Reactor Building Concept Assessment

Slides:



Advertisements
Similar presentations
PRODUCTION FUNCTIONAL MANAGEMENT Creation of utilities by converting raw material to final product by various scientific methods and regulations Very important.
Advertisements

Governor’s Freight Industry Summit Draft November 12, 2012 Sandra K. Beaupre’ Wisconsin DOT Governor’s Freight Industry Summit Draft November 12, 2012.
April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 How to Achieve High Reliability, Availability, and Maintainability L. Waganer June 2007.
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintenance and Building Conceptual Approach L. M. Waganer The Boeing Company ARIES Meeting University.
Compact Stellarator Configuration Development Planning Hutch Neilson Princeton Plasma Physics Laboratory ARIES Team Meeting October 4, 2002.
January 8-10, 2003/ARR 1 Plan for Engineering Study of ARIES-CS Presented by A. R. Raffray University of California, San Diego ARIES Meeting UCSD San.
April 27-28, 2006/ARR 1 Finalizing ARIES-CS Power Core Engineering Presented by A. René Raffray University of California, San Diego ARIES Meeting UW, Madison.
ARIES-CS Page 1 Summary of ARIES Power Core Unit Costs L. Waganer The Boeing Company 16 September 2004 ARIES Meeting at Madison, WI.
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
ARIES-AT Study L. M. Waganer 3 May 2000 Status of Vacuum Vessel Design L. Waganer 3 May 2000 ARIES Conference Call.
ARIES-CS Study Page 1 Discussion Of Compact Stellarator Reactor Requirements L. Waganer The Boeing Company 8-10 January 2003 ARIES Meeting at UCSD.
November 4-5, 2004/ARR 1 ARIES-CS Power Core Options for Phase II and Focus of Engineering Effort A. René Raffray University of California, San Diego ARIES.
ARIES-Compact Stellarator Study 1 CS Power Core Materials and Fabrication Unit Cost Estimation ARIES-CS Project Meeting June 2004 University of Wisconsin,
February 24-25, 2005/ARR 1 ARIES-CS Power Core Engineering: Status and Next Steps A. René Raffray University of California, San Diego ARIES Meeting GA.
ARIES Studies L.M. Waganer 18 Sept 00/Page 1 Power Core Maintenance Approach and Maintainability Analysis By L. M. Waganer The Boeing Company For the ARIES.
ARIES Town Meeting On Physics of Compact Stellarators as Power Plants Farrokh Najmabadi and the ARIES Team September 15-16, 2005 Princeton Plasma Physics.
Comparison of 2-FP and 3-FP CS Coil Geometry Configurations Contributors: T.K. Mau, Rene Raffray and The ARIES Team ARIES Meeting General Atomics, San.
ARIES Meeting, UCSD L. M. Waganer, June 2006 An Approach for Low Cost Fabrication of the Coil Structure L. M. Waganer With Support from Kevin Slattery.
Page 1 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Restructuring System Cost Accounts and Algorithms L. Waganer 3-4 March 2008 ARIES Project Meeting.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 Groundrules, Bases, and Definitions to Scope “The Next Step” L. Waganer The Boeing Company.
Classification of Remotely Sensed Data General Classification Concepts Unsupervised Classifications.
ARIES-CS Page 1 Summary of ARIES Power Core Unit Costs L. Waganer The Boeing Company 4-5 September 2004 ARIES Meeting at UCSD.
Recent Results on Compact Stellarator Reactor Optimization J. F. Lyon, ORNL ARIES Meeting Sept. 3, 2003.
Update of the ARIES-CS Power Core Configuration and Maintenance X.R. Wang S. Malang A.R. Raffray and the ARIES Team ARIES Meeting Madison, Wisconsin September.
Engineering Manufacturing Facilities
ARIES-IFE Study L. M. Waganer, June 7, 2000 Page 1 Considerations of HI Beam and Vacuum System Arrangement L. Waganer The Boeing Company 7 June 2001 ARIES.
WAREHOUSE MANAGEMENT Industrial Logistics (BPT 3123)
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
ARIES -AT Study L.M. Waganer ARIES 3/20-21/00 Page1 ARIES-AT Vacuum Vessel Design Approach L. M. Waganer The Boeing Company 20 March 2000 UCSD San Diego,
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Operations Management And Planning
ARIES Study L. M. Waganer, 9 August Power Cycle Modeling and Cost Validation L. M. Waganer The Boeing Company 7 October 1999 E-meeting.
ARIES- ACT, 21-22May 2013, Germantown, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting May 2013 Hampton Inn,
ARIES- Pathways, October 25-26, 2010 Bethesda, MD Page 1 L. Waganer Consultant for The Boeing Company ARIES-Pathways Project Meeting October 2010.
Compact Stellarator Approach to DEMO J.F. Lyon for the US stellarator community FESAC Subcommittee Aug. 7, 2007.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
TDR Conventional Facilities Chapter 7. The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
Page 1 of 9 Power Management Technical Working Group Structure and Goals ARIES Project Meeting June 2007 M. S. Tillack and A. R. Raffray.
SC Project Review of NCSX, April 8-10, 2008 Plant Design Integration, General Arrangement Drawings E. D. Perry.
Product Analysis Tesco Cordless Jug Kettle
Open house 2013 slides T. Brown. 1.6-m FNSF Super-X Divertor Configuration.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
Realizing and Operating Enterprise Systems. Objectives  Outline the realization phase  Discuss transition approaches  Describe enterprise system operations.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Compact Stellarators as Reactors J. F. Lyon, ORNL NCSX PAC meeting June 4, 1999.
Comments on ARIES-ACT 1/2011 Strawman L. El-Guebaly Fusion Technology Institute University of Wisconsin-Madison
Updates of the ARIES-CS Power Core Configuration and Maintenance
Description of Thin Liquid Wall Protection w/Porous Walls
Highveld Industrial Park Workshop No. 5 Information Memorandum
Classification of Remotely Sensed Data
Operations Technical Working Group
Presentation on SCADA System | Sage Automation
Evolution of HV Cable Systems
HSIS S2 Governance HSISG HSIS S2 Bruce Lines Alastair Burt
Trade-Off Studies and Engineering Input to System Code
Process Drawings Matrix, Bubble, and Block Plans
Comments on ARIES-ACT 10/20/2010 Pre-Strawman
About us The ZGP groups owns three hot dip galvanizing plants. Company's firms have the following facilities: The company has a total area of ​​
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Accounting for Plant Assets and Depreciation
Concept Covered: Plant Intro Concept Covered: Plant Intro
Concept Covered: Pterophyta Concept Covered: Pterophyta
ARIES-CS Power Core Engineering: Status and Next Steps
Stellarator Program Update: Status of NCSX & QPS
University of California, San Diego
Presentation transcript:

Reactor Building Concept Assessment L. M. Waganer The Boeing Company ARIES Meeting University of Wisconsin, Madison 27-28 April 2006

Need to Define Facilities In order to have a credible cost for the Compact Stellarator Power Plant, we must develop the design approach for our facilities, most notably, the Reactor Building. Design is dependent on power core size and configuration Maintenance approach determines Reactor Building features, maintenance equipment, and size Building cost dependent on all of the above

Power Core General Configuration These graphics represent our current 3-field period, port maintenance approach

Generalization of Port Maintenance Assumptions: Enclosed, contained transporter, ala ITER Double containment Corridor sized to allow passage of another transporter behind docked transporter Room below maintenance corridor for ancillary equipment

Definition of Plan Layout Cover Laydown Area Power Core Laydown Space Overhead Crane Maintenance Corridor Removable Power Core Cover Reactor Building Plan Area 50m x 120m x 21.5 m high

Elevation View Approach

Next Actions After we decide on the final power configuration and size: Refine Maintenance Approach Develop Reactor Building characteristics Work with Xueren on Defining Reactor Building Update Reactor Building Costing Algorithms