Process Improvement Strategies Takt Time Future State Value Stream Map

Slides:



Advertisements
Similar presentations
Understanding Value Stream Decision Making
Advertisements

Value Stream Mapping AGENDA Introduction to mapping
The Principles Of Lean Repair Dr David J Horton Copyright© 2011 Beta Management Systems - All Rights Reserved.
Here we continue in the chapter on Lean Systems
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
JIT AND LEAN PRODUCTION SYSTEM BY AMAR P. NARKHEDE.
MSE507 Lean Manufacturing
LeanSigma ® Facilitator Training Module 9 – Just in Time.
Supplier Development Kaizen Implementation Kit
Starting the Journey. Lean Means Eliminating WasteLean Means Eliminating Waste  Ohno – Reduce customer order to cash collection by removing non-value.
VALUE STREAM MAPPING Analysis of Material Transport.
MSE507 Lean Manufacturing
1 Leveling: Tortoise not Hare. 2 Ohno, 1988 The slower but consistent tortoise causes less waste and is much more desirable than the speedy hare that.
Operations Management Just-in-Time Systems Supplement 12
Chapter 2 - The Value Stream
MSE507 Lean Manufacturing
Summary: Review of Lean Principles
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
Value Stream Mapping.
The Lean Enterprise VSM Symbols VSM Symbols Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Process Improvement Strategies Takt Time Future State Value Stream Map
Chapter 5 Value Stream Mapping
Value Stream Mapping How to Create the Future State Issue: You have mapped a current state, so what should your ideal or future state map look like? Overproduction.
Value Stream Mapping. Introductions & Objectives Value Stream Mapping.
 2000, QualityToolBox.com, LLC, all rights reserved A STRATEGY FOR PERFORMANCE EXCELLENCE.
Perencanaan Produksi Harian Case #2 One Piece Flow Kuliah 4 LSiPro – FT Untirta Muhammad Adha Ilhami.
Pg 1 What Is A Value Stream? All actions (Value and Non-Value-Added) currently required: – To design a product from concept to launch – To produce a product.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
Ch-6 Value Stream Mapping1 Value Stream Mapping An effective way of capturing the current situation, identifying the long-term lean vision, and developing.
1 Introduction to Value Stream Mapping & Management Major Mark McNabb, USAF.
1 A Fundamental Principle of TPS Produce to Demand 1.Make only what is needed when it is needed. 2.Base production and planning on Takt Time. 3.Develop.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
MAPPING YOUR VALUE STREAM
The Lean Enterprise Push versus Pull Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Chapter 9 Inventory Kanbans Automating the Replenishment Cycle.
Supplier Development project Tools for supplier development Inspiration for tools to be used in workshops.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
FMS 300 Series FBP-FMS320A Introduction to Flow Series: FMS320 to FMS325.
1 Lean Office - Value Streams
1 Mix Model for Executives FMS 200 Series FBP-FMS288A.
Lean Manufacturing TT4290 L4S2. History of Manufacturing (1) Craft Manufacturing (2) Mass Manufacturing (3) Lean Manufacturing.
Value Stream Mapping. Tips Keep it high level Remember this is a value stream map NOT a process map Use approximately 8 process steps Focus on the high.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Mel Wendell – Mountain Pointe High School
Introduction to Value Stream Mapping & Management
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Management is Essential
Management is Essential
繪製現狀圖.
Analytical Tools for Process Analysis and Improvement
Pull Manufacturing and Just In Time
IENG Lecture 06 Process Tools:
Value Stream Mapping GEOP 4316.
MGS 4020 Business Intelligence LSS Jul 19, 2018
Chapter 16 Lean Accounting
Value Stream Mapping (VSM) Training
Chapter 5 Process Analysis.
Value Stream Mapping ASQ March 2018.
PRODUCTION AND OPERATIONS MANAGEMENT
Chapter 12 Lean Production. Chapter 12 Lean Production.
Value Stream Map : Supplier : Picking cart : Fork lift : Material
讓價值流『精實』 消除浪費.
What is a Value Stream Map?
IENG Lecture 06 Process Tools:
Chapter 5 Value Stream Mapping
Chapter 5 Value Stream Mapping
Presentation transcript:

Process Improvement Strategies Takt Time Future State Value Stream Map Lecture 4: Overview Value Stream Mapping Present State Map Process Improvement Strategies Takt Time Future State Value Stream Map Principles for Implementing Lean Manufacturing

Value Stream Mapping Helps us see where value is created, and where waste exists: Developed by ‘product family’ Shows flow of both material & information. Helps us ‘see’ where/how specific Lean tools can be used to improve flow and eliminate waste Consists of two types of maps: Present State (“how it is”) Future State (“how it should be”) Value Stream Mapping

Present State Value Stream Map Value Stream Mapping

The Process Box Indicates basic production process. One box for each major material flow, not for each processing step. Process disconnection and inventory accumulation are indicators of where processes are separated. Value Stream Mapping

The Data Box The Data Box stores process information Cycle Time (C/T). Rate at which a part or product is completed by a process. Changeover Time (C/O). Amount of time to switch from one product type to another. Uptime. Measure of machine use (100% = Always running). Every Part Every (EPE). Measure of batch sizes and changeover cycles. Available Work Time. Per shift of a process (in seconds, minus break, meeting, and cleanup times.) Quality Level. % First time yield. Number of Operators. Required personnel for a process. Value Stream Mapping

Inventory Triangle and Push Movement Arrow An Inventory Triangle captures the location and amount of inventory A striped arrow indicates a Push movement of inventory according to a predefined schedule Value Stream Mapping

Lead Time Bars Lead time indicates total time for a process or series of process. Production/Manufacturing Lead Time (MLT). Lead time through entire production. Process Lead Time. Lead time though each process, including time in inventory. Calculated as inventory quantity divided by daily customer requirement. Processing Time = Value Added Time. Actual time spent processing the part or product. Used to highlight inefficiencies (7000 pcs)/(28400 pcs/month)x(20 workdays/month) Value Stream Mapping

Present State Value Stream Map Value Stream Mapping

Map Features 1: Document customer demand 2: Define processes w/operation data 3: Show material flow 4: Show information flow 5: Compute lead times Value Stream Mapping

Questions – Part 1 Are there any symbols on the map that you don’t recognize? What determines the work schedule at each station? How is ‘time’ data in the map acquired? What is the bottleneck in the ACME manufacturing process? Where is the biggest changeover time? What does this mean for downstream processes? Value Stream Mapping

Questions – Part 2 What is the manufacturing lead time for a product (definition and value)? How does that compare to the value added time? What is the impact of 1 truck a day leaving with finished goods and trucks arriving on Tuesday and Thursday with coils of steel? Value Stream Mapping

Questions – Part 3 Where do you see waste in this process and what types of waste from the mnemonic CLOSED MITT do you see? What countermeasures could be taken to reduce the most significant forms of waste? Value Stream Mapping

Mapping Methodology Focus on a product family within single plant. Seek leadership from the value stream manager. Go and see. Conduct door-to-door process walk. Work backwards, starting at the shipping door. Capture and quantify basic operations involved. Encourage participation of all stakeholders. Use pencil & paper rather than CAD. Value Stream Mapping

Investigation Etiquette Get management approval Communicate to all areas before visit Make introductions when you get there Remember, the workers are the experts for their tasks! Respect people’s work space Explain your purpose Value Stream Mapping

Strategies for Process Improvement #1: Produce to your Takt Time. #2: Develop continuous flow where possible to reduce inventory. Eliminate isolated islands of production. #3: Use supermarkets to control production where continuous flow does not extend upstream (often outside the plant). #4: Try to send customer schedule to only one production process (pacemaker). #5: Load-level production at pacemaker. #6: Release/withdraw small, consistent increments of work to pacemaker (pitch). Value Stream Mapping

Establish Takt Time Takt Time = Demand Rate Takt Time = Synchronizes pace of production to match pace of sales. Takt Time = Demand Rate Takt Time = Work Time Available Number of Units Sold 900 Seconds 85 Boards = 10.6 Sec/Board Takt Time = Cycle Time Takt Time = Minimum # of People GOAL: Produce to Demand Value Stream Mapping

Supermarket Pull System Used to control production where continuous flow does not extend upstream. Example Reasons for Supermarkets: Process that operate at very fast or slow cycle times and need to change over to serve multiple product families Some processes, such as those at suppliers, are far away and shipping one piece at a time does not make sense. Some processes have too much lead time or are too unreliable to couple directly to other processes in a continuous flow. Value Stream Mapping

Pacemaker Process A pacemaker process is single point in the manufacturing value stream that sets the production pace for the entire process. The pacemaker process is frequently the most downstream continuous-flow process. On the future-state map, the pacemaker process is the production process that is controlled by the outside customer’s orders. Load-leveling means distributing the production of different products evenly over a time period, creating a product “mix”. The schedule should create an “initial pull” by releasing and withdrawing a small, consistent increment of work, called the “Pitch”. Value Stream Mapping

Load Leveling and Paced Withdrawl Load-leveling means distributing the production of different products evenly over a time period, creating a product “mix”. The schedule should create an “initial pull” by releasing and withdrawing a small, consistent increment of work, called the “Pitch”. Value Stream Mapping

Questions – Part 4 What is the company’s Takt time if the demand is 460 parts per 8 hour shift (with two 10 minute breaks)? Where is it not practical to achieve continuous flow? How could a supermarket be used to overcome this? How can the welding and assembly operations be configured to Takt time? What should be the pacemaker process? What other improvements are possible? Value Stream Mapping

Future State Value Stream Map Value Stream Mapping