FASIT Technology Working Group

Slides:



Advertisements
Similar presentations
Litho ITRS Update Lithography iTWG July 2010.
Advertisements

Litho ITRS Update Lithography iTWG Dec 2010.
Building Resources in Democracy, Governance & Elections BRIDGE Project.
Water for a food-secure world Recommendations for implementing AWM in challenging contexts: 5 countries November 2012.
Rezoning Study -Committee Meeting 2- November 15, 2011.
PROJECT UPDATE February What is ctcLink? ctcLink is the implementation of a single, centralized system of integrated software tools that will give.
Target Tracking a Non-Linear Target Path Using Kalman Predictive Algorithm and Maximum Likelihood Estimation by James Dennis Musick.
I/ITSEC November 28 th - December 1 st. PM TRADE — 2011 I/ITSEC Events Monday, 28 November PM TRADE Grey Beard Session — Invite Only  Monday, 28 November.
Tools and Resources to assist State Medicaid Agencies with the implementation of ICD-10 ICD-10 Site Visits Workshop January 18-19, 2012.
3 Oct 2007/RUSI PM/Unclassified 1 Current & Future Project Management Challenges A major equipment provider’s perspective Walt Havenstein COO, BAE Systems.
1 A 252Kgates/4.9Kbytes SRAM/71mW Multi-Standard Video Decoder for High Definition Video Applications Motivation A variety of video coding standards Increasing.
Progress Report: Industry Readiness for 5010/ICD-10 Implementation Joe Miller January 19, 2010.
1 Vicki Cutcliffe Chief 2012 Bureau of Law Enforcement.
Diabetes Update Friday, October 29, 2010 Held at UAB Hospital Margaret Cameron-Spain Auditorium on the corner of 7 th Ave & 19 th Street South Birmingham,
Sustaining Long Term Regional Coordinated Monitoring Programs Todd Running, H-GAC May 9, 2006.
Sheffield City Council Approach to services to schools – 2011/12/13 And groups of schools activity Andrew Jones Assistant Director – Services to Schools.
Quality Assurance and Quality Improvement.  Standard Pathway - Required for all institutions granted initial accreditation, institutions in significant.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Update on contaminated land A Defra view Presented by: Maggie Charnley Date: 10 September 2014.
ICD-10 Providers Information.  Expanded diagnosis and surgical procedure code sets to be much more specific  Expanded field format for ICD-10 codes.
Rob Davidson, Partner Technology Specialist Microsoft Management Servers: Using management to stay secure.
School Improvement Leadership: Moving into Results Chad Dumas November 12, 2015.
PLEASE COMPLETE THIS SHORT SURVEY You can use the QR Code or the short URL to access the survey.
HLC Re-accreditation Update GENERAL FACULTY MEETING JANUARY 15, 2014.
Higher Learning Commission Accreditation Process Update.
HomeTown Health LEVEL TWO: MANAGED CARE. Why focus on MANAGED CARE? Despite the rapidly changing health care environment under managed care and.
Annual Retainer MARKETING SERVICES. Proprietary and Confidential | 2 The Challenge Consumers move from smartphones, to tablets, to PCs and back at will,
Kenny Constructions Pty. Ltd. are a dynamic, mid-tier quality assured contractor with a proven track record in successfully delivering civil, structural.
Introducing Windows Intune
A tool that allows chronological, logical representation of events Can show relationships or cause and effect between events Time and increments measured.
Higher Learning Commission Accreditation Process Update.
Involve internal and external stakeholders using various communications tools. Align and focus the entire school system with measurable outcomes. Excite.
Siebel Migration Assessment with Microsoft Consulting Services Assess whether your Siebel implementation is the right Solution for your current and future.
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
Tanner James… Enhancing your programme and project management capability P3 Management – Directions in Government for 2011 John Howarth Managing Director,
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
America’s Force of Decisive Action FASIT Working Group 1-2 Dec 2015.
RSA Professional Services RSA SecurID Solution Design and Implementation (D&I) Services.
Western Municipal Water District Drought Update
Customer Guide to Limited-Time Offer
Ubc survey tool community engagement event
BACK SOLUTION:
Employcoder - Indian Company For Offshore Software Development Services
Todd Nacapuy Chief Information Officer
The Outlook for Conventional Biofuels is Brighter Than You Think
A3 Project Title Project Lead: Facilitator: Project Champion(s):
KSDE Board Presentation Educator Evaluation Systems Update
PM TRADE – 2018 I/ITSEC Events
(insert academic year)
Project sponsor: {insert name} Project team: November 2017
Change Assurance Findings for UK Link Release 3 Health-check 2
New Technologies – New Opportunities e-Navigation Underway 2019
(insert academic year)
Assessment Report Insert Year
4/20/ :00 PM © Microsoft Corporation. All rights reserved. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN.
POWER CHALLENGES Several Ways To Solve 7 CHALLENGES.
<PI’s Name & Institution>
Mrs. Hawkins 6th Grade ELA Daily Agenda
Change Assurance Report March 2019
MATH TALK Power of 0 and 1.
MATH TALK POWER EXTREMES.
MATH TALK POWER NUMBER 64 Set 1.
MATH TALK POWER NUMBER 27.
MATH TALK POWER NUMBER 36.
MATH TALK POWER NUMBER 25.
MATH TALK POWER NUMBER 64 Set 2.
MATH TALK POWER NUMBER 16.
Unit Planning Update Updated , 2015.
Taking it home: An Action plan
Presentation transcript:

FASIT Technology Working Group James Todd Project Lead Target Modernization PM TRADE

FASIT Low Bandwidth ICD FASIT RF: Summary What We Learned Challenges Solution Timeline 30 November 2011

TRACR IA and Suite TRACR Information Assurance: Latest TRACR Requirements Processes Accreditation boundary STIG and SCAN TRACR Suite: Implementation Updates 30 November 2011

FASIT Performance Specification FASIT Requirements: What are the issues driving cost and complexity What are the divergent points between ATS and FASIT How can we assist 30 November 2011