Project-X Status Report

Slides:



Advertisements
Similar presentations
Chapter 5 Some Key Ingredients for Inferential Statistics: The Normal Curve, Probability, and Population Versus Sample.
Advertisements

> Sprint Planning Presentation API Release: Date: Presented by:
EiS – Education iT Services “Our passion in EiS is to make a real difference in education and ultimately children’s lives by providing innovative solutions.
Release Planning – Test Role and Responsibilities Emergence Tech Training / emergencetechtraining.com.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
Full Monte Cost and Schedule Risk Analysis
Introduction to Simulation. What is simulation? A simulation is the imitation of the operation of a real-world system over time. It involves the generation.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
Automobile Warranty Data Analysis by Anita Rebarchak DSES-6070 HV5 Statistical Methods for Reliability Engineering Professor Ernesto Gutierrez-Miravete.
PopMedNet Software Development Life Cycle Chayim Herzig-Marx Harvard Pilgrim Health Care Institute Daniel Dee Lincoln Peak Partners.
Introduction to ModelingMonte Carlo Simulation Expensive Not always practical Time consuming Impossible for all situations Can be complex Cons Pros Experience.
L7.1b Continuous Random Variables CONTINUOUS RANDOM VARIABLES NORMAL DISTRIBUTIONS AD PROBABILITY DISTRIBUTIONS.
Computational Lab in Physics: Final Project Monte Carlo Nuclear Collisions: Glauber Model.
S.Cholette, based on McGraw-Hill/Irwin Managing Risk.
4 March 2014 ©2014 Newdea, Inc. 2 A Global, On-Line, Customizable Project Management Tool for PPD Coordination Units Outcomes >Transparency >Learning.
Presentation Ling Zhang Date: Framework of the method 1 Using Distribution Fitting for Assumptions 2 monte – carlo simulation 3 compare different.
SIMULATION USING CRYSTAL BALL. WHAT CRYSTAL BALL DOES? Crystal ball extends the forecasting capabilities of spreadsheet model and provide the information.
© 2013 Scrum Inc. Burndown Chart Makes Team’s Velocity and its Implications Visible Sprint/Time Points Sprint/Time Points.
RMsis – v Simplify Requirement Management for JIRA.
Quantitative Project Risk Analysis 1 Intaver Institute Inc. 303, 6707, Elbow Drive S.W., Calgary AB Canada T2V 0E5
Agile Metrics It’s Not All That Complicated. © 2011 VersionOne 2 Welcome – About your Trainer, Katia Sullivan VersionOne Product Trainer and Agile Coach.
MONTE CARLO ANALYSIS When a system contains elements that exhibit chance in their behavior, the Monte Carlo method of simulation may be applied.
Components are existing in ONE of TWO STATES: 1 WORKING STATE with probability R 0 FAILURE STATE with probability F R+F = 1 RELIABLEFAILURE F R Selecting.
WHEN TITLE IS NOT A QUESTION N O ‘WE CAN’ CA Agile Vision Product Manager Michael Lester.
MAT 4830 Mathematical Modeling 04 Monte Carlo Integrations
Louisiana Department of Transportation and Development Forecasting Construction Cost Index Values Using Auto Regression Modeling Charles Nickel, P.E. Cost.
1 Impact of Sample Estimate Rounding on Accuracy ERCOT Load Profiling Department May 22, 2007.
Probabilistic Slope Stability Analysis with the
Integrated ALM with Cross-Tool Reporting Kovair Marketing Kovair Software Copyright ©
Quantify Uncertainty in Travel Forecasts
John Philbrick PE, CCP, PMP
Techno-commercial Training on CWM, VAM and JPC
ACTION TRACKING SYSTEM
Graphical Policy Analysis Tool
Project Management BBA & MBA
4.4 Monitor and Control Project Work
Presenter Name Presentation Date
Overview – SOE PatchTT November 2015.
Overview – SOE PatchTT December 2013.
2000 CAS RATEMAKING SEMINAR
Presenter Name Presentation Date
Pen-size Optimization Workbook for Experimental Research design
Managing Project Risk Chapter 8 Copyright 2012 John Wiley & Sons, Inc.
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
Negotiating Your Local Targets and Understanding Perkins Core Indicator Annual and Trend Reports November 9, 2017.
Presenter Name Presentation Date
ITSLMS - Teamcenter Sprint 3 Demo November 6, 2018
Project Estimating Overview
Burn Down charts for Project Management
Decision Focus® 6.0 Action MANAGER
Monte Carlo Simulation Managing uncertainty in complex environments.
Quantitative Project Risk Analysis
Professor S K Dubey,VSM Amity School of Business
شاخصهای عملکردی بیمارستان
TexPoint fonts used in EMF.
Agile Philly: Estimating Vs Forecasting Using a Monte Carlo Tool
مدل زنجیره ای در برنامه های سلامت
Presenter Name Presentation Date
فرق بین خوب وعالی فقط اندکی تلاش بیشتر است
Production Planning (P/P) Process Flow
Probability How confident are you?.
Yield Optimization: Divide and Conquer Method
Monte Carlo simulation of the DIRC prototype
PMI-SVC Scheduling Forum
Presented by Elodie Bernard
Presenter Name Presentation Date
Presenter Name Presentation Date
Graduation Project Project Name
Agile Project Management and Quantitative Risk Analysis
Program & Project Risks and Reporting with Oracle Primavera Cloud
Presentation transcript:

Project-X Status Report Generated by agilemontecarlo.com

Context This report is generated by agilemontecarlo.com Present in sprint demos or steering meetings to drive visibility Data is easily imported directly from Jira or added manually Simulate scope and velocity changes and see impact Multiple simulation and chart configurations Issue count or story points Historical sample or normal output distribution …

S-Curve Project Tracking Draw the project S-Curve and get a estimated landing zone if the output is below the curve

Monte Carlo Project Tracking Track the project against a target date with a target scope

Project Monte Carlo Forecast Show the outcome of 5000 project simulations to stakeholders

Project-X Scope Increase Overview

Project-X Scope Increase Details