with LHC powering up. Integrated lumi (2011): > 40 pb-1 Highest lumi per day… 12/04/2011 LHC 8:30 meeting

Incoming In stable beams for 228b and 50ns: 18.6 hours + 3 fills No issues for these three fills. Only normal beam losses. + 1st 50 ns fill in stable beams on Wednesday: 1.7 hours Were qualified for 300b with 75 ns… Discuss next step… 336b start with 72b inj scheme, if problems drop back to 36b inj Saturday Switch to 336b? Sunday Physics 336b 12/04/2011 LHC 8:30 meeting