Friday morning 10:30 Optics measurements and corrections.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Week 13: R. Assmann, J. Wenninger
Ion Commissioning: Thursday & Friday
Wednesday
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday 24 March 2012.
Wednesday September 14th
Wednesday 21 March 2012.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Saturday 30th June - Sunday: Rocky !
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Monday morning 08:30 Start of rephasing MD. Dry tests in the morning.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Tuesday TOTEM and transverse loss map (1) OK
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Thursday morning 09:30 Dump of pPb fill.
Wed :40 Lost S78 - QPS controller.
Mike Lamont, Jorg Wenninger
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Week 35 – Technical Stop and Restart
Monday February 28th 8h00: Injection
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
LHC Morning Meeting - G. Arduini
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Monday 24 October hours of 25ns MD
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Summary week 18 Intensity ramp up & production
Saturday Nov Stop proton operation. Switch back to ions
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Summary for LPC (March 7th, Ralph Assmann)
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Tuesday In the morning test cycle with probe for Q’ measurement.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Tuesday – Morning and Evening
LHC Morning Meeting - G. Arduini
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Tuesday
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Friday morning 10:30 Optics measurements and corrections. New local correction, new global correction B2. Finish with MPS tests. Trigger dump of each beam by switching off the dump septa (RMSD) PCs. FMCMs trigger as expected. 13:00 Test ramp for RF with 4 equidistant bunches / beam. Ring 1 with Main Phase Loop ON. Ring 2 with Main Phase Loop OFF. Both beams are well behaved, Ib ~ 9E10. 1/3/2019 LHC 8:30 meeting

B2 – new local correction 1/3/2019 LHC 8:30 meeting

B2 – new correction… 1/3/2019 LHC 8:30 meeting

Friday afternoon 14:45 Ramp of 2 nominal bunches (1.2E11) with collision pattern. Phase loop ON. Average bunch length correct, but significant differences between the 2 bunches ! Since the beam is usable we decide to carry on to squeeze and collisions. 1/3/2019 LHC 8:30 meeting

RF blow up It is clear that there is a problem with the new blow up, and it is not understood. Since the present configuration is acceptable, it was decided not to touch the system for the weekend. On Monday the RF will perform some measurements and then roll back to the 2011 style blow-up. The new blowup will be re-tested in MD. 1/3/2019 LHC 8:30 meeting

Friday afternoon Squeeze OK, lifetimes ~25h, except for some scraping at IR2/8 TCTs (bump shape changes not yet in the functions, TCTs at 9 sigma). TCT positions corrected at end of squeeze. TCTs in IR2 and IR8 will be set to 12 sigma for standard OP. While adjusting the collimators, B2 suddenly developed a low lifetime, apparently from the H plane. Q & Q’ were OK. Lifetime suddenly increased again – not understood. Before collisions the RF colleagues corrected the BPTX offsets by 300 ps. 1/3/2019 LHC 8:30 meeting

R&S Squeeze Ramp TCTs B2 ‘instability’ 1/3/2019 LHC 8:30 meeting

First collisions 17:40 Going into collisions… very smooth. Lumi scans: Some corrections were incorporated offline from the first attempt last week – worked very well. Some collisions in ALICE without any corrections. Lumi scans: CMS and ATLAS first, LHCb last, using standard X/Y optimization. ~18:30: all IPs optimized. Correcting orbits, fixing collimator functions (for next time)… Tried out the crossing/orthogonal plane luminosity optimization. The knobs work… except that the beams move in the same direction. Sign to fix (B1 wrt B2). 1/3/2019 LHC 8:30 meeting

First fill with collisions 1/3/2019 LHC 8:30 meeting

First collisions (cont’) Since the situation is stable and quiet, we decide to carry on with TCT alignment in collision with the same beam. 20:20 Collimator alignment starting. 23:00 TCT/TCL setup in collision finished (22 coll.). TCT-IR1/5 = 9 sigma TCT-IR2/8 = 12 sigma TCL = 10 sigma Loss maps –ADT affect both beams – switch back to resonance crossing (less coupling). Good hierarchy in IR7. Some DIP problems… LHCb crate problem. 03:00 Loss map at 4 TeV un-squeezed, betatron (ADT) + off-momentum -500 Hz. 1/3/2019 LHC 8:30 meeting

B2 H loss maps - collisions 1/3/2019 LHC 8:30 meeting

Off-momentum 4 TeV 1/3/2019 LHC 8:30 meeting

Early morning Test of collimator squeeze fcts. Mismatch on a TCT in IR2 TCT.4R2.B2 (again – saw it in the afternoon). 04:00 Tested un-squeeze (dry) to 500m and 1km beta* - both worked fine ! 06:00 Asynch dump test at 4 TeV unsqueezed. Presently loss-maps at 450 GeV with injection protection at nominal settings for injection. 1/3/2019 LHC 8:30 meeting

B2V loss map (with inj prot.) 1/3/2019 LHC 8:30 meeting

B1H loss map – IR6? (seen before) 1/3/2019 LHC 8:30 meeting

Today Repeat cycle with 2 nominal bunches, align TCTs in squeeze – TCT squeeze fct issue (TCT IR2). ADT check in collisions – if it fits. Evening : alignment of roman pots. Night : loss maps & some MPS tests. Sunday 12:00 Injection and dump work 20:00 BI setup with nominal bunches at 4 TeV 1/3/2019 LHC 8:30 meeting