1200 West Widening and Reconstruction Project

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Cost Estimation System Tool
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
6 th Street Water Main And Street Reconstruction 2013.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
Mississippi DOT Roadsides, Drainage & Vegetation Management Standards.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Golden Triangle Blvd. Progress Report March 27, 2007.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Trail Funding Sources & General Information
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
In association with: 73 rd Street to Indian Bend Wash Bridge THOMAS ROAD STREETSCAPE 73 RD STREET TO INDIAN BEND WASH BRIDGE PROJECT NO. T0606 City of.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
Phase 2: 30% Design Plans September 4 th, 2012.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Community Development Department Construction Phase BULLDOG DRIVE.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
MD 30 (Hanover Pike) at Mt. Gilead Road
Pioneer Road Relocation and Reconstruction Project
2nd Street Drainage and Paving Improvements
Secor Road Reconstruction Project Public Meeting #2
Jefferson County SA Red Rocks Site Approval
Hazel Avenue Widening Project Presentation To CGSA April 25, 2017
Urban Renewal and Tax Increment Financing
District 3 Complete Streets Projects
DICKINSON AVENUE RECONSTRUCTION
River to Sea TPO Meeting US 92/International Speedway Boulevard
IA 122 RECONSTRUCTION PRE-BID MEETING
SW 6th Ave. Fairlawn to Gage
Highway 169 Bridge Replacement & Pavement Resurfacing
SE 12th Street Roadway Improvements February 8, 2005.
SW 6th Ave. – Fairlawn to Gage
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Contract 60X10 Informational Meeting Weber I-55
Stockton City Council December 6, 2007 Land Use Diagram Changes
1700 South Widening and Reconstruction Project
Walker Street Reconstruction Project 25% Design Public Hearing
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Highway engineering a.L Rasha jasim mohamed Al. Rasha j. mohammed
Presentation transcript:

1200 West Widening and Reconstruction Project October 20, 2016

Project Location: From 400 North to 900 North (Farr West/Marriott-Slaterville City boundary)

1200 West Widening Project Overview Explain the purpose of the project Explain project funding Review the proposed improvements

1200 West Widening Project Purpose Widen and provide roadside improvements along 1200 West, between 400 North and City boundary (900 North) New traffic signal at 400 North and 1200 West Remove and provide updated utilities and drainage facilities

1200 West Widening Project Funding Surface Transpiration Program (STP) Application submitted October 2015 Approved – 5 year plan STP funds pay 94% of improvements BDO will contribute the remaining 6% Estimated project cost = $6,820,400.00

1200 West Widening Project Improvements Signalized intersection at 400 N. and 1200 W. Widen Road to 66’ Right-Of-Way (Widening to occur on BDO side)

Existing Right of Way New Right of Way Existing Right of Way New Right of Way

1200 West Widening Project Improvements Signalized intersection at 400 N. and 1200 W. Widen Road to 66’ Right-Of-Way (Widening to occur on BDO side) Three 12’ travel lanes with 8’ shoulders 4’ sidewalk (west) Provide 10’-0” future ROW Provide 30’-0” BDO buffer 8’ meandering sidewalk w/ landscape berm (east)

4’ Sidewalk 8.5’ Shoulder 12’Travel Lane 12’ Median 12’Travel Lane 8.5’ Shoulder 10’ Future ROW 30’ BDO Buffer with 8’ Sidewalk and Berm

New 10”PVC Sewer New 18”RCP Storm Drain

1200 West Widening Project Conclusion Widening 1200 West between 400 North and City boundary Project to be funded federally (STP) New signalized intersection at 400 North Sidewalk and additional improvements Updated utilities and drainage improvements

Questions?