Cellular Manufacturing and Plant Layout managementsupport

Slides:



Advertisements
Similar presentations
Process Selection and Facility Layout
Advertisements

Halaman 1 Matakuliah: J0084 / Introduction to Management and Business Tahun: 2007 Versi: 1 / 3 Pertemuan 20 (Twentieth Meeting) Increasing Productivity.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Linear Programming Using the Excel Solver
Supplier Development Kaizen Implementation Kit
Chapter 3 Planning for Production. Objectives Product oriented manufacturing systems versus people oriented manufacturing systems. Manufacturing smaller.
Just-in-Time and Lean Systems
Just-In-Time and Lean Systems
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Just-in-Time and Lean Systems
MSE507 Lean Manufacturing
Material Handling Conventional. Operations Process (Flow) Chart Flow diagram is a plan of work area, indicating the position of machines, flow of materials.
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
Cellular Manufacturing and Plant Layout
Improving Productivity & Quality
Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.
Process (Job Shop) Layouts
Lean Production - Objectives
Chapter 6 Production Processes.
Chapter 6 Production Processes.
Flow System, Activity Relations and Space Requirement
PRODUCTION & OPERATIONS MANAGEMENT Module II JIT & LEAN PRODUCTION Prof. A.Das, MIMTS.
Cellular Manufacturing
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
1 Facility Layout: Manufacturing and Services Manufacturing and Services Chapter 5, Part B.
Manufacturing Systems Manufacturing System Design & Control.
Cellular Manufacturing
UNIT-III Group Technology and Computer Aided Process Planning
Manufacturing and Service Processes
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Operations Management JIT & Lean Systems
Facility Design Issues. Back to the course objectives... Forecasting Strategic Planning Aggregate Production Planning Disaggregation Production Scheduling.
CELLULAR MANUFACTURING
Chapter 7: Manufacturing Processes
The Revolution of Just-In-Time (JIT) and Lean Manufacturing
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Your own footer Your Logo.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Cellular Manufacturing and Plant Layout
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Management is Essential
Management is Essential
Inputs and Outputs to Aggregate Production Planning
Process-Flow Analysis
Cellular Layouts Cellular Production Group Technology
BUSI Operations Management
Course Summary Organization: A process providing goods and services based on a set of inputs, including raw material, capital, labor and knowledge. The.
LOGISTICS NETWORK.
Cellular Manufacturing and Plant Layout Superfactory Excellence Program™ © 2004 Superfactory™. All Rights Reserved.
The Revolution of Just-In-Time (JIT) and Lean Manufacturing
Systems Design: Activity Based Costing
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
PRODUCTION PLANNING AND CONTROL
MENG 447 Manufacturing Systems Automation Chapter 1*
FACILITY LAYOUT Facility layout means:
Organizing Production Equipment
بسم الله الرحمن الرحيم غرفة صناعة عمان معهد إيجابي
Facilities Planning and Design Course code:
The use of Neural Networks to schedule flow-shop with dynamic job arrival ‘A Multi-Neural Network Learning for lot Sizing and Sequencing on a Flow-Shop’
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Manufacturing Production Planning
Layout Adapted from: Facilities Planning, Tompkins, White, Bozer, Frazelle, Tanchoco, Trevino, Wiley, New York, 1996.
Production and Operations Management
Systems Design: Activity Based Costing
“Cellular Manufacturing”
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Manufacturing’s Objectives
Presentation transcript:

Cellular Manufacturing and Plant Layout http://www. managementsupport

Outline Fundamentals of layout Process Product Fixed Hybrid Cellular Manufacturing Characteristics Implementing Cells Part Families Production Flow Analysis

Product Layout Part #1 L L M D G A A Receiving L M G Part #2 L M D Shipping Part #3

Empowered Employees in Cells Goals and tracking charts are maintained and posted. Problems are solved through daily cell meetings and problem solving teams. The inventory management system is a KANBAN Demand Pull instead of a work order/kit picking system. Cells are responsible for planning, scheduling and expediting directly with vendors. They establish and maintain a KANBAN system with the vendors. The decision is stated in terms of a goal which directs the search for solutions in positive ways. A confused and unfocused group starts getting organized by concentrating on the goal of the solution, not on the solution itself. In the planning process, the goal is a given, but that is not always the case. Too often we believe the decision statement is a given. In fact, the reason for our decision is essential to opening the search for a good solution. Goals direct the search for positive ways. Ostensibly expand our goal; then create a hierarchy of goals or decision statements. Compose the decision statement using an action verb, an object and an adjective. The action verb should be prescriptive and concerned with the total set of conditions (for example, to select, choose, determine, have, establish, provide) as opposed to verbs that indicate a measurement of change or incremental goals (to increase, reduce, minimize). The adjectives modify or constrain. They reduce the range of possible solutions with a limitation.

Factory Flow Analysis - Methodology Study and map the existing flow system Identify the dominant material flows between shops (or buildings) Determine the Process Route Number (PRN) for each part Analyze the part by PRN. Combine closely associated processes at departments that complete most of the parts they make If parts are observed to backtrack then such flows are eliminated by minor redeployment of equipment

Group Analysis The flows in each of the individual shops (identified by FFA) are analyzed. Operation sequences of the parts that are being produced in a particular shop are analyzed to identify manufacturing cells. Loads are calculated for each part family to obtain the equipment requirements for each cell

PFA: Weakness PFA is suitable mostly for small-sized applications, but it has difficulties coping with some large cell formation problems when the Machine-Part Matrix becomes more complex because of problem size