Utah State University - University of Washington - Virginia Tech.

Slides:



Advertisements
Similar presentations
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
Advertisements

General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
VT Battery Box. 0.05” 0.005” Schwartz, J. Bergquist, A. 18/10/01 07/11/01 Battery Box Frame AA21302-DWG10 1 of 1 AA1302-DWG10 1 of 1 2 Al 6061-T6 2 INTERIOR:
Geometry 7.4 AA Similarity Postulate. An Experiment Draw any two segments AB and CD. Draw any angle at A and a congruent angle at C. Draw any angle at.
Unit 5 Three-View Drawings
Supermicro © 2009Confidential MCP N installation guide Rech Weng.
Orthographic Projection
Welcome Lesson 7 – Part 1 Computer Aided Manufacturing cam Using Mastercam.
1 Blueprint Reading for the Machine Trades, Sixth Edition Unit 12: Auxiliary Views Russ Schultz and Larry Smith PowerPoint presentation created by LaVonne.
Assembly of Conductivity Flow Loop EAS 199B living with the lab (in preparation for calibrating conductivity sensor)
Old Main Members: KaLee Allen Mike Berry Jen Dronetti Greg Hofmann Charlie Miracola.
Living with the lab Attaching Arduino to Boe-Bot Chassis © 2012 David Hall.
Old Main. Finalized Process Plans  Front Face Process Plan.
1 Reminder-Instructions for equipment  Tutorial 4 onwards you will bring the following  Approximately 21.5 x 15 in. drawing sheets  Cello tape for fixing.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
UNIT PROJECT #3 INTRODUCTION Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8.
Metal Joining Metal joints can be temporary or permanent.
Materials Lists Preparing to Build. Materials List  Complete list of all supplies needed to complete the project  Must be detailed  Dimensions of materials.
TECHNICAL DRAWINGS FOR STRUCTURAL METAL WORK. Structural metal work (SMW) specifies complementary rule to general principles of presentation and dimensioning.
Orthographic Multiview Projection Multiview Projection.
X.xxx kg Your Name SSE, Etc. DD/MM/YY 0.010” 0.005” 0.5 O Insert Name Here Insert Drawing Number # of # None Required TBD Drawing Name # of # # I O N -
Step one: Page Border and title block. Border will be ¼” from the edge of the paper. Drawing will be done in landscape format. Title block will be 1”
ID 1.75 Material list: aluminum ¼ X ¾ X 6 in flat bar ¾ X 6 in round stock 1 X 6 in round stock 2 ea 5/16 heli-coil Weld 1” joints.
New design With fewer parts and easier manufacture degrees 20mm 245.
AA21301-DWG01Detail View of Isogrid AA21301-DWG02Top View of End Panel AA21301-DWG03Multiple Views of Side Panels AA21301-DWG04Front View of Side Panel.
Study Lesson 4 Orthographic Writing. Suggestions on a view selection Contents Orthographic writing Primary auxiliary view Alignment of views (Projection.
Manufacturing the Base Plate #2. Contents of this presentation are for the machinist to view the best method of producing this foundational part to the.
0.29”.38” 3.00” 2.00” 1.70”.80”.61.49” 1.45”.64” 1.41”.19”.5 6” x.xxx kg Sean Findlay Sean Findlay. 02/27/01 03/01/ ” 0.005” 0.5 O Downlink Transmitter.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
X.xxx kg Esther Carlson Sean Findlay. 02/21/01 02/25/ ” 0.005” 0.5 O Gyroscope Mount AA DWG001 1 of 1 None Required TBD AA DWG001 1.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
TA 101: Technical Arts II Dr. Prishati Raychowdhury Department of Civil Engineering IIT Kanpur Office: FB 336; Phone: 6692
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
TYPE I TYPE II TYPE I Front View # 32 TAP DRILL 4 places B TYPE.
ION-F Sensors USUSat –4 external accelerometers –8 internal thermocouples UW Dawgstar –3 external accelerometers –8 internal thermocouples VT HokieSat.
Three View Drawing Technical Drawing and Design Osbourn Park High School Mrs. House.
Rayburn02/21/ ” 0.005” 0.5 O Top Ultem AA DWG01 1 of 7 None Required AA DWG01 1 of 7 1 I O N - F Utah State University - University.
ADVANCED MECHANICAL DRAFTING
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
Minimum Price $100. Minimum Price $45 Minimum Price $40.
Utah State University - University of Washington - Virginia Tech.
VT Battery Box.
Review and more practice
Adjust the BalaceBox springs to balance
Orthographic Writing.
Box 1 (VT).
171-SH SH Box with Pre-Installed 101⁄2" Pigtail Popular 4" square boxes and switch boxes Pre-installed 101⁄2" insulated grounding.
Utah State University - University of Washington - Virginia Tech.
Utah State University - University of Washington - Virginia Tech.
CEE cells Type I and Type II
Chapter 4 Orthographic Writing.
Valid for all 6 side panels
Utah State University - University of Washington - Virginia Tech.
ISOMETRIC CIRCLES AND CYLINDERS
Utah State University - University of Washington - Virginia Tech
ES 101 Engineering Graphics
Top View Side View Crosslink and Navigation enclosure (..805-DWG-001)
Break down Lance rack Cut one of each of these for each rack
Utah State University - University of Washington - Virginia Tech.
KATRIN 2D DWG SYMBOLS AND GDL LIBRARY
SUPPORT FRAME ASSEMBLIES, 4 REQUIRED
Print Reading.
Valve stem “gag” mechanism
Green arrows show main exit routes for people leading to congestion
TA 101 Think and Analyze Anupam Saxena Associate Professor
BETONLINEBETONLINE A·+A·+
US-HiLumi – Shipping Post Assembly Status
Omega Selection Center
Presentation transcript:

Utah State University - University of Washington - Virginia Tech. 3.5 3.5 Material – Box 5052 H-32 AL Sheet Material – Bracket 6063 T-32 L Stock Quantity – Type I 27 Quantity – Type II 14 Front View Side View TYPE I TYPE I I +0.000 -0.005 +0.000 -0.005 3.5 0.875 Bracket detail 1.325 A 1.100 0.600 0.200 0.150 0.350 0.850 A-A 0.150 A 0.300 #4-40 TAP DRILL 4 places 5.750 4.650 5.530 AA22302-DWG-006 B-B 0.050 B 0.200 0.700 2.800 0.090 0.450 1 of 1 #32 D 0.350 0.175 0.175 NOT TO SCALE 0.475 0.975 B 0.090 # 32 TAP DRILL 4 places 0.350 TYPE I HOLE LOCATIONS 0.450 0.850 0.825 I O N - F Utah State University - University of Washington - Virginia Tech. TYPE I I HOLE LOCATIONS TYPE I 1.325 6061 T6 0.010” 0.005” 0.5 O CEE Cell TYPE II Sean Findlay 02/28/01 None Required Sean Findlay 03/03/01 TBD Non FC AA22302-DWG-001 1 of 1

Utah State University - University of Washington - Virginia Tech. 0.925 # 32 TAP DRILL 4 places NOT TO SCALE 0.140 0.400 Material – Box 6061 T6 Quantity – 4 Side View Mounting post detail +0.000 -0.005 0.362 0.825 0.200 0.212 A 0.0625 0.600 0.150 0.300 0.150 0.350 0.300 A-A #4-40 TAP DRILL 4 places 0.000 A 3.5 5.675 5. 425 5.750 4.650 5.530 AA22302-DWG-006 5.050 ref 0.100 B-B 0.200 1 of 1 2.800 B D 0.090 0.350 0.275 0.475 Front View B I O N - F Utah State University - University of Washington - Virginia Tech. 6061 T6 0.5 O CEE end cell Sean Findlay 02/28/01 None Required 0.010” 0.005” Sean Findlay 03/03/01 TBD Non FC AA22302-DWG-002 1 of 1

Utah State University - University of Washington - Virginia Tech. 5.675 0.125 5.425 0.362 0.212 R 0.125 x 4 5.175 3.875 0.113 x 5 AA22302-DWG-003 0.375 0.131 1 of 1 2.575 0.30 5.15 D 5.75 0.062 uniform thickness I O N - F Utah State University - University of Washington - Virginia Tech. 6063 T6 0.010” 0.005” 0.5 O CEE end plate Sean Findlay 02/28/01 None Required Sean Findlay 03/03/01 TBD Non FC AA22302-DWG-003 1 of 1

Utah State University - University of Washington - Virginia Tech. 8.85 4.425 x 2 0.3125 0.050 0.60 X 6 0.50 X 4 0.15 X 6 0.131 WGA receptacle 0.15 X 6 0.30 X 6 ` 0.125 radius 4-40 UNC thru tap X 40 0.125 radius UW 2.575 4-40 UNC thru tap X 20 0.20 0.1405 x 6 5.75 5.53 5.05 5.05 0.15 0.475 4-40 UNC thru tap X 3 0.250 x 20 0.475 0.475 0.475 0.975 0.475 0.475 0.475 0.475 0.475 0.11 ` 0.30 0.350 AA22302-DWG-004 0.175 0.75 1.575 2.40 1 of 1 3.225 4.050 D 4.875 6.20 7.025 7.85 8.675 I O N - F Utah State University - University of Washington - Virginia Tech. 6061 T6 0.010” 0.005” 0.5 O CEE base plate - UW Sean Findlay 02/28/01 None Required Sean Findlay 03/03/01 TBD Non FC AA22302-DWG-004 1 of 1

Utah State University - University of Washington - Virginia Tech. 10.350 5.175 ` USU, VT NOTE ALL DIMENSIONS SAME AS UW BASE PLATE EXCEPT THOSE SHOWN 0.475 0.250 x 20 0.975 0.975 0.975 0.975 0.475 0.475 0.475 0.475 0.475 ` AA22302-DWG-006 0.175 0.75 1.575 2.40 1 of 1 3.225 4.050 D 4.875 6.20 7.525 8.85 10.175 I O N - F Utah State University - University of Washington - Virginia Tech. 6061 T6 0.010” 0.005” 0.5 O CEE base plate – USU, VT Sean Findlay 02/28/01 None Required Sean Findlay 03/03/01 TBD Non FC AA22302-DWG-005 1 of 1

Cell with board and WGA plug WGA plug WGA receptacle Base Plate Base Plane board Cell with board and WGA plug WGA plug WGA receptacle Base Plate 4.650 AA22302-DWG-006 AA22302-DWG-006 1 of 1 1 of 2 1 D I O N - F Utah State University - University of Washington - Virginia Tech. I O N - F Utah State University - University of Washington - Virginia Tech. 6061 T6 6061 T6 0.010” 0.005” 0.010” 0.005” 0.5 O 0.5 O CEE assembly Sean Findlay Sean Findlay 02/28/01 02/28/01 None Required None Required Sean Findlay Sean Findlay 03/03/01 03/03/01 TBD TBD Non FC Non FC AA22302-DWG-005 AA22302-DWG-006 1 of 2 1 of 1

Utah State University - University of Washington - Virginia Tech. Top View NOTE UW CEE shown, USU/VT similar End plate End cell AA22302-DWG-006 Side Bar 2 of 2 Side View D Base plate I O N - F Utah State University - University of Washington - Virginia Tech. 6061 T6 0.010” 0.005” 0.5 O CEE assembly Sean Findlay 02/28/01 None Required Sean Findlay 03/03/01 TBD Non FC AA22302-DWG-006 2 of 2