Z6 experiments and necessary beam parameters

Slides:



Advertisements
Similar presentations
FAIR accelerator R&D Oliver Kester GSI Helmholtzzentrum für Schwerionenforschung Darmstadt and IAP Goethe-Universität Frankfurt.
Advertisements

Data analysis BTF 23 e 24 mag 05 T1 T2 500MeV electrons Repetition Rate 50 Hz Pulse Duration 1-10 ns Current/pulse 1 to 8 particles σ XY ~2mm Max Electronic.
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Ion Accelerator Complex for MEIC January 28, 2010.
EE 403 (or 503) Introduction to plasma Processing Fall 2011 Title of the project Your name.
Task Force on Project X for Muon Collider Keith Gollwitzer Accelerator Division Fermilab.
Harold G. Kirk Brookhaven National Laboratory Meson Production Efficiencies IDS Target Meeting CERN December 17, 2008.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker.
PAMELA Contact Author: CONFORM is an RCUK-funded Basic Technology Programme PAMELA: Concepts Particle Accelerator for MEdicaL Applications K.Peach(JAI,
Carbon therapy machine Working group2 FFAG workshop 2003 at KEK.
Hydrogen Recombination Time (µs) RF Envelope (V) Here So We get Calculated from # of protons per bunch Calculated from energy loss (voltage drop) in the.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Chopping Simulations Results M. Garcia Tudela, JB. Lallement, PA. Posocco, A. Lombardi, G.Bellodi, M. Eshraqi, E. Sargsyan, L. Hein 1 17/06/2010.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
JINR PAC, Dubna, G. Gulbekian Status of the DRIBs III Project cyclotron DC280 new experimental hall (SHE factory) cyclotron U400R reconstruction.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
J. Alessi Overview EBIS Project Technical Review 1/27/05 An EBIS-based RHIC Preinjector - Overview Jim Alessi Preinjector Group Collider-Accelerator Department.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
ICIS2015,Aug , 2015, New York, USA Further improvement of RIKEN 28GHz SC-ECRIS for production of highly charged U ion beam T. Nakagawa (RIKEN, Nishina.
AEM – Special Report Linac Current Stability and Modulation June 25, 2007 Presented by: Doug Moehs Philippians 4:6-7 (Doug) Do not be anxious about anything,
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
Preliminary results on simulation of fast-ion instability at 3 km LBNL damping ring 21 April 2005 Pohang Accelerator Laboratory Eun-San Kim.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
Proton Beam for PRISM Keith Gollwitzer Accelerator Division Fermilab 5 th Workshop Project X Physics – Muons November 8, 2010.
Fermilab and Muons Proton Driver (for ν-Factory, μ + -μ - Collider, …) David Neuffer Fermilab.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
A. Martynov on behalf of accelerator division.
M. Tomut GSI Helmholtzzentrum für Schwerionenforschung
HIAF Electron Cooling System &
Progress in the Multi-Ion Injector Linac Design
Considerations on RF systems of SPPC collider and its injector chain
Upcoming longitudinal MDs
Luminosity Optimization for FCC-ee: recent results
Beam Loading Effect in CEPC APDR
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
Timing System GSI R. Bär / U. Krause 15. Feb. 2008
Primary Beam Intensity
Progress towards Pulsed Multi-MW CERN Proton Drivers
11 MeV/u 16O7+ ion acceleration
Status of CTC activities for the Damping rings
Explanation of the Basic Principles and Goals
JLEIC electron injection demo
JLEIC electron injection demo
CEPC Injector Linac beam dynamics
Low Energy Electron-Ion Collision
DTL for MEIC Ion Injection
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
Parameters Changed in New MEIC Design
Technical challenges for forming the double intensity section of JLEIC ion beam Jiquan Guo.
RF Parameters for New 2.2 km MEIC Design
Multi-Ion Injector Linac Design – Progress Summary
Used PEP-II 476 MHz Cavities for MEIC Collider Rings
Cooling of C6+ ion beam with pulsed electron beam
Click to add title Click to add subtitle
RF Parameters for New 2.2 km MEIC Design
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

Z6 experiments and necessary beam parameters

Experiments LIGHT

Experiments LIGHT double spiral resonator > 100 kW rf power 3 gaps ±1 MV acc. voltage 108.4 MHz

Experiments Energy loss in plasma

Experiments Energy loss in plasma

Important beam parameters as much particles per micro bunch as possible (at least the same intensities as before) at least 100 µs of stable macro bunch repetition rate fr = 5 Hz / n where n is an integer micro bunch as short as possible (< 3 ns) ion species: C Ca Ar ion energies: 3.6 MeV/u (as low as possible) 108 MHz rf transmitter for LIGHT