1200 West Widening and Reconstruction Project October 20, 2016
Project Location: From 400 North to 900 North (Farr West/Marriott-Slaterville City boundary)
1200 West Widening Project Overview Explain the purpose of the project Explain project funding Review the proposed improvements
1200 West Widening Project Purpose Widen and provide roadside improvements along 1200 West, between 400 North and City boundary (900 North) New traffic signal at 400 North and 1200 West Remove and provide updated utilities and drainage facilities
1200 West Widening Project Funding Surface Transpiration Program (STP) Application submitted October 2015 Approved – 5 year plan STP funds pay 94% of improvements BDO will contribute the remaining 6% Estimated project cost = $6,820,400.00
1200 West Widening Project Improvements Signalized intersection at 400 N. and 1200 W. Widen Road to 66’ Right-Of-Way (Widening to occur on BDO side)
Existing Right of Way New Right of Way Existing Right of Way New Right of Way
1200 West Widening Project Improvements Signalized intersection at 400 N. and 1200 W. Widen Road to 66’ Right-Of-Way (Widening to occur on BDO side) Three 12’ travel lanes with 8’ shoulders 4’ sidewalk (west) Provide 10’-0” future ROW Provide 30’-0” BDO buffer 8’ meandering sidewalk w/ landscape berm (east)
4’ Sidewalk 8.5’ Shoulder 12’Travel Lane 12’ Median 12’Travel Lane 8.5’ Shoulder 10’ Future ROW 30’ BDO Buffer with 8’ Sidewalk and Berm
New 10”PVC Sewer New 18”RCP Storm Drain
1200 West Widening Project Conclusion Widening 1200 West between 400 North and City boundary Project to be funded federally (STP) New signalized intersection at 400 North Sidewalk and additional improvements Updated utilities and drainage improvements
Questions?