ESA SSA Roadmap for the L5 Mission

Slides:



Advertisements
Similar presentations
ESA´s Space Situational Awareness Programme Space Weather Segment
Advertisements

European GNSS Evolution Programme
EGNOS Evolution Program Update D
LISA in the light of eLISA, April 2013PhysPAG APS, Denver LISA in the light of eLISA Neil Cornish for GWSAG APS Meeting Denver
ESA SSA Programme Objective:
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Fifth European Space Weather Week 17 th - 21 st November 2008, Page 1 SSA Programme Fifth European Space Weather Week 17 – 21 November 2008, Bruxelles.
ESA SSA SWE element status and near future plans 7th European Space Weather Week November, Brugge, Belgium Juha-Pekka Luntama Space Weather.
Spanish space activities Workshop of the interparliamentary space conference Cracovia, May 14th.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Space research Horizon Work Programme. Horizon 2020 Space work programme Work programme covers Discussion in space shadow programme committee.
Info Day on New Calls and Partner Café Brussels, 10 February 2011 How to apply: Legal Framework – Beneficiaries – Application and Selection Procedure.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
Activities proposed for procurement (EGEP-1st Batch ) 1.RIMS V3 Prototype Development 2.Galileo 2G Phase A/B Satellite Studies 3.Electrical Propulsion.
Transiting Exoplanet Survey Satellite Daryl Swade September 24, 2014 TESS DMS Management Meeting.
Slide: 1EUM/PPS/08/VWG/ October 2008 Programme Preparation 2 nd Post-EPS User Consultation Workshop Darmstadt, 3-4 February 2009 Lorenzo Sarlo.
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 Status of the ESA Earth Observation Programmes Dr. Simonetta Cheli Head of Earth Observation.
→ SSA PP and the Protection of European Space Infrastructures EISC Workshop Cracow, 14 May 2012.
ESA Integrated Applications Promotion (IAP) Funding Opportunities Ian Downey UK IAP Ambassador Platform, ECSAT Harwell
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
1 Galileo Research and Development Activities GALILEO GALILEO 6 th Framework Programme Aeronautics & Space November 2003.
MMO-SWG #3[Mar ] BepiColombo Project & MMO Science Schedule H. Hayakawa, Y. Kasaba, M. Kato, T Mukai, and JAXA BepiColombo Project.
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
Status of QUACO project
Slide no. 1 © South African Tourism 2011 Click to edit Master subtitle style SA Tourism Presentation of the SA Tourism to Portfolio Meeting Tuesday 6 September.
Programs and plans ASI - Observation of the Universe.
GEO Visit to EUMETSAT, 2 July MONITORING WEATHER AND CLIMATE FROM SPACE Overview of Current Satellite Operations GEO Visit – 2 July 2015.
1 Atmospheric Radiation – Lecture 17 PHY Lecture 17 Satellite instruments and missions.
Transiting Exoplanet Survey Satellite December 8, 2014 TESS Kickoff.
SSA SWE Segment status and prospects
Galileo Mission Consolidation & Maritime Needs December 18 th GISS, Brussels Status of Galileo Mission High Level Documents.
Arctic Region Space Weather Customers and Space Situational Awareness Services Per Høeg, Kirsti Kauristi, Peter Wintoft, Magnus Wik, Claudia Borries.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
European Space Agency ESA views on the future SSA-SWE activities in Europe 9 th European Space Weather Week 5-9 November 2012 Nicolas Bobrinsky Juha-Pekka.
Japan Meteorological Agency, June 2016 Coordination Group for Meteorological Satellites - CGMS User readiness – Himawari-8 Presented to CGMS-44 Plenary.
WMO Report 17th GSICS Executive Panel, Biot, 2-3 June 2016 Jérôme Lafeuille WMO Space Programme GSICS-EP-17, Biot, 2-3 June
Ann Mari Fjæraa Philipp Schneider Tove Svendby
Space Weather and the UK Solar Community
Transformation Charter for the Property Sector Presentation to Public Works Portfolio Committee 13 June 2006.
Report on the ESA Space-Weather Socio-Economic Study
Future SWE Missions Workshop ESA SSA/SWE State-of-Play
ESA SSA Measurement Requirements for SWE Forecasts
ESA's Ground Station Network Prospects for operations of the Lagrange missions S. Kraft OPS-L , K.-J. Schulz OPS-GS 08/03/2017.
ESA research and development plans
ESA EO Programmes after CM16 EOEP-5 Block 2
PSCE Conference Athens 23th November 2016
OGC TB13 EO Cloud Thread Cristiano Lopes 03/04/2017.
Observation scheduling
PUBLIC HEARINGS BUDGET
Welcome from the SSA PP INTRODUCTION Current Objectives
P2-SWE-X Enhanced Space Weather Monitoring System ESWW13
Remote-sensing Instruments for the Lagrange Operational Mission
Scientist Connection By: Sarah, Jakob, Jack.
מרעיון למוצר דני חייט.
The Quality Project
Pier Giorgio Marchetti, Philippe Mougnaud European Space Agency
2018/19 Annual Performance Plan
Example: If line AB is parallel to line CD and s is parallel to t, find the measure of all the angles when m< 1 = 100°. Justify your answers. t
How to apply.
Uncontrolled copy when printed
The ESA Earth Observation Long Term Data Preservation (LTDP) Programme
Giove and Galileo: Effects
2005 Transition Facility Programme
ESA M6 – What is the long-term plan?
Agencies Activities, I*Y and Programmatics Introduction
ESA Agency Report GSICS 2019 Annual Meeting 04 March 2019 ESA/ESRIN
Overview Cost to Complete
Teleconference ACS – FREIA 19th June 2017
CV-SALTS Beneficial Use and Objective Study
ESA EO Status Report 31th CEOS Plenary, October 2017.
Presentation transcript:

ESA SSA Roadmap for the L5 Mission Juha-Pekka Luntama Nicolas Bobrinsky Stefan Kraft L5 in Tandem with L1: Future Space-Weather Missions Workshop 6-9 March 2017

ESA SSA Programme Objective: Protection of space and ground assets against adverse effects from space SSA Programme initiated in April 2008 SSA Programme executed in Periods Period 1 decided at MC in November 2008 Period 2 decided at MC12 in November 2012 Period 3 decided in MC16 in December 2016 SSA SWE Lagrange Mission support 7 Participating States in the LGR mission segment in SSA Period 3 Lagrange mission Phase A/B studies and instrument pre-developments funded

Enhanced SWE observation system

SSA SWE Lagrange Mission Roadmap Consolidation of MRD/SRD for Phase A/B1 Mission target consolidation ITT preparation ITT preparation Launch Operation MAR MDR PRR SRR PDR CDR FAR Phase 0 L1 Phase A/B Phase C/D LEOP / Transfer Phase 0 L5 Instrument pre-developments to TRL 6 Instrument procurement Two parallel Phase A/B1 studies Single study to complete Phase A/B Satellite procurement Ground Segm. procurement 2016 2017 2018 2019 2020 2021 2022 2023 2024 Period 2 Period 3 Period 4 Period 5

Summary SSA Program has a mandate and funding to continue L1/L5 mission development Mission target consolidation needed in 2018 The objective is to complete Phase A/B studies by end 2019 Phase C/D proposal to be submitted to ESA MC19 Launch foreseen in 2023 One year transfer phase to L5 => Mission in operation in 2024

THANK YOU swe.ssa.esa.int www.esa.int