STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut

Slides:



Advertisements
Similar presentations
GSI Event-driven TDC with 4 Channels GET4
Advertisements

Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
24/03/2011P.-A. Loizeau – Univ. Heidelberg The CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni Heidelberg DPG 2011, Münster.
Huazhong Normal University (CCNU) Dong Wang.  Introduction to the Scalable Readout System  MRPC Readout Specification  Application of the SRS to CMB-MRPC.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Jochen Frühauf CBM-Collaboration Meeting
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Frank Lemke DPG Frühjahrstagung 2010 Time synchronization and measurements of a hierarchical DAQ network DPG Conference Bonn 2010 Session: HK 70.3 University.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Data Acquisition Backbone Core J. Adamczewski-Musch, N. Kurz, S. Linev GSI, Experiment Electronics, Data processing group.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Status of NA62 straw electronics Webs Covers Services Readout.
18/03/2010 DPG Bonn – March Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
Ingo DeppnerSTAR Regional Meeting at USTC Hefei Ingo Deppner Physikalisches Institut der Uni. Heidelberg CBM TOF prototypes STAR Regional.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
Common Readout Unit (CRU) workshop CERN Mars 2016
Summary of TRD pad plane, front-end boards and readout chain
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
The Data Handling Hybrid
AMC13 Project Status E. Hazen - Boston University
The Jülich Digital Readout System for PANDA Developments
DAQ and TTC Integration For MicroTCA in CMS
Novosibirsk, September, 2017
ETD meeting Architecture and costing On behalf of PID group
“FPGA shore station demonstrator for KM3NeT”
Beam detectors performance during the Au+Au runs in HADES
CCS Hardware Test and Commissioning Plan
Iwaki System Readout Board User’s Guide
ETD meeting Electronic design for the barrel : Front end chip and TDC
DHH progress report Igor Konorov TUM, Physics Department, E18
DCH FEE 28 chs DCH prototype FEE &
Large Area Endplate Prototype for the LC TPC
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
The University of Chicago
FMC adapter status Luis Miguel Jara Casas 5/09/2017.
Sheng-Li Liu, James Pinfold. University of Alberta
QUARTIC TDC Development at Univ. of Alberta
DAQ Interface for uTCA E. Hazen - Boston University
Front-end electronic system for large area photomultipliers readout
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Status of n-XYTER read-out chain at GSI
Trigger status Fan-out Trigger processor
Pierre-Alain Loizeau and David Emschermann for the CBM collaboration
PID meeting Mechanical implementation Electronics architecture
ZDD status BESIII Collaboration Meeting, September 2012
Status of MUCH Electronics
Presentation transcript:

STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut Status Readout Jochen Frühauf, GSI  STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut September, 2018

Jochen Frühauf--STAR-CBM Joint Workshop--September 2018 @ Outline CBM ToF @ STAR Readout Components Status FEE for STAR Firmware Status implemented open issues Power Supply & Distribution Summary and Outlook installation in 2018 Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

Jochen Frühauf--STAR-CBM Joint Workshop--September 2018 @ CBM ToF @ STAR fixed target pos. (~500 cm) 12 sectors 36 modules 108 MRPCs 6912 channels 637 electronic cards Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

Jochen Frühauf--STAR-CBM Joint Workshop--September 2018 @ Readout Components PADI: Preamplifier board 32 CH Feed through PCB GET4: TDC board 32 CH Backplane with GBTx chip AFCK: FPGA board FLIB: FPGA PCI express card CBM TOF module TCA crate HP-PC Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

Jochen Frühauf--STAR-CBM Joint Workshop--September 2018 @ Status FEE for STAR 216 x PADI FEE production finished Yield 99% (ASIC Level 12 Chips reworked ) all PCBs are mounted 72 x Feed Through PCB 216 x GET4 FEE Yield 97% reworked 71 ASICs test ongoing most of the PCBs are mounted 72 x GBTx Readout Board for ToF 99 PCBs produced SCA Chip not working so far not all PCBs tested yet a few non working PCBs found 8 out of 42 tested ~20% 24 PCBs are mounted 9 x CLK Distribution are available 1 x CLOSY is available 1 x STAR Interface is available 12 x AFCKs are available + Addons 2 x FLIBs are available + Addon Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

Jochen Frühauf--STAR-CBM Joint Workshop--September 2018 @ Firmware Status Implemented: readout of 6 GBTx (1 Sector) Real Microslices data pre-processing merging Epochs of up to 240 GET4s Token detection specific Data handling for some unexpected GET4 behavior lost Epoch multiple of the same Epoch Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

Jochen Frühauf--STAR-CBM Joint Workshop--September 2018 @ Firmware Status RMS Plot for Pulser Input open issues: we see from time to time “Mismatch Errors” which indicates not all GET4 send the right Timestamp further debugging needed GET4 FEE runs on recovered CLK from GBTx instead of 160MHz from CLOSY loss in precision we do not always get a link between GET4 and GBTx in case of copper clk detailed information about CLK in separate PPT available ~55ps between GET4 between 2 GBTx different AFCK ~35ps between GET4 between 2 GBTx same AFCK ~30ps between GET4 served by 1 GBTx System resolution should be still below 80ps Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

Jochen Frühauf--STAR-CBM Joint Workshop--September 2018 @ Power Supply Mean Well Power Unit 2x 12V / 80A (2x 110V / 13A) needed for full wheel can STAR provide 2 x power cord with IEC320-C20 connector controlled by web interface so far Power Distribution Unit for STAR will be produced in 2nd week of October prototype @ mCBM already controlled via epics via raspberry pi 3 Mean Well RKP-1UI-CMU1 RCP-2000-12 EPICs GUI Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

Jochen Frühauf--STAR-CBM Joint Workshop--September 2018 @ Summary & Outlook we produced our FEE for STAR in China we implemented the GBTx in our Readout Chain we will install the full wheel @ STAR November / December 2018 we plan to remove JTAG-PC inside the Cave either we use the raspberry or an USB to Optic converter (already bought) we continue debugging issues in our Firmware and Hardware Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

Thank you for your attention Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

Jochen Frühauf--STAR-CBM Joint Workshop--September 2018 Backup Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

CBM ToF Readout Scheme for mCBM & STAR (reminder) 1 7 Detector = MRPC Preamplifier & Discriminator = PADI Time to Digital Converter (TDC) = GET4 GBTx = Data Concentrator ASIC from CERN = 1nd concentrator stage Data Processing Board = 2rd concentrator stage (AFCK in MTCA Crate) Clock Master (CLOSY) & Clock Distribution for ToF PC = storage Device with FLIB (PCIe Card) MRPC PC 2 3 4 5 5-20m 50m PADI TDC GBTx DPB FLIB STAR Trigger - Information CBM CLK (40MHz) ToF Clock Master ToF CLK (160MHz) Cu optical 6 STAR CLK (40MHz) Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

Clock and Token Detection & Signal Distribution outside the Magnet 16x 50MHz + Reset 16x TOKEN 16x 40MHz + SYNC 1x for 1 Sector (Standalone or mTCA) 12x for full installation (mTCA) CNTR Link only 1x for full System Distribution Boards RJ45 (LVDS) 40MHz & SYNC TOKEN 1x CNTR to eTOF 50MHz & Reset 1x FLIB to DAQ Room up to 6 GBTx / AFCK to eTOF CLOSY CNTR Link provides: RESET for FEE external Pulser Signal cntr signal for switch for external Pulser injection STAR Interface PCB provides : Signal conversion into LVDS Signal Splitting Power for: 3x Distribution Board 1x CLOSY STAR 40MHz STAR_IF CBM 40MHz CBM 160MHz SYNC differential LEMO (LVDS) differential LEMO Connector Flatband Cable (Token) Connector RJ45 Connector STAR 40MHz / RES TOKEN / 50 MHz 1x 160MHz & SYNC to eTOF PECL & LVPECL Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

Clock / SYNC & CNTR Distribution inside the Magnet to neighbor Sector 1x CNTR 1x 160MHz & SYNC from downstairs 1x SECTOR Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

Jochen Frühauf--STAR-CBM Joint Workshop--September 2018 @ CBM ToF @ STAR Module testing in HD ongoing 4 sectors under test 2 sectors only under GAS Jochen Frühauf--STAR-CBM Joint Workshop--September 2018

Jochen Frühauf--STAR-CBM Joint Workshop--September 2018 CBM ToF @ mCBM readout 1600 Channel Jochen Frühauf--STAR-CBM Joint Workshop--September 2018