Module Production in Brussels

Slides:



Advertisements
Similar presentations
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Status Brussels GANTRY Ê We have observed a significant influence due to temperature 4 we had a lot of problems with our cooling system (ventilation) Ë.
Module Production Brussels Ê Problems with vacuum chambers in plate solved 4 Almost all plates back in Brussels (repaired in Aachen) Ë Problem with rotation.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
1 Hybrid & Module Testing Status Week of 4/25-4/29.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
FCAL silicon sensors at INP PAN Cracow Current status Our plans Some remarks FCAL Hardware WGArkadiusz Moszczynski INP PAN Cracow1.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Brussels Gantry Ê Problem with vacuum chambers in plate 4 leaks in plates with gives communication between positions Ë Problem with rotation motor (U-motor)
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
PS Module Gluing Tests USCMS Outer Tracker Workshop Ulrich Heintz, Meenakshi Narain, Bill Patterson, Sinan Sagir, Adam Lanman, Eric Spencer, Juan Trenado,
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Status Brussels GANTRY Ê New measurements of pin positions 4 using short pins rather than long ones 4 improved the precision Ë Cross-check of precision.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Conductive glue tests. J.Wickens 12/7/04 Used small pieces of HV kapton cut from redundant (old) stock, glued to silicon test structures from Karlsruhe.
Brussels Gantry Ê Problems with vacuum chambers in plate 4 mostly solved by the workshop in Aachen (thanks) Ë Problem with rotation motor (U-motor) 4 motor.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Berkeley status Aug 10th, 2012.
Ladder Assembly All tools and jigs produced Glue dispensing works
Ladder Assembly All tools and jigs produced Glue dispensing works
Phase 2 Outer Tracker Module analysis
Status Brussels GANTRY
Rod adaptors for module tests Module positioning studies
Status Brussels GANTRY
Hybrid & Module Testing Status
Vienna Module Production
Module/Ladder Assembly
CMS Perugia Modules Production Review
TEC Module Production Overview
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Module Production in Brussels
OGP Surveying & DB Entry
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
L.Fiore Gantry Meeting during the CMS TK week
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
TEC module quality overview
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
FNAL Hybrid Testing Status
Presentation transcript:

Module Production in Brussels One plate in repair in Aachen (R5S) Frames for R5 are too thick Currently producing R6 modules (alignment modules) Tracker week April 2005 10/01/2019 | pag. 1

R5S plate in repair (Aachen) We have in total 2 R5S plates hence maximum 6 R5S modules per day One position (1/6) has vaccuum leaks possibility to be repaired in Aachen difficult operation when not succesful, the position is lost proposal by Louvain-la-Neuve (UCL) make new plate as back-up (time-scale: end of May) they are investigating the possibility Titel van de presentatie 10/01/2019 | pag. 2

R5 frames are too thick Only affects R5 frames (made in Aachen) All other TEC frames made in Brussels Gantry plates have a fixed groove depth they accomodate frames up to 900 microns when thicker the frame exceeds the sensor level extra glue spots in sensor corners added (~) one year ago yesterday: meeting in Brussels with W.Braunschweig proposal to remove them for R5, R6 and R7 frames Titel van de presentatie 10/01/2019 | pag. 3

R5 frames are too thick Frame too thick only on specific places These glue points will be removed (proposal) Silicon glue put when assembling module (Gantry) frame sensor kapton frame sensor Araldite glue put when assembling frame (manual) In the corner of the sensor to make the bonding between PA and sensor easier is this area. Titel van de presentatie 10/01/2019 | pag. 4

Alignment sensors production Urgent need for 6 R6 alignment modules we use a new sensor pick-up tool (UCSB) precision of modules is fine (dry assemblies) we glue them with ‘old’ (but good) hybrids They are glued today... over the last days glued normal R6 modules all grade A hence expect no problem for the alignment sensor modules Titel van de presentatie 10/01/2019 | pag. 5

Conclusion Possibly 1/6 position lost for R5S due to vaccuum problems R5 frames being repaired in Aachen Production R5 slow : frames issue Production R3 : no hybrids Production R6 : only with old hybrids >2 FTE doing nothing most of the time !! Titel van de presentatie 10/01/2019 | pag. 6