ESS Concrete Pit Lids.

Slides:



Advertisements
Similar presentations
CASTING A CONCRETE WALL
Advertisements

Mezzanine Floor.
Heavy Concrete Construction Formwork
Glenn Murcutt Anna James Construction & Structures 2 SRT251.
PCI 6 th Edition Handbook History. Presentation Outline PCI history Notable modifications to the 6 th Edition General chapter by chapter overview.
Structural Components
MICE Radiation Shield Design review for the proposed ‘Direct Drive’ MICE Spectrometer Radiation Shield 17/11/2011Norbert Collomb.
The development of wall structures After the foundations have been completed the external walls are set out and construction commenced. There are many.
Arch 330 Fall 2008 FORMWORK AND REINFORCING FOR CONCRETE.
Major Diameter: The largest diameter of the thread Minor Diameter: The smallest diameter of the thread Pitch: Distance between two threads (mm) or no of.
Rev: Section 3 Framing Operations. Rev: Learning Objectives: Section 3 Understand when fall protection must be provided Evaluate the use.
PCI 6th Edition Connection Design.
After the foundations have been completed the walls are set out and construction commences. wall structures.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
CONSTRUCTING A FIVE CABIN LATRINE
Introduction to composite construction of buildings
Material F.3 D & T Shun Lee Catholic Secondary School.
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
Submitted by Waris jamal Praveen kumar gautam Shiv pratap singh Ramashwar kumar singh Under the guidence of Prof.safiulla khan.
Introduction to a pit installation
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
Door seal test set-up concepts 10/10/2015Robin Lafever LBNL1 Generic Door seal concepts for personnel access and feed-through applications in the CUORE.
Chapter 25 Framing Methods. 2 Links for Chapter 25 Balloon Framing Platform Framing Post-and-Beam Framing Related Web Sites Steel Construction Concrete.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
Comparative Study of Codes for the Design of Composite Decks and Plate Girders for Bridges and Buildings By Venkata S. Vemana For CIVL 511 – April
Competency: Draw wall sections and details
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Construction Materials Metal.  Structural steel  Cross section  Second moment of area.
Chapter 23: Structural Drafting
BASICS OF UK DETAILING. BS Codes : 1) Design code: BS8110 2) Detailing codes: BS8666 BS4449.
Name ________________ Unit 6/P6 – Concrete Construction Expensive Heavy and dense = strong, sound proof and thermally efficient. Cast in situ or pre-cast.
Josh Schortgen Phillip Byers BOAR Mike Broski Jonathan Mulvaine.
WALL COMPONENT IDENTIFICATION
Toshiba high pressure turbine casing for 600 MW power station, showing unusually long clamping bolts with very narrow flanges 1 Bolts in Tension pt 2 Andrei.
BUILDING CONSTRUCTION
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Date of download: 9/18/2016 Copyright © ASME. All rights reserved. From: Effect of Impact Pressure on Reducing the Weld Residual Stress by Water Jet Peening.
Leads Institute of Technology & Engineering
YOUR BEST CONNECTIONS All parties concerns and interests combined
STEP 1: ASSEMBLE ANGLE PLATES
Foundation – jay Desai.
Chapter 31 Solid-State Welding Processes
Commercial Floor Systems
Flexible Manufacturing
Bolts in Tension pt 2 Andrei Lozzi
Competency: Draw wall sections and details
LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary
Drawing generation plugin
(i) proper arrangement of reinforcing bars and
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
Stainless Steel Water Well Casing.
Arch205 building construction wall systems- Steel
Activity 2.2.1a Action Reaction Construction Guide
Sections.
Competency: Draw wall sections and details
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Commercial Floor Systems
2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
ESS Concrete Pit Lids.
STEEL PLATES.
АВЛИГАТАЙ ТЭМЦЭХ ҮНДЭСНИЙ ХӨТӨЛБӨР /танилцуулга/
Senad Kudumovic Design engineer
Bunker Wall Design Wall
Bunker Wall Design Wall ESS
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
SNS PPU Cryomodule Space Frame
Presentation transcript:

ESS Concrete Pit Lids

Pit Lids Context

Pit Lids Context This is the Maintenance Cell, which has a number of pits in. Official - Sensitive - Commercial

Pit Lids Context Official - Sensitive - Commercial

Pit Lids Context Only the Storage Pit Lids are made from concrete, these are what we are interested in Official - Sensitive - Commercial

Pit Lids Context This image shows all of the Pit Lid Sections, as Pit Lid A is replicated across all. The next slide shows each in closer detail. Official - Sensitive - Commercial

Pit Lid Variants Official - Sensitive - Commercial

Pit Lid Construction 4mm cladding stainless steel (304 or cheaper)  increase to 12mm 50mm base plate stainless steel (304 or cheaper) Grapple Interface (Stainless (304 or cheaper)) with tie rods to base plate Heavy concrete (Magnadense equivalent) internal Rebar design similar to as shown Official - Sensitive - Commercial

Questions 4mm and 12mm cladding (most probably 12mm) How much will removing the need for formwork reduce our costs/time (likely)? Manufacturing Considerations Do you think it is possible to assemble the rebar, mount onto base plate and weld up the cladding around it, before pouring the concrete? Is there a different way it could be manufactured? Is there a different design construction which may aid our costs? How might we simplify the manufacture? How might we arrange the rebar in the top shelf appropriately, allowing overlap with the longitudinal rebar? How might you suggest assembling in the grapple interface Official - Sensitive - Commercial

Rebar construction Check void requirements Official - Sensitive - Commercial

Studding details We are considering a set of studs along the base to increase corner strength Official - Sensitive - Commercial