LS1 BLM@LHC status 24/03/2014.

Slides:



Advertisements
Similar presentations
January 6. January 7 January 8 January 9 January 10.
Advertisements

MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
Alfa-Omega Team Coordination LS1 Collaboration Seminar, 27 th November 2014 Anna Chrul, IFJ PAN Kraków.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
LS1 status 6/06/2014. BLM re-installation ARC Sector 3-4 – in work, will be done to Sector 4-5 – from 30(23).06 – Sector for Cool.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
Report Technical Director Storage-Ring-Installation Completed
PIXEL CAEN Installation Status
Resource Loaded Schedule and Budget Profile
Cabling for LHCb Upgrade
SPS LS1 Planning meeting (N019) 04/09/13
ELENA installation and commissioning status
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
News about the WA104 Programme
Injectors BLM system: PS Ring installation at EYETS
SPS - EYETS 2016/17 Vacuum systems planning
on behalf of the RF group
Helium spill in LHC tunnel
T1 Electronic status Conclusions Electronics Cards:
n_TOF “Draft” plans for YETS and LS2
Injection region BLMs – ECR
Mini-drawers, FE-ASIC , Integrator
ELENA electron cooler and SEM grids status
Renovation of the 45-year old PS magnets
LS1 TE/MPE/EE CABLE ACTIVITIES
Control systems plans & activities for HL-LHC during LS2
Bernd Panzer-Steindel CERN/IT
Disabling Rules.
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
GIS Portal Racks Project
ACS news Circulator TCU: control tests in progress All cavity racks
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
BLM planning 24/02/2014.
BLM planning 03/03/2014.
LS1 status 28/04/2014.
07/07/2014 * status, all * AccTest framework
LS1 status 17/03/2014.
RPC Readiness for installation
McDonald’s calendar 2007.
LS1 status 07/04/2014.
MONTHS OF THE YEAR January February April March June May July August
McDonald’s calendar 2007.
BLM planning 03/02/2014.
UPPSALA UNIVERSITY_GERSEMI PROJECT
Week 43 ( LHC only) Installation of BLECF in LSS 4L and LSS 4R (Adrien and Mounir) - Done Check and repairs of BLECF in LSS 4L and LSS 4R (Steve) -? Installation.
2015 January February March April May June July August September
CSC Electronics Installation and Commissioning CSCE I&C
SPS Injection BIS - Draft requirements
Presentation transcript:

LS1 BLM@LHC status 24/03/2014

Surface racks Pt4 - dismounted: - 4 extensions in hall of P4   P2 -/+, to change the configuration P1, P3, P5, P6 , P7, P8 Pt4 - dismounted: - 4 extensions in hall of P4 - 1 door from P3 - bld 283 - ventilators are in Christos’s office - BL electronics - Seghaier for cleaning Rack configuration: R L I C

BLM re-installation (1) Current status of DS+ARC installation: Sector 6-7 - done Sector 5-6 – done April 2nd – Russian Team exchange ( to 30.06) Sector 7-8 - done Requested SEMs was dismounted in L8 Sector 8-1: start at R8 Requested SEMs was dismounted in R8 as well as LICs at R7 -New Installation ( +LHCb) -Ion’s Request for new installation From: John Jowett Sent: 21 March 2014 16:16 Subject: RE: RE: BLMs for heavy ion losses IR2, both left and right, where we seem to be missing coverage is in the connection cryostat next to the Q11. Can we have some BLMs there even though they are not “shielded” by a magnet cold-mass ? IR1 and IR5: similarly for the connection cryostat. In general, if “coupling” the BLMs means not knowing which of two BLMs has the higher loss, then we should avoid doing so. - Barbara’s request to dismount SEMs and install LICs in P6 ( mail form 13.03.2014). - BLMQI.01L8.B1E30)MQXA(BPMSW) - change of expert name ( Christos question from 10.03) List what we need to be work before RSM: Installation, surface rack, tunnel rack, DB, … Request to move the source on surface – Procedure LSS installation (MKI,MKD)

BLM re-installation (2) LIC: installation and fixation On Support : Exchange to this type On cryostat : Fit to LIC

Divers Slot Labels for 4 sectors ( after changes of expert names) – beginning of April (2nd Rteam) Label for new “short” cable (BJBDV - BJBAP), ECR for HV divider is released Coating of rest of supports and brides to outside of CERN, RAL3020 + schedule? Plastic boxes and old supports from tunnel to SPS storage bld (Remo?) – beginning of April , 2nd team will take it from 4 sectors Order the additional materials for installation: 1000 m(HV) and 3000 m(BNC) cables; 35 bobins (*45 m in each) of metallic strips. Rad Source test ( 2 sources ) ready to end of July LIC’s tests and shrinking at GIF is done FIC production : Materials to send: resistors ordered but 1 month delivery List of materials, cost and amount of IC new production ( Q4,2013-Q1,2014)

GIF and GIF++ GIF: May 2013-remove the barrack shrinking machine to …? GIF and GIF++ status: GIF will operate up to Middle of August, 2013 (FIC tests in July, 2013) GIF++ will operate from Middle of January, 2014 (IC tests in February,2014) GIF: May 2013-remove the barrack shrinking machine to …? GIF++: install the cables in May 2013(? Insulated patch panels) New EDH access to bunker

Tunnel racks and HV divider HV divider installation: Installed in all “standard” locations in all Points, except L6 In “special cases” – not installed, but long cables was ordered ( Remo) - ? L5: restoration of racks after He spill test Racks – CFC cards : ready for installation ( Ion or Russian team)