Report of sub-WG under WG-GNSS Sub-Working Group under WG-GNSS
Action plan for 2009-2010 During the last TCTF meeting in Jakarta, following two action plans was adopted, 1. Discuss and create (if possible) a guideline of the remote calibration service in T&F field. 2. Discuss and create (if possible) a guideline of the use of GPS(GNSS)-DO in the traceability system in T&F field. But, we could not perform them during the term of 2008-2009. We propose to continue them for the next term of 2009-2010.
GPS receiver round robin among APMP region We are asking to BIPM time section about acceptance of the GPS receiver calibration results performed by the ROM activity for the time transfer link of the TAI/UTC calculation. But, ・・・