Thursday :00: Physics fill from the night shift

Slides:



Advertisements
Similar presentations
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Advertisements

Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Saturday ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40:
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Day :00-11:30: Optics at 3.5 TeV Optics re-measured with AC-dipole. Excellent reproducibility. Small emittance increase from AC-dipole. Collapsed.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Status of LHC Operations
Summary week 31 Week 31 G. Arduini & O. Brüning
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Thursday morning – optics correction
Machine availability reaching well over 80%
LHC commissioning Week 38
Lost at 12:05 to power converter (RTQX2.R1) problem
Coordination by E. B. Holzer & J. Wenninger Production
Friday 31st August & night
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Monday Morning – recovery from cryo.
Monday February 28th 8h00: Injection
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Tuesday 9th November 10:02 Fill beams dumped
Friday Morning 7:30 injection for fill 2908
Yesterday morning Held 1647 for a while – SPS kicker problem
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday – Morning Energy matching at injection with H CODs
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 17/3 Morning: evaluation of the origin of the timing problem occurred over night and the implication on machine protection 09:00 – 12:00 Dry ramp.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 24 September 2011.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Another Immortal Fill….
Wednesday 26 October 2011.
Wednesday morning / afternoon
31/3/2010 Difficult day… but at the end stable beams.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Wednesday 6.10 Morning: Quench test at 450 GeV
Thursday 10:00 Fill 1986 in stable beams.
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Thursday 15.4. 06:00: Physics fill from the night shift 08:30: End stable beam mode 09:30: Start squeeze in IR 1 & IR5: b* = 5m reached at 9:40; followed by orbit, Q, coupling and Q’ adjustments. b* = 2m reached at 10:07; followed by orbit, Q, coupling and Q’ adjustments. (tunes inverted) 11:30: Start squeeze in IR8: b* = 5m reached at 11:55; followed by orbit, Q, coupling and Q’ adjustments. Collimators moved to 12.8 s position for b* = 2m squeeze. b* = 3.5m reached at 12:20; followed by optics adjustments. b* = 3.0m reached at 12:33; followed by optics adjustments & b-beat measurements. b* = 2m reached at 12:55; followed by optics adjustments & b-beat measurements. Large vertical beam size for Beam2 due to ‘hump’  losses during AC dipole

Thursday 15.4. Tunes during IR1 and IR5 squeeze:

Thursday 15.4. Tune coupling, Eigenmode frequencies and amplitudes during morning squeeze:

Thursday 15.4. Losses during AC dipole measurements:

Thursday 15.4. b-beat Beam1 during IR8 squeeze:

Thursday 15.4. b-beat Beam2 during IR8 squeeze:

Thursday 15.4. b-beat Beam1 with Q5 correction via knob implementation:

Thursday 15.4. b-beat Beam2 with Q5 correction via knob implementation:

Thursday 15.4. 15:00: b-beat measurements in IR8 indicate again 40% beating: Incorporate corrections from yesterday even though not necessarily ultimate solution in order to reduce b-beat before squeeze in IR2. 16:30: Starting squeeze in IR2: Have to stop at b* = 9m due to current limitation for RQTL11 on the power converter side. End squeeze studies for the day. 18:00: Beams dumped by switching RQ5.LR7 off and provoking an emergency dump. 20:00: Starting injections for LBDS studies 21:15: Static VAR compensator Pt8 off. Kept off – will be looked at on Friday morning.

Thursday 15.4. Higher intensity Switching between PROBE and INDIV in the SPS is now working smoothly: adjusted some settings for the SPS rephasing. Optimization of some TI2 TCDI collimators – minimize losses. Over-injection working well in IR2 (only one dump from pilot send to TDI). Over-injected 1.1E11, collimators at nominal 4.5 sigma settings. Emittance at 1E11: 2.5 um H, 2,3 um V. The losses in the injection region do not scale with intensity: above 5E10, the losses go down (in absolute!). Saw beam de-bunching for 0.6E11  not yet understood. Beam dump due to losses on a TCLA in P7--> we had to mask it. Large losses on B1 cleaning collimators…

LHC ring losses with over-injection Example of over-injection of 1E11 – 40 us integration Losses from over-injection Losses from TL collimators (X-talk) TDI Safe Machine Parameters System

Thursday 15.4. Beam1 Emittances for 1 1011: eh= 2.8 mm, ev = 2.6 mm

Thursday 15.4. Emittances versus bunch intensity:

Thursday 15.4. Tune shift versus bunch intensity:

15.4. 06:00: Physics fill for the night Plan for the morning: Continue preparation of ‘stable beam’ operation with squeezed optics. Afternoon: access: Quench heater problem in S67, Cryo temperature sensor for RQTL9.67; PO for missing orbit correctors; CMS, ALICE, and TOTEM; LBDS. All access should be finished within 3h; Compensator Pt8 (switch ON). Continuation of LBDS studies or second ramp with squeeze. Night: Physics fill. Weekend: Continuation with preparations for higher beam intensities. Physics fills over night.