Report from 11th INTC meeting 25/02/2002 (nToF part)

Slides:



Advertisements
Similar presentations
Gheorghe CĂTA-DANIL*, Alexandru JIPA** * Physics Department, Politehnica University Bucharest, ROMANIA ** Atomic and Nuclear Physics Chair, Faculty of.
Advertisements

Kerstin Sonnabend, IKP, TU Darmstadt S-DALINAC - Nuclear Astrophysics Nuclear Astrophysics at the Darmstadt superconducting electron linear accelerator.
NUSTAR ECOS meeting held on the 27 of May 2005 in Paris (University of Jussieu): Three items: -The ECOS document for NuPECC -The ECOS town meeting.
ISAC Physics Working Group Convenors Malcolm Butler and Barry Davids.
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
Yoro TALL Santiago de Compostela (Spain) June 7 – 10, Second IP EUROTRANS Internal Training Course on Nuclear Data for Transmutation: status, needs.
Study of the  -decay of 12 B Proposal to INTC 25th February 2002 SpokespersonH.O.U. Fynbo ContactpersonU.C. Bergmann.
ISCC 24 May 2004L.M. Fraile L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report ISOLDE Collaboration Committee 24 th May 2004 ISOLDE scientific.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
Jefferson Lab Strategic Planning Divisional Town Meeting Mission Statement of your Division – What is or should be the mission statement of your division?
Large Colimator Study EAR2 Christina Weiss, CERN.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Mats Lindroos INTC Agenda 09:00 Introduction by the Chairman, J. Äystö 09:05 Report by the ISOLDE Technical Coordinator, M. Lindroos 09:25 Report by the.
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
Measurement of 7 Be(n,  ) and 7 Be(n,p) cross sections for the Cosmological Li problem in Addendum to CERN-INTC /INTC-P-417 Spokepersons:
ISOLDE at the turn of the millennium* Juha Äystö Helsinki Institute of Physics Helsinki, Finland * As seen by the ISOLDE Physics Group.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Elisa Rapisarda, CERN, PH Division
N_TOF commissioning INTC-P-249 Spokespersons: J.L.Tain, V.Vlachoudis Contactperson: V.Vlachoudis th Nov 2009 for the n_TOF collaboration.
Sr. Scientist Promotion Process - Orientation For Division Directors and Deputies September 15, 2015.
N_TOF activities in December 2006 A Mengoni IAEA, Vienna The n_TOF Collaborationwww.cern.ch/n_TOF.
Georg Bollen Michigan State University Facility for Rare Isotope Beams ISOLDE Preparing for New Science Opportunities.
Status of n_TOF Facility
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
FRIB-China/CUSTIPEN Fundamental Interactions - Experiment Results of Parallel Working Group
STATUS REPORT ON THE “MASHA” SET-UP A.M.Rodin, A.V.Belozerov, S.N.Dmitriev, Yu.Ts.Oganessian, R.N.Sagaidak, V.S.Salamatin, S.V.Stepantsov, D.V.Vanin PAC.
Addendum to IS587: Characterising excited states in and around the semi-magic nucleus 68 Ni using Coulomb excitation and one-neutron transfer Spokespersons:
Mats Lindroos HD Ucx review. Issued documents and presentations For review panel: –Presentation by V. Pantaleev on experimental work in Gachina –Presentation.
ERCOT Bylaws Changes for Regional Entity
Nuclear Unit Organizer #6
Complementary detectors for campaign
Measuring light elements (e. g
The role of isospin symmetry in medium-mass N ~ Z nuclei
Finnish participation at ISOLDE
Updating the Regulation for the JINR Programme Advisory Committees
The European Strategy for Particle Physics
n_TOF Phase-2 Operation in 2009
Beta Neutrino Correlation Measurement with Trapped Radioactive Ions
SMI-06 Workshop, Groningen,
Measurement of the fission cross-section of 240Pu and 242Pu at CERN’s n_TOF facility CERN-INTC , INTC-P-280 Spokespersons: M. Calviani (CERN),
Dorothea Schumann, Jörg Neuhausen, Tânia Melo Mendonça, Thierry Stora
The neutron capture cross section of the s-process branch point 63Ni
Target and Horn status report
Spectrometer Magnetic Field for Neutron Beta Decay at the SNS
Coupling of germanium detectors to the ISS
ISOLDE Workshop and Users Meeting 2017
Magdalena Kowalska, CERN PH-SME-IS
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH
EMIS, 2002, Victoria, Canada Mats Lindroos for PSMB Mats Lindroos.
Physics Revision-CHAPTER 4-Atomic Structure
Progress on J-PARC hadron physics in 2016
View from Lab Management HPS Collaboration Meeting
Fixed Decay Station at ISOLDE
Magdalena Kowalska, CERN PH-SME-IS
Preliminary Study – Radiation induced activity in a SB Target
INTC September 2002 ISOLDE Mats Lindroos Mats Lindroos.
Beam Dump Experiments with Photon and Electron Beams
Mats Lindroos for The ISOLDE team
66th ISOLDE Collaboration Committee meeting
Technical report Mats Lindroos.
Thomas Nilsson, CERN EP/IS
A High Intensity Neutrino Oscillation Facility in Europe
Adult Education Survey Anonymisation Point 6
Thomas Nilsson, CERN EP/IS
A. Herlert, CERN PH-SME-IS
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Charge and Agenda of the 18th TAC meeting
Proposal for an Experiment: Photoproduction of Neutral Kaons on Deuterium Spokespersons: D. M. Manley (Kent State University) W. J. Briscoe (The George.
Atoms and Nuclear Radiation Atoms and Isotopes
Alexander Herlert, CERN (PH-SME-IS)
Presentation transcript:

Report from 11th INTC meeting 25/02/2002 (nToF part) OPEN SESSION on Tuesday, 15 January 2002 at 09:00, Council Chamber*) 1. Introduction by chairman (5') 2. Report by the Isolde Technical Coordinator (M. Lindroos 10' +5') 3. Report by the Isolde Scientific Coordinator (T. Nilsson 10' +5') 4. Report by nTOF Technical Coordinator (P. Cennini 10' +5') 5. Report on 2002 planned activities at nTOF (P. Pavlopoulos 10' +5') 6. Status on SSP activity review document (M. Dietrich5') 7. Presentation of four proposals : P148 Study of beta decay of 12B (H. Fynbo) (15' +5') (referees J.P. B. Rubio, J. Suhonen) P149 Obtaining empirical validation of Shape coexistence in the mass 70 region (D. Jenkins) (15' +5') (referees C.R. Alvares, K.H. Langanke) P150 Precision Study of the beta decay of 62Ga (15' +5') (referees J. Kluge, D. Warner) P151 Study of deficient P and Bi isotopes by simultaneous atomic and nuclear spectroscopy (J.Kluge, D. Warner) (15'+5') In the CLOSED SESSION, we will discuss the above subjects, plus: - Addendum P136 Isospin symmetry of transitions probed by weak and strong interactions (Y. Fujita) (first discussed february 2001) (referees J. Suhonen, C. Rossi Alvarez) - Document "Solid State Physics at Isolde) (referees J.P. Duraud, P. Lieb)

Members sReport from 11th INTC meeting 25/02/2002 (nToF part) 4. Report from nToF Technical Coordinator : P. Cennini - Shielding is being modified after the target, and after the sweeping magnet Work should be completed for nToF start-up (May, 10th) - "Proposal" for a Second Measurement Station at 165 m (SMS165) Third collimator needed (ø3=8 cm @ 152 m) [now ø1=11 cm at 136 m & ø2=1.8 cm @ 176 m] 5. Report on 2002 planned activities at nToF : P. Pavlopoulos - Beam requests for this year (7 1018p+ available) 1. Completion of nToF02 (Characteristics of the facility) 1 1018p+ 2. Experiment nToF03 3 1018p+ 3. P142 (submitted in september2001) 2 1018p+ 4. Pxxx to be submitted in May 1 1018p+ - Positive recommendations for 1 & 2 only - Spokesperson required by INTCfor each experiment - Second Measurement Station at 165 m (SMS165) not discussed DG statements in open session : - Members States support Isolde, nToF, (and AD) - nToF : Acknowledgement of progress in background studies Should produce data as soon as possible, and work "as Isolde"  

Additional Shielding at the exit of the Target Area Marble By adding shielding B & C, according with the FLUKA simulation, the expected reduction of the radioactivity induced by 7Be is ~ 7.

Shielding after the Sweeping Magnet (compatible with the construction of the Second Measuring Station)

Suggested lay out for the Second Measuring Station Proposal from Orsay